Stormwater Management Program
for
 
2024
Storm Water Solutions, LLC

Page 2

Table of Contents
Part I. – General Permit Requirements … 1
Permit Overview … 1
Regulated MS4 Operators … 1
Legal Authority … 2
Location … 2
Resources … 2
Reporting Year … 2
Record Keeping … 3
Effluent Limitations … 3
Enforcement Measures/Standard Operating Procedures … 3
Implementation … 3
Public Notice Requirements … 4
Noncompliance Notification … 4
Part II – Minimum Control Measures … 5
SWMP Overview … 5
MCM 1.0 Public Education and Outreach…………………….… … 6
1.1​ Promote, Host, or Develop Educational Meetings, Seminar, or Training … 6
1.2​ Stormwater Website … 7
1.3​ Fact Sheets/Brochures/Utility Bill Inserts/Door Hanger … 9
1.3.1​
Targeted Education Campaign via mail, email, or in person … 9
MCM 2.0 Public Involvement/Participation………………………… … 12
​
2.1. Stormwater related speaker series……………………………………………………12
​
2.2. Stormwater survey.…...………………………………………………….……….…..13
​
2.3. Public Meeting for input on the Program…………………………………………….14
MCM 3.0 Illicit Discharge Detection and Elimination (IDDE) … 16
3.1 Illicit Discharge Detection and Elimination Program … 16
MCM 4.0 Construction Site Stormwater Runoff Control … 20
4.1 Construction Site Stormwater Runoff Control Program … 20
MCM 5.0 Post-Construction Stormwater Management in New Development and Redevelopment … 24
5.1 Post-Construction Stormwater Maintenance Program … 24
MCM 6.0 Pollution Prevention and Good Housekeeping for Municipal Operations … 28
6.1​ Operations and Maintenance Program … 28
MCM 7.0 Industrial Stormwater Sources … 33
MCM 8.0 Authorization for Construction Activities where the MS4 Operator is the Site Operator… … 33
Part III – Appendices … 34
References … Appendix A
Location Map 1 –   Aerial … Appendix B
TXR040000 … Appendix C
Notice of Intent (NOI) … Appendix D
2

Page 3

Part I - General Permit Requirements
Permit Overview
The Texas Commission on Environmental Quality (TCEQ) issued the Texas Pollutant Discharge
Elimination System (TPDES) General Permit Number TXR040000 (the permit) on August 15,
2024 with an effective date of August 15, 2024. This permit supersedes and replaces the TPDES
General Permit No. TXR040000, issued January 24, 2019. The permit provides authorization for
stormwater and certain non-stormwater discharges from Small Municipal Separate Storm Sewer
Systems (MS4s) to surface waters of the State.
The underlying purpose of the permit is to require regulated MS4’s to reduce the discharge of
pollutants from the MS4 to the maximum extent practicable (MEP), to protect water quality, and
to satisfy the appropriate water quality requirements of Section 402 of the Clean Water Act and
Section 26.040 of the Texas Water Code.
In order to achieve these goals, the permit requires regulated MS4s to submit a Notice of Intent
(NOI) and develop and manage a Stormwater Management Program (SWMP) for all stormwater
discharges that reach waters of the United States, regardless of whether the discharge is conveyed
through a separately operated storm sewer system. A MS4 Operator that implements its ​
SWMP and the selected Best Management Practices (BMPs) in accordance with the permit, will
be considered meeting the standard of reducing pollutants to the MEP, and will be deemed in
compliance with the permit.
Regulated MS4 Operator
Applicants
​
​
District Name addresses:
 ​
c/o Coats Rose, PC
​
​
​
9 Greenway Plaza, Ste. 1000
​
​
​
Houston, TX 77046
  (regulated MS4 Operator) is
solely responsible for developing and implementing all elements of this SWMP.
1

Page 4

Legal Authority
The Regulated MS4 is a body politic and a political subdivision of the State of Texas created
under the authority of Article XVI, Section 59 of the Texas Constitution and operating under and
governed by the provisions of Chapters 49 and 54 of the Texas Water Code, as amended. The
MS4 Operator owns and operates a municipal separate storm sewer system and is considered a
“Non-traditional Small MS4 Operator” as defined in the permit. TXR040000 defines the MS4
Operator as a Level 2b MS4 and the MS4 Operator obligated to comply with all requirements, to
develop rules and regulations, and to exert enforcement actions to require compliance with this
SWMP. Such required compliance may be implemented by the incorporation of rules and
penalties into the MS4 Operator’s Rate Order or the MS4 Operator’s adoption of rules and
regulations via resolution of the MS4 Operator’s Board of Directors (which would serve the same
function as an ordinance). Over the course of the permit term, the MS4 Operator will use its
Stormwater Guidance Manual, which outlines procedures to inspect third party actions from
contractors, builders, and other potential polluters within its jurisdiction and to ensure compliance
with this SWMP.
Location of the MS4 Operator
  jurisdiction lies wholly within the
2020 Census City of Austin Urban Area with the approximate center located at the following
Latitude/Longitude: 30.327, -98.030. See Location Map (Appendix B) for the District’s
jurisdiction.
Resources
Although financial resources are limited and the demand for funding is ever-increasing, the MS4
Operator will ensure its annual budget includes adequate financial resources for proper
implementation of the SWMP. There will be a team of consultants reporting to the MS4 Operator
on a regular basis to ensure that SWMP implementation stays on schedule and within the budget.
Reporting Year
The MS4 Operator’s reporting year aligns with the calendar year. The first annual report for this
general permit will address the period beginning on the day that authorization is obtained and
ending on December 31 of that same year. Annual reports are due by March 31 every year.
2

Page 5

Record Keeping
The MS4 Operator will retain all records, a copy of the permit, and records of all data used to
complete the NOI for the permit and satisfy the public participation requirements, for a period of
at least three (3) years, or the remainder of the term of this general permit, whichever is longer.
The MS4 Operator will submit the records to the executive director when specifically asked to do
so. The SWMP will be retained at a location accessible to the TCEQ. The MS4 Operator will
make the NOI and the SWMP available to the public at reasonable times during regular business
hours, if requested to do so in writing. Copies of the SWMP will be made available within ten
(10) business days of receipt of a written request. Other records shall be provided in accordance
with the Texas Public Information Act.
The SWMP and its contents can be viewed at the following address:
Coats Rose, PC​​
​
​
​
Storm Water Solutions LLC
9 Greenway Plaza, Ste. 1000​
​
​
16110 Hollister Street
Houston, TX 77046​
​
​
​
Houston, TX 77066
Effluent Limitations
Effluent limitations for stormwater runoff are narrative and not numerical, requiring
implementation of best management practices to protect water quality to the maximum extent
practicable (MEP). The BMPs chosen for each MCM in this SWMP take into consideration
applicable effluent limitations and are in compliance with State of Texas rules and regulations.
Enforcement measures and Standard Operating Procedures
The MS4 Operator will adopt standard operating procedures (SOPs) over the course of the permit
term that outline how to respond to permit violations. These SOPs will be included in the MS4
Operator’s Stormwater Guidance Manual and will be reviewed and updated accordingly during
this permit term.
Implementation
The MS4 Operator does not have a paid staff of employees to implement the stormwater program.
Therefore, the MS4 Operator has engaged a Stormwater Consultant to direct program
implementation during the permit term. The Stormwater Consultant is responsible for
coordinating SWMP related activities including development of BMPs, correspondence with the
TCEQ, preparing the Annual Reports, and other activities, to comply with the permit conditions.
The Stormwater Consultant is responsible for coordinating efforts, including those of other
3

Page 6

consultants, related to compliance with TPDES Permit No TXR040000. The Stormwater
Consultant will set milestones and report directly to the MS4 Operator on a regular basis to keep
them apprised of the SWMP implementation progress. The following MS4 consultants will assist
in the implementation of the SWMP:
Attorney​
​
​
​
​
Stormwater Consultant
​
​
Coats Rose, PC​​
​
​
​
Storm Water Solutions LLC
​
9 Greenway Plaza, Ste. 1000​
​
​
16110 Hollister Street
​
Houston, TX 77046​
​
​
​
Houston, TX 77066
​
Engineer​
​
​
​
​
Operator
​
​
Westwood Professional Services, Inc.​
​
Inframark, LLC
​
8701 N. Mopac Expy, Suite 320​​
​
 
​
Austin, TX 78759​
​
​
​
Cedar Park, TX 78613
Public Notice Requirements
From time to time, the MS4 Operator may be required to follow public notice guidelines during
the permit term. The MS4 Operator will comply with any applicable public notice requirements
when publishing the SWMP and applicable paperwork.
Noncompliance Notification
As required, the MS4 Operator will report any noncompliance which may endanger human health
or safety or the environment immediately to the TCEQ regional office. The MS4 Operator will
also provide a written report to the appropriate TCEQ regional office and to the TCEQ
Enforcement Division (MS-224) within five working days of becoming aware of the
noncompliance. The written report will contain:
●​ A description of the noncompliance and its cause;
●​ The potential danger to human health or safety, or the environment;
●​ The period of noncompliance, including exact dates and times;
●​ If the noncompliance has not been corrected, the anticipated time it is expected to
continue; and
●​ Steps taken or planned to reduce, eliminate, and prevent recurrence of the
noncompliance, and to mitigate its adverse effect.
4

Page 7

Part II – Stormwater Management Program
Overview of SWMP and Minimum Control Measures
The underlying purpose of the permit is to require regulated small MS4s to reduce the discharge
of pollutants from the MS4 to the MEP, to protect water quality, and to satisfy the appropriate
water quality requirements of Section 402 of the Clean Water Act and Section 26.040 of the
Texas Water Code. In order to achieve these goals, the MS4 is required to develop and manage a
Stormwater Management Program for all stormwater discharges that reach waters of the United
States, regardless of whether the discharge is conveyed through a separately operated storm sewer
system.
The MS4 Operator has included the following Minimum Control Measures (MCMs) and the
selected Best Management Practices (BMPs) in accordance with the permit in order to meet the
standard of reducing pollutants to the MEP.
The MS4 Operator discharges directly into Buttercup Creek, a non-designated segment, which
then flows into South Brushy Creek (1244D), an unclassified and unimpaired stream. The MS4
Operator also discharges into Lake Creek (1244B), which is an unclassified and unimpaired
stream. These water bodies ultimately flow into Brushy Creek (1244), a classified stream
impaired by bacteria. Additionally, the MS4 Operator discharges into a non-designated stream,
Cypress Creek, which subsequently flows into Lake Travis (1404), an unimpaired water body.
A TMDL has not been adopted/established by the TCEQ for this Brushy Creek (1244), however
it is on the CWA 303(d) list. Brushy Creek (1244) is designated Category 5r, indicating that a
Watershed Protection Plan (WPP) is under development.
The Texas Water Resources Institute (TWRI) is currently conducting a watershed characterization
study for Brushy Creek to assess pollution sources and develop targeted water quality
improvement strategies. As this WPP progresses, the MS4 Operator will review and consider
integrating applicable recommendations into future updates of this SWMP to support bacteria
reduction efforts in the watershed. Since the MS4 Operator does not directly discharge into
Brushy Creek (1244), a dedicated program for addressing impaired water bodies is not required
under this SWMP.
5

Page 8

MCM 1.0 Public Education and Outreach
Summary/Rationale
Public education is an important aspect of the overall nation-wide stormwater program. A public
education and outreach program will be developed and updated accordingly during this permit
term. Educational materials will be developed in accordance with new permit requirements. An
avenue to be used is the website, https://wtcmud1.org/. The MS4 Operator’s public education and
outreach program will use educational materials to inform these users of the stormwater
conveyance system about the SWMP. The MS4 Operator will document the activities conducted
as part of this MCM. These records, along with any changes made to the BMPs or the
corresponding implementation schedule, will be communicated in the annual report.
1.1​ Promote, Host, or Develop Educational Meetings, Seminar, or Training
Description
The training program is directed at applicable MS4 Operator consultants responsible for
goals relative to the SWMP, which include the public education, outreach and
involvement/participation goals, the IDDE program, construction stormwater runoff
control program, post-construction stormwater management, and pollution
prevention/good housekeeping, and members of the general public who may be in
attendance at regular District Board meetings. Training sessions will be used to educate
these parties on the requirements of TXR040000. The clear, specific, and measurable
goals for this activity are outlined in the tables below.
Implementation Schedule: ​
●​ Year 1: MS4 Operator consultants who regularly attend District Board meetings
and members of the public, who may be in attendance at District Board meetings,
will be educated on the Public Education and Outreach goals of the SWMP
during one regular meeting in the calendar year.
BMP/Activity
Measurable Goal
Deadline
Training & Education
Hold at least 1 training session per year Dec 31, 2025
●​ Year 2: MS4 Operator consultants who regularly attend monthly District
meetings and members of the public, who may be in attendance at District Board
meetings, will be educated on the Public Education and Outreach goals of the
SWMP during one regular meeting in the calendar year.
BMP/Activity
Measurable Goal
Deadline
Training & Education
Hold at least 1 training session per year Dec 31, 2026
6

Page 9

●​ Year 3: MS4 Operator consultants who regularly attend monthly District
meetings and members of the public, who may be in attendance at District Board
meetings, will be educated on the Public Education and Outreach goals of the
SWMP during one regular meeting in the calendar year
BMP/Activity
Measurable Goal
Deadline
Training & Education
Hold at least 1 training session per year Dec 31, 2027
●​ Year 4: MS4 Operator consultants who regularly attend monthly District
meetings and members of the public, who may be in attendance at District Board
meetings, will be educated on the Public Education and Outreach goals of the
SWMP during one regular meeting in the calendar year
BMP/Activity
Measurable Goal
Deadline
Training & Education
Hold at least 1 training session per year Dec 31, 2028
●​ Year 5: MS4 Operator consultants who regularly attend monthly District
meetings and members of the public, who may be in attendance at District Board
meetings, will be educated on the Public Education and Outreach goals of the
SWMP during one regular meeting in the calendar year.
BMP/Activity
Measurable Goal
Deadline
Training & Education
Hold at least 1 training session per year Dec 31, 2029
End of Permit Term Goal: All MS4 Operator consultants and members of the
public who were in attendance at regular board meetings will be educated on the
Public Education and Outreach goals of the SWMP and the requirements of
TXR040000.
Measurable Evaluation Criteria
●​ Meeting agenda
●​ Number of training sessions held
●​ Training material distributed at meetings
●​ Minutes of the meeting
1.2 Stormwater Website
Description
The MS4 Operator will use the Operator’s website, https://wtcmud1.org/ as the central
location of its SWMP information. Public documents, including the SWMP and the
annual report will be available for download. The website will showcase educational
materials, as well as announce relevant public participation opportunities. The website
will target required audiences in accordance with the TXR040000. Visitors will be able to
report illicit discharge and illegal dumping through the website, as well as reference
7

Page 10

informative material relative to the SWMP. The clear, specific, and measurable goals for
this activity are outlined in the tables below.
Implementation Schedule
●​ Year 1: The MS4 Operator’s SWMP and NOI will be uploaded to the district
website if approved in year 1.
BMP/Activity
Measurable Goal
Deadline
Upload annual report and new SWMP/NOI
Website updated
Dec. 31, 2025
Year 2: Make public education material available on website. Ensure the most
recently approved annual report, NOI and SWMP are available. Monitor and
respond to all complaints submitted through the website illicit discharge
complaint module.
BMP/Activity
Measurable Goal
Deadline
Respond to public complaints on website
Respond to 100% of complaints 3 business days
Upload annual report and new SWMP/NOI
Website updated
Dec. 31, 2026
Upload educational material
Website updated
Dec. 31, 2026
●​ Year 3: Make public education material available on website. Ensure the most
recently approved annual report, NOI and SWMP are available. Monitor and
respond to all complaints submitted through the website illicit discharge
complaint module.
BMP/Activity
Measurable Goal
Deadline
Respond to public complaints on website
Respond to 100% of complaints 3 business days
Upload annual report and new SWMP/NOI
Website updated
Dec. 31, 2027
Upload educational material
Website updated
Dec. 31, 2027
●​ Year 4: Make public education material available on website. Ensure the most
recently approved annual report, NOI and SWMP are available. Monitor and
respond to all complaints submitted through the website illicit discharge
complaint module.
BMP/Activity
Measurable Goal
Deadline
Respond to public complaints on website
Respond to 100% of complaints 3 business days
Upload annual report and new SWMP/NOI
Website updated
Dec. 31, 2028
Upload educational material
Website updated
Dec. 31, 2028
8

Page 11

●​ Year 5: Make public education material available on website. Ensure the most
recently approved annual report, NOI and SWMP are available. Monitor and
respond to all complaints submitted through the website illicit discharge
complaint module.
BMP/Activity
Measurable Goal
Deadline
Respond to public complaints on website
Respond to 100% of complaints 3 business days
Upload annual report and new SWMP/NOI
Website updated
Dec. 31, 2029
Upload educational material
Website updated
Dec. 31, 2029
●​ End of Permit Term Goal: Website will showcase educational material, receive
and track complaints, announce public participation events, as well as the NOI
and SWMP, and the most recent annual report.
Measurable Evaluation Criteria
●​ Number of reports/complaints
●​ Educational and regulatory items uploaded to website
1.3​Fact Sheets/Brochures/Utility Bill Inserts/Door Hangers
1.3.1​
Targeted Education Campaign via mail, email, or in person
Description
The public education program will be used to inform the public about the impacts that
pollution in stormwater run-off can have on water quality, hazards associated with
illegal/illicit discharges and improper disposal of waste, and ways to minimize the impact
on stormwater quality. These educational efforts will recommend methods to the MS4
Operator residents as to how they can identify and reduce pollution/illicit discharges.
Educational material will address lawn maintenance, pet wastes, and household
hazardous waste. Material will be posted on the website for public viewing. The clear,
specific, and measurable goals for this activity are outlined in the tables below.
Implementation Schedule
●​ Year 1: Research topics to use for utility bill inserts and targeted education.
BMP/Activity
Measurable Goal
Deadline
Utility Bill Inserts
Research topics
Dec. 31, 2025
Targeted Education
Research topics
Dec. 31, 2025
●​ Year 2: Approve design for the year 2 education material, in the form of a utility
bill insert (UBI), to be distributed in an annual mailing to at least 75% of District
residents. Perform 1 mailing to MS4 Operator residents. Post on website.
9

Page 12

BMP/Activity
Measurable Goal
Deadline
Presentation of targeted educational
material at District board meeting
Approve targeted educational
material for distribution
Dec 31, 2026
Presentation of UBI at District board
meeting
Approve UBIs for distribution
Dec 31, 2026
Mail and/or link QR code of targeted
educational material to UBI
Mail approved targeted educational
material to at least 75% of District
residents, and/or link a QR code of
the material to the UBI
Dec 31, 2026
Mail approved UBI
Mail approved UBI to at least 75%
of District residents
Dec. 31, 2026
Post educational material on website
website updated annually
Dec. 31, 2026
●​ Year 3: Approve design for the year 3 education material, in the form of a utility
bill insert (UBI), to be distributed in an annual mailing to at least 75% of District
residents. Perform 1 mailing to MS4 Operator residents. Post on website.
BMP/Activity
Measurable Goal
Deadline
Presentation of targeted educational
material at District board meeting
Approve targeted educational
material for distribution
Dec 31, 2027
Presentation of UBI at District board
meeting
Approve UBIs for distribution
Dec 31, 2027
Mail and/or link QR code of targeted
educational material to UBI
Mail approved targeted educational
material to at least 75% of District
residents, and/or link a QR code of
the material to the UBI
Dec 31, 2027
Mail approved UBI
Mail approved UBI to at least 75%
of District residents
Dec. 31, 2027
Post educational material on website
website updated annually
Dec. 31, 2027
●​ Year 4: Approve design for the year 4 education material, in the form of a utility
bill insert (UBI), to be distributed in an annual mailing to at least 75% of District
residents. Perform 1 mailing to MS4 Operator residents. Post on website.
BMP/Activity
Measurable Goal
Deadline
Presentation of targeted educational
material at District board meeting
Approve targeted educational
material for distribution
Dec 31, 2028
Presentation of UBI at District board
meeting
Approve UBIs for distribution
Dec 31, 2028
Mail and/or link QR code of targeted
educational material to UBI
Mail approved targeted educational
material to at least 75% of District Dec 31, 2028
10

Page 13

residents, and/or link a QR code of
the material to the UBI
Mail approved UBI
Mail approved UBI to at least 75%
of District residents
Dec. 31, 2028
Post educational material on website
website updated annually
Dec. 31, 2028
●​ Year 5: Approve design for the year 5 education material, in the form of a utility
bill insert (UBI), to be distributed in an annual mailing to at least 75% of District
residents. Perform 1 mailing to MS4 Operator residents. Post on website.
BMP/Activity
Measurable Goal
Deadline
Presentation of targeted educational
material at District board meeting
Approve targeted educational
material for distribution
Dec 31, 2029
Presentation of UBI at District board
meeting
Approve UBIs for distribution
Dec 31, 2029
Mail and/or link QR code of targeted
educational material to UBI
Mail approved targeted educational
material to at least 75% of District
residents, and/or link a QR code of
the material to the UBI
Dec 31, 2029
Mail approved UBI
Mail approved UBI to at least 75%
of District residents
Dec. 31, 2029
Post educational material on website
website updated annually
Dec. 31, 2029
●​ End of Permit Term Goal: At least 75% of all residents within the MS4
Operator’s jurisdiction will receive targeted educational material, and other
information on stormwater-related topics in the form of an UBI annually.
Updated educational information and the SMWP will be available on website.
Measurable Evaluation Criteria
●​ Educational material approved annually
●​ Educational material distributed annually
●​ Educational material intended to reach at least 75% of the intended audience
●​ Educational material posted on website annually
Interim Milestone for MCM 1.0
By the end of year 2, the website will be updated. By the end of year 3, MS4 Operator consultants
will have received at least 3 training sessions relative to the SWMP. Educational material will be
distributed annually starting in year 2.
11

Page 14

MCM 2.0 Public Involvement/ Participation
Summary/Rationale:
Public involvement and participation are critical components of the overall nationwide
stormwater program. Engaging the public in the development and implementation of the
Stormwater Management Program (SWMP) helps to foster a sense of community ownership and
responsibility for local water quality issues. A public involvement and participation program will
be developed, and updated accordingly, to create opportunities for the community to actively
participate in the SWMP. Public involvement efforts will include the stormwater related speaker
series BMP, the public meeting component to solicit input and feedback on stormwater
management practices and initiatives, as well as the use of surveys. The MS4 operator will
document these activities, and any changes made to BMPs or implementation schedule will be
communicated in the annual report.
2.1 Stormwater related speaker series
Description:
The MS4 Operator will organize and conduct a series of educational sessions known as
the Stormwater-Related Speaker Series. These sessions will feature an expert in
stormwater management or related fields. The purpose of this goal is to educate and
engage the community on stormwater management issues, pollution prevention, and best
practices. Each session will be designed to provide valuable information and encourage
proactive involvement in stormwater pollution prevention. The clear, specific, and
measurable goals for this activity are outlined in the tables below.
Implementation Schedule:
●​ Year 1: Members of the public who attend District Board meetings, will be
involved in the stormwater related speaker series during one regular meeting in
the calendar year.
BMP/Activity
Measurable Goal
Deadline
Stormwater speaker series
Research subjects
Dec 31, 2025
●​ Year 2: Members of the public who attend District Board meetings, will be
involved in the stormwater related speaker series during one regular meeting in
the calendar year.
BMP/Activity
Measurable Goal
Deadline
Stormwater speaker series
Hold at least 1 session per year at a public meeting Dec 31, 2026
12

Page 15

●​ Year 3: Members of the public who attend District Board meetings, will be
involved in the stormwater related speaker series during one regular meeting in
the calendar year.
BMP/Activity
Measurable Goal
Deadline
Stormwater speaker series
Hold at least 1 session per year at a public meeting Dec 31, 2027
●​ Year 4: Members of the public who attend District Board meetings, will be
involved in the stormwater related speaker series during one regular meeting in
the calendar year.
BMP/Activity
Measurable Goal
Deadline
Stormwater speaker series
Hold at least 1 session per year at a public meeting Dec 31, 2028
●​ Year 5: Members of the public who attend District Board meetings, will be
involved in the stormwater related speaker series during one regular meeting in
the calendar year.
BMP/Activity
Measurable Goal
Deadline
Stormwater speaker series
Hold at least 1 session per year at a public meeting Dec 31, 2029
●​ End of Permit Term Goal: Members of the public will receive 1 stormwater
speaker series session per year, starting in year 2.
Measurable Evaluation Criteria
●​ Stormwater related speaker series held 1 time per year, beginning in year 2.
2.2 Stormwater Survey
Description:
The MS4 Operator will conduct an annual survey to gather feedback from the community
on stormwater management practices and initiatives. The surveys can be distributed
through various channels, which may include a barcode, or a link to the survey’s website
on the utility bills and or/utility bill inserts sent to residents. A link may be provided on
the MS4 Operators website to ensure participation opportunities. The feedback obtained
may be used to improve the SWMP and its implementation efforts.
Implementation Schedule:
●​ Year 1: Research stormwater related topics and begin the creation of the survey.
BMP/Activity
Measurable Goal
Deadline
Survey
Research topics and begin creation of surveys Dec. 31, 2025
13

Page 16

●​ Year 2: Publish survey
BMP/Activity
Measurable Goal
Deadline
Survey
Distribute to at least 75% of the intended audience Dec. 31, 2026
●​ Year 3: Publish survey and review results
BMP/Activity
Measurable Goal
Deadline
Survey
Distribute to at least 75% of the intended audience Dec. 31, 2027
●​ Year 4: Publish survey and review results
BMP/Activity
Measurable Goal
Deadline
Survey
Distribute to at least 75% of the intended audience Dec. 31, 2028
●​ Year 5: Publish survey and review results
BMP/Activity
Measurable Goal
Deadline
Survey
Distribute to at least 75% of the intended audience Dec. 31, 2029
●​ End of Permit Term Goal: Members of the public will be given annual
opportunities to complete the survey and the feedback will be analyzed to
improve implementation efforts of the SWMP and address community concerns,
where necessary.
Measurable Evaluation Criteria
●​ Annual surveys to begin in year 2
●​ Advertised to reach at least 75% of the intended audience
2.3 Public Meeting for input on the Program
Description:
The MS4 Operator will have an agenda item for its regularly occurring public meetings.
This item will allow for community input and discussion on the stormwater management
program. These meetings will provide a platform for transparent communication and
encourage community participation in stormwater-related initiatives. The topics covered
will include an overview of the MS4 program, updates on recent and upcoming
stormwater goals, and discussion of challenges and opportunities in stormwater
management. The clear, specific, and measurable goals for this activity are outlined in the
tables below.
14

Page 17

Implementation Schedule:
●​ Year 1: Host at least one public meeting and allow for input on the program
implementation.
BMP/Activity
Measurable Goal
Deadline
Public meeting
Host at least one meeting annually
Dec. 31, 2025
●​ Year 2: Host at least one public meeting and allow for input on the program
implementation.
BMP/Activity
Measurable Goal
Deadline
Public meeting
Host at least one meeting annually
Dec. 31, 2026
●​ Year 3: Host at least one public meeting and allow for input on the program
implementation.
BMP/Activity
Measurable Goal
Deadline
Public meeting
Host at least one meeting annually
Dec. 31, 2027
●​ Year 4: Host at least one public meeting and allow for input on the program
implementation.
BMP/Activity
Measurable Goal
Deadline
Public meeting
Host at least one meeting annually
Dec. 31, 2028
●​ Year 5: Host at least one public meeting and allow for input on the program
implementation.
BMP/Activity
Measurable Goal
Deadline
Public meeting
Host at least one meeting annually
Dec. 31, 2029
●​ End of Permit Term Goal: Agenda item during public meeting to allow for input
on program implementation held at least once annually, and advertised to reach at
least 75% of the intended audience..
Measurable Evaluation Criteria
●​ Public meeting held at least once annually
●​ Advertised to reach at least 75% of the intended audience
Interim Milestone for MCM 2.0
Starting in year 2, the MS4 Operator will conduct a stormwater-related speaker series session
annually and publish a survey to gather community feedback on stormwater management
practices. By the end of year 3, the MS4 Operator will have hosted three public meetings
allowing for community involvement relative to the SWMP.
15

Page 18

MCM 3.0 Illicit Discharge Detection and Elimination (IDDE)
Summary/Rationale
Illicit discharges are a major source of pollution in the nation’s waterways. The MS4 Operator
will develop a Stormwater Guidance Manual. This Manual will outline detection and elimination
techniques and procedures. To the extent allowable under State and local law, a regulatory
mechanism will be established to prohibit and eliminate illicit discharges. In conjunction with the
regulatory mechanisms, appropriate actions and enforcement procedures for removing the source
of an illicit discharge will be reviewed, updated and implemented. A comprehensive map of the
conveyance system, including the locations of outfalls and the names and locations of Waters of
the U.S. receiving discharges, will be updated periodically to aid in the detection and elimination
of sources of illicit discharges. The following non-stormwater sources may be discharged from
the MS4 Operator as allowed under the general permit: water line flushing; runoff or return flow
from landscape irrigation, lawn irrigations, and other irrigation utilizing potable water,
groundwater, or surface water sources; discharges from potable water sources; diverted stream
flows; rising ground water and springs; uncontaminated ground water infiltration;
uncontaminated pumped ground water; foundation and footing drains; air conditioning
condensation; water from crawl space pumps; individual residential vehicle washing; flows from
wetlands and riparian habitats; dechlorinated swimming pool discharges; street wash water;
discharges or flows from emergency firefighting activities (emergency firefighting activities do
not include washing of trucks, runoff water from training activities, test water from fire
suppression systems, and similar activities); and other similar occasional incidental
non-stormwater discharges, unless the TCEQ develops permits or regulations addressing these
discharges. Onsite sewage disposal systems are not allowed in this District. The MS4 Operator
will document the activities conducted as part of this MCM. These records, along with any
changes made to the BMPs or the corresponding implementation schedule, will be communicated
in the annual report.
3.1 Illicit Discharge Detection and Elimination Program
Description
The MS4 Operator will implement, and enforce the IDDE program, which will be
outlined in the District’s Stormwater Guidance Manual (chapter 2) to detect, investigate,
and eliminate illicit discharge into the MS4. The program includes an annual update to
the MS4’s stormwater conveyance map, methods for training, procedures for tracing, and
procedures for removing the source. Chapter 2 of the Stormwater Guidance Manual,
16

Page 19

which will be the MS4’s IDDE Program, will be implemented as a part of its SWMP.
This chapter shall also include information regarding responses to, and investigations of,
illicit discharges and spills. If the illicit connection or illicit discharge is observed related
to another operator’s MS4, the MS4 Operator shall notify the other MS4 Operator within
48 hours of discovery. If impracticable, the MS4 Operator shall notify the appropriate
TCEQ regional office of the possible illicit connection. If another MS4 notifies the MS4
Operator of an illegal connection or an illicit discharge, then the MS4 Operator shall
follow the IDDE plan. The MS4 Operator will review and update the SWMP and IDDE
plan throughout the permit term as necessary. The MS4 Operator will also maintain
on-site procedures for responding to illicit discharges and spills and will include source
investigation and elimination, and conduct inspections deemed appropriate in response to
complaints. The clear, specific, and measurable goals for this activity are outlined in the
tables below.
Implementation Schedule
●​ Year 1: The stormwater consultant, or designated representative, will explain the
need to comply with the new conditions of the 2024 TXR040000 to the MS4
Operator consultants and customers in attendance at a regularly scheduled
meeting of the Board of Directors. Begin researching ways to incorporate
reporting mechanism into the District’s website.
BMP/Activity
Measurable Goal
Deadline
Attend Board of Directors meeting
Outline TXR040000 new permit terms Dec 31, 2025
Begin creation of reporting
mechanism
Reporting mechanism on website
Dec 31, 2025
●​ Year 2: The Stormwater consultant will begin creation of the District’s IDDE
Program. The criteria used for this program will be the requirements in the
TXR040000. Begin creation of the stormwater conveyance map. Respond to all
resident reports of illegal dumping and/or illicit discharges within 3 business
days. The MS4 Operator will hold at least 1 training session relative to IDDE and
other SWMP goals. Given that the MS4 Operator does not have field staff, the
training sessions will be performed during regularly scheduled Board meetings
for MS4 Operator consultants and members of the public in attendance at the
meeting.
BMP/Activity
Measurable Goal
Deadline
Begin creation of chapter 2 of GM
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2026
Begin creation of stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2026
17

Page 20

Monitor website for complaints
Respond to 100% of complaints
3 business
days
Training & Education on IDDE
Program
Hold at least 1 training sessions per year Dec 31, 2026
●​ Year 3: The Stormwater consultant will complete the District’s IDDE Program.
Continue creation of conveyance map. Respond to all customer reports of illegal
dumping and/or illicit discharges within 3 business days. The MS4 Operator will
hold at least 1 training session relative to IDDE and other SWMP goals. Given
that the MS4 Operator does not have field staff, the training sessions will be
performed during regularly scheduled Board meetings for MS4 Operator
consultants and members of the public in attendance at the meeting.
BMP/Activity
Measurable Goal
Deadline
Complete chapter 2 of GM
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2027
Continue creation stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2027
Monitor website for complaints
Respond to 100% of complaints
3 business
days
Training & Education on IDDE
Program
Hold at least 1 training sessions per year Dec 31, 2027
●​ Year 4: The Stormwater consultant will implement the District’s IDDE Program.
Updates will be made as necessary. Complete stormwater conveyance map.
Respond to all customer reports of illegal dumping and/or illicit discharges
within 3 business days. The MS4 Operator will hold at least 1 training session
relative to IDDE and other SWMP goals. Given that the MS4 Operator does not
have field staff, the training sessions will be performed during regularly
scheduled Board meetings for MS4 Operator consultants and members of the
public in attendance at the meeting.
BMP/Activity
Measurable Goal
Deadline
Implement chapter 2 of GM
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2028
Review & update chapter 2 of GM,
as necessary
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2028
Complete stormwater conveyance
map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2028
Monitor website for complaints
Respond to 100% of complaints
3 business
days
Training & Education on IDDE
Program
Hold at least 1 training sessions per year Dec. 31, 2028
18

Page 21

●​ Year 5: The Stormwater consultant will review and update the District’s IDDE
Program, as necessary. Review map for update. Respond to all customer reports
of illegal dumping and/or illicit discharges within 3 business days. The MS4
Operator will hold at least 1 training session relative to IDDE and other SWMP
goals. Given that the MS4 Operator does not have field staff, the training sessions
will be performed during regularly scheduled Board meetings for MS4 Operator
consultants and members of the public in attendance at the meeting.
BMP/Activity
Quantifiable Target/Objective
Deadline
Implement chapter 2 of GM
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2029
Review & update chapter 2 of GM,
as necessary
Chapter 2 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2029
Review and update stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2029
Monitor website for complaints
Respond to 100% of complaints
3 business
days
Training & Education on IDDE
Program
Hold 1 training sessions per year
Dec 31, 2029
●​ End of Permit Term Goal: The IDDE Program will be updated and implemented.
A comprehensive map of the MS4’s stormwater conveyance system will be up to
date.
Measurable Evaluation Criteria
●​ Meeting agenda item for public involvement, necessary training, and education
●​ Meeting minutes
●​ Chapter 2 of the GM
●​ Stormwater conveyance map
Interim Milestone for MCM 3.0
By the end of year 3, three training sessions will be held for District consultants and customers in
attendance of the Board meeting where training was held. The stormwater conveyance map will
be completed.
19

Page 22

MCM 4.0 Construction Site Stormwater Runoff Control
Summary/Rationale
Construction site runoff can be a major source of pollution of the nation’s waterways. This source
of pollution is so impactful that a separate stormwater permit (TXR150000) has been issued to
regulate these pollutants, including trash, chemicals, and other harmful contaminants. The MS4
Operator, to the extent allowable under State and local law will implement, and enforce a
program to reduce pollutants in any stormwater runoff from construction activities that result in a
land disturbance of greater than or equal to one acre including projects less than one acre that are
part of a larger common plan of development or sale that will result in disturbance of one or more
acres. The program will be outlined in the MS4 Operator’s Stormwater Guidance Manual and will
require construction site operators to implement erosion and sediment control practices as well as
manage construction site stormwater runoff, as required by the Construction General Permit
(CGP) TXR150000. The program will include the implementation of a regulatory mechanism to
require erosion and sediment controls, as well as sanctions to ensure compliance, to the extent
allowable under State and local law. Procedures will be reviewed and updated as necessary for
site inspections, enforcement of resolution, consideration of public input, and site plan review to
consider water quality impacts. The MS4 Operator will review and update the Stormwater
Guidance Manual throughout the permit term, as necessary. Updates will ensure that the
Construction Site Runoff Control Program, which consists of a Construction Operation Program,
a Construction Plan Review Process, and a Construction Site Inspection and Enforcement
Program all meet the standards of the current TXR150000. Where applicable, the District shall
also reference and incorporate compliance with any Water Pollution Abatement Plan (“WPAP”)
required by, and in compliance with, the Edwards Aquifer Rule (30 TAC Chapter 213). The MS4
Operator will document the activities conducted as part of this MCM. These records, along with
any changes made to the BMPs or the corresponding implementation schedule, will be
communicated in the annual report.
4.1 Construction Site Runoff Control Program
Description
The MS4 Operator will implement and enforce this program requiring operators of small
and large construction activities to select, install, implement, and maintain stormwater
control measures that prevent illicit discharges to the maximum extent practicable. The
program also includes the implementation of a regulatory mechanism, as well as
sanctions to ensure compliance to the extent allowable under law, to require erosion and
20

Page 23

sediment control. As part of the Construction Site Runoff Program that will be outlined in
the Stormwater Guidance Manual, the Construction Operations Program details the
methods of ensuring the Stormwater Pollution Prevention Plan (SWPPP) is in accordance
with the TXR150000. This program details how the MS4 Operator will maintain and
implement site plan review procedures. The MS4 Operator will develop and update
inspection procedures where necessary for large and small construction projects. This
program will outline methods relative to the construction site inspection and enforcement
requirements. The clear, specific, and measurable goals for this activity are outlined in the
tables below.
Implementation Schedule
●​ Year 1: The stormwater consultant, or designated representative, will explain the
need to comply with the new conditions of the 2024 TXR040000 to the MS4
Operator consultants and members of the public in attendance at a regularly
scheduled meeting of the Board of Directors.
BMP/Activity
Measurable Goal
Deadline
Attend Board of Directors meeting
Outline TXR040000 new permit terms Dec 31, 2025
●​ Year 2: The stormwater consultant will begin creation of the Construction Site
Stormwater Runoff Program (Chapter 3 of Stormwater Guidance Manual). The
MS4 Operator will hold at least one training session relative to Construction Site
Stormwater Runoff Control and other SWMP goals. Given that the MS4
Operator does not have field staff, the training sessions will be performed during
regularly scheduled Board meetings for MS4 Operator consultants and members
of the public in attendance at the meeting.
BMP/Activity
Quantifiable Target/Objective
Deadline
Begin creation of chapter 3 of GM Chapter 3 will comply with the new
construction provisions of TXR040000
Dec. 31, 2026
Review NOIs for new construction
sites
Review of 100% of NOIs received for
new construction projects by District’s
engineer
30 days from
NOI filing
date
Training & Education on
Construction Site Stormwater
Runoff Control
Hold 1 training sessions per year
Dec 31, 2026
●​ Year 3: The stormwater consultant will complete the Construction Site
Stormwater Runoff Program which will be outlined in the Stormwater Guidance
Manual. The MS4 Operator will hold at least one training session relative to
Construction Site Stormwater Runoff Control and other SWMP goals. Given that
the MS4 Operator does not have field staff, the training sessions will be
21

Page 24

performed during regularly scheduled Board meetings for MS4 Operator
consultants and members of the public in attendance at the meeting.
BMP/Activity
Measurable Goal
Deadline
Complete chapter 3 of GM
Chapter 3 will comply with the new
construction provisions of TXR040000
Dec. 31, 2027
Training & Education on
Construction Site Stormwater
Runoff Control
Hold at least 1 training session per year
Dec. 31, 2027
●​ Year 4: Implement the Construction Site Runoff Control Program as outlined in
the Stormwater Guidance Manual. The MS4 Operator will hold at least one
training session relative to Construction Site Stormwater Runoff Control and
other SWMP goals. Given that the MS4 Operator does not have field staff, the
training sessions will be performed during regularly scheduled Board meetings
for MS4 Operator consultants and members of the public in attendance at the
meeting.
BMP/Activity
Measurable Goal
Deadline
Review chapter 3 of GM
Chapter 3 will comply with the new
construction provisions of TXR040000
Dec. 31, 2028
Implement chapter 3 of GM
Chapter 3 will comply with new IDDE
provisions of TXR040000
Dec. 31, 2028
District engineer will review 100% new
construction site plans and review
procedures annually
30 days from
receipt of
plans
Review and update inspection procedures
where applicable
Dec. 31, 2028
Conduct inspections at a minimum of 80%
of active construction sites where
applicable
Dec. 31, 2028
Conduct follow up inspections in 100% of
cases where necessary
Dec. 31, 2028
Review 100% of NOIs received for new
construction projects by District’s
engineer/stormwater consultant
30 days from
NOI filing
date
Training & Education on
Construction Site Stormwater
Runoff Control
Hold at least 1 training session per year
Dec 31, 2028
22

Page 25

●​ Year 5: Implement the Construction Site Runoff Control Program as outlined in
the Stormwater Guidance Manual. The MS4 Operator will hold at least one
training session relative to Construction Site Stormwater Runoff Control and
other SWMP goals. Given that the MS4 Operator does not have field staff, the
training sessions will be performed during regularly scheduled Board meetings
for MS4 Operator consultants and members of the public in attendance at the
meeting.
BMP/Activity
Measurable Goal
Deadline
Review chapter 3 of GM
Chapter 3 will comply with the new
construction provisions of TXR040000
Dec. 31, 2029
Implement chapter 3 of GM
Review and update District’s Rate Order
where applicable
Dec. 31, 2029
District engineer will review 100% new
construction site plans and review
procedures annually
30 days from
receipt of
plans
Review and update inspection procedures
where applicable
Dec. 31, 2029
Conduct inspections at a minimum of 80%
of active construction sites where
applicable
Dec. 31, 2029
Conduct follow up inspections in 100% of
cases where necessary
Dec. 31, 2029
Review 100% of NOIs received for new
construction projects by District’s
engineer/stormwater consultant
30 days from
NOI filing
date
Training & Education on
Construction Site Stormwater
Runoff Control
Hold at least 1 training session per year
Dec. 31, 2029
●​ End of Permit Term Goal: The Construction Site Stormwater Runoff Control
Program (TXR040000 and TXR150000) will be implemented throughout the
MS4 Operator’s jurisdiction on all new construction sites in accordance with the
GM and SWMP.
Measurable Evaluation Criteria
●​ Meeting agenda item for public involvement, necessary training, and education
●​ Meeting minutes
●​ Chapter 3 of the GM
●​ Number of NOIs received by the District’s engineer
●​ Number of new construction plans reviewed by District’s engineer
23

Page 26

Interim Milestone for MCM 4.0
By the end of year 3, chapter 3 of the GM will be completed.
MCM 5.0 Post-Construction Stormwater Management in New Development and ​
Redevelopment
Summary/Rationale
Stormwater runoff from existing development, as well as redevelopment in previously developed
areas can be a major source of pollution, including bacteria, fertilizers, pesticides, trash, and other
harmful contaminants. To the extent allowable under State and local law, the MS4 Operator will
implement and enforce the Standard Operating Procedures (SOPs) that will be detailed in the
Stormwater Guidance Manual to address stormwater runoff from new development and
redevelopment projects that disturb greater than or equal to one acre of land, including projects
less than one acre that are part of a larger common plan of development or sale that will result in
disturbance of one or more acres. The Stormwater Guidance Manual will work in tandem with the
MS4 Operator’s adopted regulatory mechanism to address structural/nonstructural controls on
new development and redevelopment, as well as sanctions to ensure compliance, to the extent
allowable under State and local law. The MS4 Operator will document the activities conducted
and the amount of resources/materials used. These records, along with any changes made to the
BMPs or the corresponding implementation schedule, will be communicated in the annual report.
5.1 Post-Construction Stormwater Maintenance Program
Description
A chapter in the MS4 Operator’s Stormwater Guidance Manual will be developed,
reviewed and updated in accordance with the new TXR040000. This chapter will address
the MS4 Operator’s approach to Post-Construction Stormwater Maintenance in New
Development and Redevelopment. This chapter will also address the use and
recommended implementation of structural/nonstructural controls, as well as outline
methods used for the long term operation and maintenance of these structural controls.
Any maintenance of structural/non-structural controls, according to the Stormwater
Guidance Manual, will be performed at a frequency determined by the MS4 Operator to
ensure adequate long-term operation and to maintain the effectiveness of appropriate
BMPs for the community. Regular maintenance for all drainage ways and appurtenances
within the MS4 Operator’s jurisdiction will be required and outlined in the MS4
Operator’s Stormwater Guidance Manual. Records of enforcement actions will be
24

Page 27

documented in the meeting minutes and kept in the District file. The clear, specific, and
measurable goals for this activity are outlined in the tables below.
Implementation Schedule
●​ Year 1: The stormwater consultant, or designated representative, will explain the
need to comply with the new conditions of the 2024 TXR040000 to the MS4
Operator consultants and members of the public in attendance at a regularly
scheduled meeting of the Board of Directors.
BMP/Activity
Measurable Goal
Deadline
Attend Board of Directors meeting
Outline TXR040000 new permit terms Dec 31, 2025
●​ Year 2: The stormwater consultant will begin creation of the Stormwater
Guidance Manual chapter relative to post-construction. The stormwater
conveyance map will be reviewed annually and updated based on changes to the
storm sewer system caused by new construction and/or reconstruction. Ensure
compliance with respective drainage criteria standards for any new regulations
that may affect post-construction/new construction.
BMP/Activity
Measurable Goal
Deadline
Begin creation of chapter 4 of GM
Chapter 4 will comply with the new
post-construction provisions of
TXR040000
Dec. 31, 2026
Begin creation of stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2026
Drainage Criteria
Ensure compliance with respective
drainage criteria standards
Dec. 31, 2026
●​ Year 3: The stormwater consultant will complete the Stormwater Guidance
Manual chapter relative to post-construction. Continue creation of stormwater
conveyance map. Ensure compliance with respective drainage criteria standards
for any new regulations that may affect post-construction/new construction.
BMP/Activity
Measurable Goal
Deadline
Complete chapter 4 of GM
Chapter 4 will comply with the new
post-construction provisions of
TXR040000
Dec. 31, 2027
Continue creation of stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2027
Drainage Criteria
Ensure compliance with respective
drainage criteria standards
Dec. 31, 2027
25

Page 28

●​ Year 4: Implement the Stormwater Guidance Manual chapter relative to
post-construction. Complete the stormwater conveyance map. Implement the
Post-Construction Program within the MS4’s jurisdiction. Ensure compliance
with respective drainage criteria standards for any new regulations that may
affect post-construction/new construction.
BMP/Activity
Measurable Goal
Deadline
Review chapter 4 of GM
Chapter 4 will comply with the new
post-construction provisions of
TXR040000
Dec. 31, 2028
Complete stormwater conveyance
map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2028
Implement chapter 4 of GM
District engineer will review all new
post-construction plans and applications
for new construction
30 days from
receipt of
plans
Review and update District’s Rate Order
where applicable
Dec. 31, 2028
Maintain records of 100% of
enforcement actions taken
Dec. 31, 2028
Make 100% of enforcement records
available to TCEQ for review
24 hrs.
Implement maintenance plan and
schedule addressing 100% of
stormwater control measures
Dec. 31, 2028
Require 100% of the owners or
operators of any new development or
redeveloped sites to develop and
implement a maintenance plan
addressing maintenance requirements
for structural control measures
Dec. 31, 2028
Make 100% of maintenance records
available to the TCEQ
24 hrs.
Drainage Criteria
Ensure compliance with respective
drainage criteria standards
Dec. 31, 2028
●​ Year 5: The stormwater consultant will review and update the existing
Stormwater Guidance Manual chapter relative to post-construction. The
stormwater conveyance map will be reviewed annually and updated based on
changes to the storm sewer system caused by new construction and/or
reconstruction. Continue implementation of the Post-Construction Program
within the MS4’s jurisdiction. Ensure compliance with respective drainage
criteria standards for any new regulations that may affect post-construction/new
construction.
26

Page 29

BMP/Activity
Measurable Goal
Deadline
Review chapter 4 of GM
Chapter 4 will comply with the new
post-construction provisions of
TXR040000
Dec. 31, 2029
Review and update stormwater
conveyance map
Produce an annual updated stormwater
conveyance map
Dec. 31, 2029
Implement chapter 4 of GM
District engineer will review all new
post-construction plans and applications
for new construction
30 days from
receipt of
plans
Review and update District’s Rate Order
where applicable
Dec. 31, 2029
Maintain records of 100% of
enforcement actions taken
Dec. 31, 2029
Make 100% of enforcement records
available to TCEQ for review
24 hrs.
Implement maintenance plan and
schedule addressing 100% of
stormwater control measures
Dec. 31, 2029
Require 100% of the owners or
operators of any new development or
redeveloped sites to develop and
implement a maintenance plan
addressing maintenance requirements
for structural control measures
Dec. 31, 2029
Make 100% of maintenance records
available to the TCEQ
24 hrs.
Drainage Criteria
Ensure compliance with respective
drainage criteria standards
Dec. 31, 2029
●​ End of Permit Term Goal: Implementation of chapter 4 of the Stormwater
Guidance Manual and produce an updated stormwater conveyance map annually.
Measurable Evaluation Criteria
●​ Chapter 4 of the GM
●​ Number of applications for new construction/reconstruction reviewed by the
District’s engineer
●​ Stormwater conveyance map
Interim Milestone for MCM 5.0
By the end of year 3, chapter of the Stormwater Guidance Manual will be completed.
27

Page 30

MCM 6.0 Pollution Prevention and Good Housekeeping for Municipal Operations
Summary/Rationale
In addition to the stormwater conveyance system, an MS4 Operator may own facilities including
water plants, lift stations, wastewater treatment plants, parks, and parking lots that could be a
source of pollution to the state’s waterways. The MS4 Operator’s Stormwater Guidance Manual
will address the approach to Pollution Prevention and Good Housekeeping for Municipal
Operations. The Stormwater Guidance Manual will contain methods used to develop and
maintain inventory of facilities and stormwater controls, procedures for contractor requirements
and oversight, and evaluation of municipal operation and maintenance activities. The MS4
Operator’s Operation and Maintenance Program will be implemented to prevent or reduce
pollutant runoff from municipal operations and municipally-owned areas. A training program will
be implemented for all parties responsible for municipal operations subject to the pollution
prevention/good housekeeping program. Procedures for the proper disposal of waste removed
within the MS4 Operator’s jurisdiction and waste that is collected as a result of maintenance of
stormwater structural controls will be implemented as well. A list of maintenance activities,
maintenance schedule, and long-term inspection procedures for controls used to reduce floatables
and other pollutants will also be included in this program element. Housekeeping measures and
BMPs that reduce pollutants will be implemented throughout this permit term. Stormwater
discharges authorized by other TPDES permits are authorized and meet the applicability and
eligibility requirements under TXR040000. The MS4 Operator will document the activities
conducted as part of this MCM. These records, along with any changes made to the BMPs or the
corresponding implementation schedule, will be communicated in the annual report.
6.1 Operations and Maintenance Program
Description
As part of its Stormwater Guidance Manual, the MS4 Operator will develop an Operation
and Maintenance Program with the ultimate goal of preventing or reducing pollutant
runoff from municipal activities and municipally-owned areas. The program also includes
education concerning the proper disposal of waste material. Contractor oversight is
included in this program as well; any contractor hired by the MS4 Operator to perform
work within the MS4 Operator’s jurisdiction is contractually required to comply with all
of the stormwater control measures, good housekeeping practices, and facility-specific
stormwater management operating procedures described in the permit and/or District
Rate Order. The MS4 Operator will evaluate Operation and Maintenance (O&M)
28

Page 31

activities for the potential to discharge pollutants. The clear, specific, and measurable
goals for this activity are outlined in the tables below.
Implementation Schedule
●​ Year 1: The stormwater consultant, or designated representative, will explain the
need to comply with the new conditions of the 2024 TXR040000 to the MS4
Operator consultants and members of the public in attendance at a regularly
scheduled meeting of the Board of Directors.
BMP/Activity
Measurable Goal
Deadline
Attend Board of Directors meeting
Outline TXR040000 new permit terms Dec 31, 2025
●​ Year 2: The stormwater consultant will begin the creation of the Municipal
Operations Program. Begin inventory of all facilities and stormwater controls
owned by the District based on any new construction of District facilities. The
MS4 Operator will hold one training session relative to Pollution Prevention and
Good Housekeeping for Municipal Operations and other SWMP goals. Given
that the MS4 Operator does not have staff/employees, the training sessions will
be performed during regularly scheduled Board meetings for MS4 Operator
consultants and members of the public in attendance at the meeting.
BMP/Activity
Measurable Goal
Deadline/Frequency
Begin creation of chapter 5 of GM
Chapter 5 will comply with the
new Municipal Operations
provisions of TXR040000
Dec. 31, 2026
Begin inventory of District facilities
District operator will maintain &
update an inventory of District
facilities for use in implementing
good housekeeping measures
Dec. 31, 2026
Training & Education on Municipal
Operations & Good Housekeeping
Hold 1 training session per year
Dec 31, 2026
●​ Year 3: Complete creation of the Municipal Operations Program.Complete the
inventory of all facilities and stormwater controls owned by the District based on
any new construction of District facilities. The MS4 Operator will hold one
training session relative to Pollution Prevention and Good Housekeeping for
Municipal Operations and other SWMP goals. Given that the MS4 Operator does
not have staff/employees, the training sessions will be performed during regularly
scheduled Board meetings for MS4 Operator consultants and members of the
public in attendance at the meeting.
29

Page 32

BMP/Activity
Measurable Goal
Deadline/Frequency
Complete chapter 5 of GM
Chapter 5 will comply with the
new Municipal Operations
provisions of TXR040000
Dec. 31, 2027
Complete inventory of District
facilities
District operator will maintain &
update an inventory of District
facilities for use in implementing
good housekeeping measures
Dec. 31, 2027
Training & Education on Municipal
Operations & Good Housekeeping
Hold 1 training session per year
Dec 31, 2027
●​ Years 4-5: The stormwater consultant will annually review and update the
Municipal Operations Program. Implementation of the Operations and
Maintenance Program as outlined in chapter 5 of the GM will begin in year 4.
Annually update inventory of all facilities and stormwater controls owned by the
District based on any new construction of District facilities. The MS4 Operator
will hold one training session relative to Pollution Prevention and Good
Housekeeping for Municipal Operations and other SWMP goals. Given that the
MS4 Operator does not have staff/employees, the training sessions will be
performed during regularly scheduled Board meetings for MS4 Operator
consultants and members of the public in attendance at the meeting.
BMP/Activity
Measurable Goal
Deadline/Frequency
Review chapter 5 of GM
Chapter 5 will comply with the
new Municipal Operations
provisions of TXR040000
Annually by 12/31
Implement chapter 5 of GM
Board of Directors will review
operations reports
Monthly
Develop and maintain an annual
inventory for 100% of the small
MS4 owned and operated
facilities and controls
Annually by 12/31
Review & update the inventory of
District facilities for use in
implementing good housekeeping
measures
Annually by 12/31
Hold 1 training session per year
Annually by 12/31
30

Page 33

Ensure that 100% of waste from
the MS4 is disposed of in
accordance with 30 TAC Chapters
330 or 335
Annually by 12/31
Ensure that 100% of contractors
hired by the MS4 to perform
maintenance activities on
permittee-owned facilities is
contractually required to comply
with all of the stormwater control
measures, good housekeeping
practices, and facility-specific
stormwater management
operating procedures
Annually by 12/31
Implement oversight procedures
of contractor activities in 100% of
contracts to ensure that
contractors are using appropriate
control measures and SOPs
Annually by 12/31
Maintain oversight procedures
on-site 100% of the time and
make available for review by
TCEQ
24 hrs.
Evaluate 100% of O&M
activities, in conjunction with
procedure reviews if appropriate
Annually by 12/31
Identify pollutants of concern that
could be discharged from all of
the O&M activities and maintain
a list of 100% of the pollutants
identified
Annually by 12/31
Review and update the pollutants
of concern list
Annually by 12/31
Develop and implement a set of
pollution prevention​
measures that will reduce the
discharge of pollutants in​
stormwater from the
permittee-owned operations.
Annually by 12/31
31

Page 34

Visually inspect 100% of
pollution prevention measures
implemented at permittee-owned
facilities
Annually by 12/31
Develop and maintain written
procedures that describe the
frequency of inspections and how
they will be conducted
Annually by 12/31
Review and update the inspection
procedures to address changes or
additions to the pollution
prevention measures.
Annually by 12/31
Maintain a log of 100% of the
inspections conducted annually
and make the log available for
review by the TCEQ
24 hrs.
Perform maintenance of 100% of
the structural controls which
require maintenance.
Annually by 12/31
Develop and maintain written
procedures that define the
frequency of inspections and how
they will be conducted
Annually by 12/31
Review and update the
maintenance to address changes
or additions to the pollution
prevention measures.
Annually by 12/31
●​ End of Permit Term Goal: Implementation of Operation and Maintenance
Program for municipally owned facilities, as outlined in chapter 5 of the
Stormwater Guidance Manual.
Measurable Evaluation Criteria
●​ Monthly meeting agenda item for public involvement, necessary training,
and education
●​ Monthly meeting minutes
●​ Chapter 5 of the GM
●​ Facilities inventoried
32

Page 35

Interim Milestone for MCM 6.0
By the end of year 3, inventory of facilities and stormwater controls will be recorded.
MCM 7.0 Industrial Stormwater Sources
Summary/Rationale
As a level 2b small MS4 Operator, there are no industrial stormwater requirements under the
current permit.
MCM 8.0 Authorization for Construction Activities where the MS4 Operator is the Site ​
Operator
Summary/Rationale
The MS4 Operator has chosen not to develop this optional measure at this time.
33

Page 36

Part III – Appendices
34

Page 37

Appendix A
“References”

Page 38

References
TCEQ 2024. Texas General Permit Number TXR040000, Relating to Discharges from Small Municipal
Separate Storm Sewer Systems,
<https://www.tceq.texas.gov/downloads/permitting/stormwater/general/ms4/2024-txr040000-gen
eral-permit-signed.pdf>
TCEQ 2024 Texas Integrated Report Index of Water Quality Impairments,​
<https://www.tceq.texas.gov/downloads/water-quality/assessment/integrated-report-2024/2024-im
p-index>
Brushy Creek: Developing a Watershed Characterization
<https://www.tceq.texas.gov/waterquality/nonpoint-source/projects/brushy-creek-wpp-dev>
ESRI. ArcGIS Online,
<https://www.arcgis.com/home/item.html?id=10df2279f9684e4a9f6a7f08febac2a9>

Page 39

Appendix B
“Location Map –  
Aerial”

Page 40

Appendix C
“TXR040000”

Page 41

GENERAL PERMIT TO DISCHARGE UNDER THE
TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM
under provisions of
402 of the Clean Water Act
and Chapter 26 of the Texas Water Code
This permit supersedes and replaces
TPDES General Permit No. TXRo40000, issued January 24, 2019
Small (Phase IT) Municipal Separate Storm Sewer Systems located in the State of Texas may
discharge directly to surface water in the state only according to requirements and conditions
set forth in this Comprehensive General Permit, as well as the rules of the Texas Commission on
Environmental Quality (TCEQ or Commission), the laws of the State of Texas, and other orders
of the TCEQ. The issuance of this general permit does not grant to the permittee the right to use
private or public property for conveyance of stormwater and certain non-stormwater discharges
along the discharge route. This includes property belonging to but not limited to any individual,
partnership, corporation, or other entity. Neither does this general permit authorize any
invasion of personal rights nor any violation of federal, state, or local laws or regulations. It is
the responsibility of the permittee to acquire property rights as may be necessary to use the
discharge route.
This general permit and the authorization contained herein shall expire at midnight, five years
after the permit effective date.
EFFECTIVE DATE: Avg vit '%, 2° * 7
ISSUED DATE:
Avg vst 1S
:
[ ~
For the Commision

Page 42

2024 Small MS4 General Permit
Page 2
TCEQ GENERAL PERMIT NUMBER TXR040000
RELATING TO DISCHARGES FROM
SMALL MUNICIPAL SEPARATE STORM SEWER SYSTEMS
Table of Contents
Part I.
Definitions  … 6
Part II. Permit Applicability and Coverage  … 12
Section A.
Small MS4s Eligible for Authorization under this General Permit  … 12
1.
Small MS4s Located in an Urban Area with a Population of
at Least 50,000 People  … 12
2.
Designated Small MS4s  … 12
3.
Regulated Portion of Small MS4  … 12
Section B.
Categories of Regulated Small MS4s  … 13
Section C.
Available Waivers from Coverage  … 13
1.
Waiver Option 1:  … 14
2.
Waiver Option 2:  … 15
Section D. Allowable Non-Stormwater Discharge  … 15
Section E.
Limitations on Permit Coverage  … 16
1.
Discharges Authorized by Another TPDES Permit  … 16
2.
Discharges of Stormwater Mixed with Non-Stormwater  … 16
3.
Compliance with Texas Surface Water Quality Standards  … 17
4.
Discharges to the Edwards Aquifer Recharge Zone  … 17
5.
Discharges to Specific Watersheds and Water Quality Areas  … 18
6.
Protection of Streams and Watersheds by Home Rule Municipalities  … 18
7.
Indian Country Lands  … 18
8.
Endangered Species Act  … 18
Section F.
Obtaining Authorization  … 18
1.
Application for Coverage  … 18
2.
Application Deadlines  … 19
3.
Late Submission of the NOI  … 19
4.
Contents of the NOI  … 20
5.
SWMP General Requirements  … 21
6.
Changes to the NOI Submitted and SWMP  … 21
7.
Notice of Change (NOC)  … 22

Page 43

2024 Small MS4 General Permit
Page 3
8.
Change in Operational Control of a Small MS4  … 22
9.
Notice of Termination (NOT)  … 22
10. Signatory Requirement for NOI, NOT, NOC, and Waiver Forms  … 23
11. Electronic Reporting Waiver  … 23
12. Fees  … 23
13. Permit Expiration  … 23
14. Suspension of Permit Coverage  … 24
Section G. Permitting Options  … 24
1.
Authorization Under the General Permit  … 24
2.
Alternative Coverage Under an Individual TPDES Permit  … 25
Part III. Impaired Water Bodies and Total Maximum Daily Load (TMDL) Requirements ... 25
Section A.
Discharges to Water Quality Impaired Water Bodies with
an Approved TMDL  … 25
1.
Targeted Controls  … 26
2.
Measurable Goals  … 26
3.
Identification of Benchmarks  … 26
4.
Annual Report  … 27
5.
Impairment for Bacteria  … 27
6.
Monitoring or Assessment of Progress  … 29
7.
Observing No Progress Towards the Benchmark  … 30
Section B.
Discharges Directly to Water Quality Impaired Water Bodies Without an
Approved TMDL  … 30
1.
Discharging a Pollutant of Concern  … 31
2.
Impairment for Bacteria  … 31
3.
Annual Report  … 31
Part IV. Stormwater Management Program (SWMP)  … 31
Section A.
SWMP Review  … 31
Section B.
SWMP Updates Required by TCEQ  … 31
Section C.
Developing a Stormwater Management Program (SWMP)  … 32
1.
SWMP Development and Schedule  … 32
2.
Contents of the SWMP  … 32
3.
Legal Authority  … 33
4.
Resources  … 34
5.
Effluent Limitations  … 34

Page 44

2024 Small MS4 General Permit
Page 4
6.
Enforcement Measures  … 34
7.
General Requirements  … 34
Section D. Minimum Control Measures (MCMs)  … 35
1.
Public Education and Outreach  … 35
2.
Public Involvement/Participation  … 40
3.
Illicit Discharge Detection and Elimination (IDDE)  … 42
4.
Construction Site Stormwater Runoff Control  … 49
5.
Post Construction Stormwater Management in New Development and
Redevelopment  … 53
6.
Pollution Prevention and Good Housekeeping for Municipal Operations  … 55
7.
Industrial Stormwater Sources  … 69
8.
Authorization for Construction Activities where the Small MS4 is
the Site Operator  … 70
Part V. Recordkeeping and Reporting  … 71
Section A.
Recordkeeping  … 71
Section B.
Reporting  … 71
1.
General Reporting Requirements  … 71
2.
Annual Report  … 72
Part VI. Standard Permit Conditions  … 73
Part VII. Authorization for Municipal Construction Activities – Applicable only if the Optional
8th MCM is Selected  … 75
Section A.
Eligible Construction Sites  … 75
Section B.
Discharges Eligible for Authorization  … 75
1.
Stormwater Associated with Construction Activity  … 75
2.
Discharges of Stormwater Associated with Construction Support Activities  … 75
3.
Non-Stormwater Discharges  … 76
4.
Other Permitted Discharges  … 76
Section C.
Limitations on Permit Coverage  … 76
Section D. Stormwater Pollution Prevention Plan (SWP3) Requirements  … 76
Section E.
Contents of SWP3  … 77
1.
Site Description  … 77
2.
Structural and non-structural controls  … 78
3.
Stabilization Practices  … 78
4.
Structural Control Practices  … 79

Page 45

2024 Small MS4 General Permit
Page 5
5.
Permanent Stormwater Controls  … 80
6.
Other Controls  … 80
7.
Effluent Limitations  … 80
8.
Approved State and Local Plans  … 80
9.
Maintenance  … 80
10. Inspections of Controls  … 81
11. Observation and Evaluation of Dewatering Controls  … 83
12. Pollution Prevention Measures … 83
Section F.
Stormwater Runoff from Concrete Batch Plant  … 84
1.
Benchmark Sampling Requirements  … 84
2.
BMPs and SWP3 Requirements for Concrete Batch Plants  … 85
3.
Concrete Truck Wash Out Requirements  … 88
Section G. Effective Date of Coverage  … 89
Section H. Deadlines for SWP3 Preparation and Compliance  … 89
Section I.
Plan Review and Making Plans Available  … 89
Section J.
Keeping Plans Current  … 89
Section K. Delegation of Signatory Authority  … 89
Section L.
Additional Retention of Records  … 89

Page 46

2024 Small MS4 General Permit
Part I
Page 6
Part I.
Definitions
Arid Areas – Areas with an average annual rainfall of less than ten inches.
Benchmarks – A benchmark pollutant value is a guidance level indicator that helps determine
the effectiveness of chosen best management practices (BMPs). This type of monitoring differs
from “compliance monitoring” in that exceedances of the indicator or benchmark level are not
permit violations, but rather indicators that can help identify problems at the Municipal
Separate Storm Sewer System (MS4) with exposed or unidentified pollutant sources; or control
measures that are either not working correctly, whose effectiveness need to be re-considered, or
that need to be supplemented with additional BMP(s).
Best Management Practices (BMPs) – Schedules of activities, prohibitions of practices,
maintenance procedures, structural controls, local ordinances, and other management practices
to prevent or reduce the discharge of pollutants. BMPs also include treatment requirements,
operating procedures, and practices to control runoff, spills or leaks, waste disposal, or drainage
from raw material storage areas.
Catch Basins – Storm drain inlets and curb inlets to the storm drain system. Catch basins
typically include a grate or curb inlet that may accumulate sediment, debris, and other
pollutants.
Classified Segment – A water body that is listed and described in Appendix A or Appendix C
of the Texas Surface Water Quality Standards, at 30 Texas Administrative Code (TAC) § 307.10.
Clean Water Act (CWA) – The Federal Water Pollution Control Act or Federal Water
Pollution Control Act Amendments of 1972, Pub. L. 92-500, as amended Pub. L. 95-217, Pub. L.
95-576, Pub. L. 96-483, and Pub. L. 97-117, 33 U.S.C. 1251 et. seq.
Common Plan of Development or Sale – A construction activity that is completed in
separate stages, separate phases, or in combination with other construction activities. A
common plan of development or sale is identified by the documentation for the construction
project that identifies the scope of the project, and may include plats, blueprints, marketing
plans, contracts, building permits, a public notice or hearing, zoning requests, or other similar
documentation and activities.
Construction Activity – Soil disturbance, including clearing, grading, excavating, and other
construction related activities (e.g., stockpiling of fill material and demolition); and not
including routine maintenance that is performed to maintain the original line and grade,
hydraulic capacity, or original purpose of the site (e.g., the routine grading of existing dirt roads,
asphalt overlays of existing roads, the routine clearing of existing right-of-ways, and similar
maintenance activities). Regulated construction activity is defined in terms of small and large
construction activity.
Small Construction Activity is construction activity that results in land disturbance of
equal to or greater than one acre and less than five acres of land. Small construction activity
also includes the disturbance of less than one acre of total land area that is part of a larger
common plan of development or sale if the larger common plan will ultimately disturb equal
to or greater than one and less than five acres of land.
Large Construction Activity is construction activity that results in land disturbance of
equal to or greater than five acres of land. Large construction activity also includes the
disturbance of less than five acres of total land area that is part of a larger common plan of
development or sale if the larger common plan will ultimately disturb equal to or greater
than five acres of land.

Page 47

2024 Small MS4 General Permit
Part I
Page 7
Construction Site Operator – The entity or entities associated with a small or large
construction project that meet(s) either of the following two criteria:
(a) The entity or entities that have operational control over construction plans and
specifications (including approval of revisions) to the extent necessary to meet the
requirements and conditions of this general permit; or
(b) The entity or entities that have day-to-day operational control of those activities at a
construction site that are necessary to ensure compliance with a stormwater pollution
prevention plan (SWP3) for the site or other permit conditions (for example they are
authorized to direct workers at a site to carry out activities required by the SWP3 or
comply with other permit conditions).
Control Measure – Any BMP or other method used to prevent or reduce the discharge of
pollutants to water in the state.
Conveyance – Curbs, gutters, man-made channels and ditches, drains, pipes, and other
constructed features designed or used for flood control or to otherwise transport stormwater
runoff.
Discharge – When used without a qualifier, refers to the discharge of stormwater runoff or
certain non-stormwater discharges as allowed under the authorization of this general permit.
Edwards Aquifer – As defined in 30 TAC § 213.3 (relating to the Edwards Aquifer), that
portion of an arcuate belt of porous, water-bearing, predominantly carbonate rocks known as
the Edwards and Associated Limestones in the Balcones Fault Zone trending from west to east
to northeast in Kinney, Uvalde, Medina, Bexar, Comal, Hays, Travis, and Williamson Counties;
and composed of the Salmon Peak Limestone, McKnight Formation, West Nueces Formation,
Devil’s River Limestone, Person Formation, Kainer Formation, Edwards Formation, and
Georgetown Formation. The permeable aquifer units generally overlie the less-permeable Glen
Rose Formation to the south, overlie the less-permeable Comanche Peak and Walnut
Formations north of the Colorado River, and underlie the less-permeable Del Rio Clay
regionally.
Edwards Aquifer Recharge Zone – Generally, that area where the stratigraphic units
constituting the Edwards Aquifer crop out, including the outcrops of other geologic formations
in proximity to the Edwards Aquifer, where caves, sinkholes, faults, fractures, or other
permeable features would create a potential for recharge of surface waters into the Edwards
Aquifer. The recharge zone is identified as that area designated as such on official maps located
on the TCEQ website or in the offices of the TCEQ.
Final Stabilization – A construction site where any of the following conditions are met:
(a) All soil disturbing activities at the site have been completed and a uniform (for
example, evenly distributed, without large bare areas) perennial vegetative cover with a
density of 70 percent (%) of the native background vegetative cover for the area has
been established on all unpaved areas and areas not covered by permanent structures,
or equivalent permanent stabilization measures (such as the use of riprap, gabions, or
geotextiles) have been employed.
(b) For individual lots in a residential construction site by either:
(1) The homebuilder completing final stabilization as specified in condition (a) above;
or
(2) The homebuilder establishing temporary stabilization for an individual lot prior to
the time of transfer of the ownership of the home to the buyer and after informing
the homeowner of the need for, and benefits of, final stabilization.

Page 48

2024 Small MS4 General Permit
Part I
Page 8
(c) For construction activities on land used for agricultural purposes (for example
pipelines across crop or range land), final stabilization may be accomplished by
returning the disturbed land to its preconstruction agricultural use. Areas disturbed
that were not previously used for agricultural activities, such as buffer strips
immediately adjacent to a surface water and areas which are not being returned to their
preconstruction agricultural use must meet the final stabilization conditions of
condition (a) above.
(d) In arid, semi-arid, and drought-stricken areas only, all soil disturbing activities at the
site have been completed and both of the following criteria have been met:
(1) Temporary erosion control measures (e.g., degradable rolled erosion control
product) are selected, designed, and installed along with an appropriate seed base
to provide erosion control for at least three years without active maintenance by
the operator, and
(2) The temporary erosion control measures are selected, designed, and installed to
achieve 70 percent (%) vegetative coverage within three years.
General Permit – A permit issued to authorize the discharge of waste into or adjacent to water
in the state for one or more categories of waste discharge within a geographical area of the state
or the entire state as provided by Texas Water Code (TWC) § 26.040.
Groundwater Infiltration – For the purposes of this permit, groundwater that enters a
municipal separate storm sewer system (including sewer service connections and foundation
drains) through such means as defective pipes, pipe joints, connections, or manholes.
High Priority Facilities – High priority facilities are facilities with a high potential to
generate stormwater pollutants. These facilities must include, at a minimum, the MS4 operator’s
maintenance yards, hazardous waste facilities, fuel storage locations, and other facilities where
chemicals or other materials have a high potential to be discharged in stormwater. Among the
factors that must be considered when giving a facility a high priority ranking are: the amount of
urban pollutants stored at the site, the identification of improperly stored materials, activities
that must not be performed outside (for example, changing automotive fluids, vehicle washing),
proximity to water bodies, proximity to sensitive aquifer recharge features, poor housekeeping
practices, and discharge of pollutant(s) of concern to impaired water(s).
Hyperchlorinated Water – Water resulting from hyperchlorination of waterlines or vessels,
with a chlorine concentration greater than 10 milligrams per liter (mg/L).
Illicit Connection – Any man-made conveyance connecting an illicit discharge directly to a
municipal separate storm sewer.
Illicit Discharge – Any discharge to an MS4 that is not entirely composed of stormwater,
except discharges pursuant to this general permit or a separate authorization and discharges
resulting from emergency fire-fighting activities.
Impaired Water – A surface water body that is identified as impaired on the latest U.S.
Environmental Protection Agency (EPA) approved Clean Water Act (CWA) § 303(d) List or
waters with an EPA approved or established TMDL that are found on the latest EPA approved
Texas Integrated Report of Surface Water Quality for CWA Sections 305(b) and 303(d) which
lists the category 4 and 5 water bodies.
Implementation Plan (I-Plan) – A detailed plan of action that describes the measures or
activities necessary to achieve the pollutant reductions identified in the total maximum daily
load (TMDL).

Page 49

2024 Small MS4 General Permit
Part I
Page 9
Indian Country – Defined in 18 U.S.C. § 1151 as:
(a) All land within the limits of any Indian reservation under the jurisdiction of the United
States (U.S.) Government, notwithstanding the issuance of any patent, and including
rights-of-way running through the reservation;
(b) All dependent Indian communities within the borders of the U.S. whether within the
original or subsequently acquired territory thereof, and whether within or without the
limits of a state; and
(c) All Indian allotments, the Indian titles to which have not been extinguished, including
rights-of-way running through the same. This definition includes all land held in trust for
an Indian tribe.
Indicator Pollutant – An easily measured pollutant, that may or may not impact water
quality that indicates the presence of other stormwater pollutants.
Industrial Activity – Any of the ten categories of industrial activities included in the
definition of “stormwater discharges associated with industrial activity” as defined in 40 Code of
Federal Regulations (CFR) § 122.26(b)(14)(i)-(ix) and (xi).
Infeasible – For the purpose of this permit, infeasible means not technologically possible, or
not economically practicable and achievable in light of best industry practices. The TCEQ notes
that it does not intend for any small MS4 general permit requirement to conflict with state water
right laws.
Maximum Extent Practicable (MEP) – The technology-based discharge standard for MS4s
to reduce pollutants in stormwater discharges that was established by the CWA § 402(p). A
discussion of MEP as it applies to small MS4s is found in 40 CFR § 122.34.
MS4 Operator – For the purpose of this permit, the public entity or the entity contracted by
the public entity, responsible for management and operation of the small municipal separate
storm sewer system that is subject to the terms of this general permit.
Municipal Separate Storm Sewer System (MS4) – A conveyance or system of
conveyances (including roads with drainage systems, municipal streets, catch basins, curbs,
gutters, ditches, man-made channels, or storm drains):
(a) Owned or operated by the U.S., a state, city, town, borough, county, parish, district,
association, or other public body (created by or pursuant to state law) having jurisdiction
over the disposal of sewage, industrial wastes, stormwater, or other wastes, including
special districts under state law such as a sewer district, flood control district or drainage
district, or similar entity, or an Indian tribe or an authorized Indian tribal organization,
or a designated and approved management agency under the CWA § 208 that discharges
to surface water in the state;
(b) That is designed or used for collecting or conveying stormwater;
(c) That is not a combined sewer; and
(d) That is not part of a publicly owned treatment works (POTW) as defined in 40 CFR §
122.2.
Non-traditional Small MS4 – A small MS4 that often cannot pass ordinances and may not
have the enforcement authority like a traditional small MS4 would have to enforce the
stormwater management program. Examples of non-traditional small MS4s include counties,
transportation authorities (including the Texas Department of Transportation), municipal utility
districts, drainage districts, military bases, prisons, and universities.

Page 50

2024 Small MS4 General Permit
Part I
Page 10
Notice of Change (NOC) – A written notification from the permittee to the executive director
providing changes to information that was previously provided to the agency in a Notice of
Intent.
Notice of Intent (NOI) – A written submission to the executive director from an applicant
requesting coverage under this general permit.
Notice of Termination (NOT) – A written submission to the executive director from a
permittee authorized under a general permit requesting termination of coverage under this
general permit.
Outfall – A point source at the point where a small MS4 discharges to Waters of the U.S. and
does not include open conveyances connecting two municipal separate storm sewers, or pipes,
tunnels, or other conveyances that connect segments of the same stream or other Waters of the
U.S. and are used to convey Waters of the U.S. For the purpose of this permit, sheet flow leaving
a linear transportation system without channelization is not considered an outfall. Point sources
such as curb cuts; traffic or right-of-way barriers with drainage slots that drain into open
culverts, open swales, or an adjacent property, or otherwise not actually discharging into Waters
of the U.S. are not considered an outfall.
Permittee – The MS4 operator authorized under this general permit.
Point Source – (from 40 CFR § 122.22) any discernible, confined, and discrete conveyance,
including but not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure,
container, rolling stock, concentrated animal feeding operation, landfill leachate collection
system, vessel or other floating craft from which pollutants are or may be discharged. This term
does not include return flows from irrigated agriculture or agricultural stormwater runoff.
Pollutant(s) of Concern (POCs) – For the purpose of this permit, includes biochemical
oxygen demand (BOD), sediment or a parameter that addresses sediment (such as total
suspended solids (TSS), turbidity or siltation), pathogens, oil and grease, and any pollutant that
has been identified as a cause of impairment of any water body that will receive a discharge from
an MS4. (Definition from 40 CFR § 122.32(e)(3)).
Redevelopment – Alterations of a property that changed the “footprint” of a site or building in
such a way that there is a disturbance of equal to or greater than one acre of land. This term does
not include such activities as exterior remodeling, routine maintenance activities, and linear
utility installation.
Semiarid Areas – Areas with an average annual rainfall of at least ten inches, but less than 20
inches.
Small Municipal Separate Storm Sewer System (MS4) – A conveyance or system of
conveyances (including roads with drainage systems, municipal streets, catch basins, curbs,
gutters, ditches, manmade channels, or storm drains):
(a) Owned or operated by the U.S., a state, city, town, borough, county, district,
association, or other public body (created by or pursuant to State law) having
jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes,
including special districts under state law such as a sewer district, flood control district
or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal
organization, or a designated and approved management agency under CWA § 208;
(b) Designed or used for collecting or conveying stormwater;
(c) Which is not a combined sewer;
(d) Which is not part of a POTW as defined in 40 CFR § 122.2; and

Page 51

2024 Small MS4 General Permit
Part I
Page 11
(e) Which was not previously regulated under a National Pollutant Discharge Elimination
System (NPDES) or a Texas Pollutant Discharge Elimination System (TPDES)
individual permit as a medium or large municipal separate storm sewer system, as
defined in 40 CFR §§ 122.26(b)(4) and (b)(7).
This term includes systems similar to separate storm sewer systems at military bases, large
hospitals or prison complexes, and highways and other thoroughfares. This term does not
include separate storm sewers in very discrete areas, such as individual buildings. For the
purpose of this permit, a very discrete system also includes storm drains associated with certain
municipal offices and education facilities serving a nonresidential population, where those
storm drains do not function as a system, and where the buildings are not physically
interconnected to a small MS4 that is also operated by that public entity.
Stormwater and Stormwater Runoff – Rainfall runoff, snow melt runoff, and surface
runoff and drainage.
Stormwater Associated with Construction Activity – Stormwater runoff from an area
where there is either a large construction or a small construction activity.
Stormwater Management Program (SWMP) – A comprehensive program to manage the
quality of discharges from the MS4.
Structural Control (or Practice) – A pollution prevention practice that requires the
construction of a device, or the use of a device, to capture or prevent pollution in stormwater
runoff. Structural controls and practices may include but are not limited to wet ponds,
bioretention, infiltration basins, stormwater wetlands, silt fences, earthen dikes, drainage
swales, vegetative lined ditches, vegetative filter strips, sediment traps, check dams, subsurface
drains, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems,
gabions, and temporary or permanent sediment basins.
Surface Water in the State – Lakes, bays, ponds, impounding reservoirs, springs, rivers,
streams, creeks, estuaries, wetlands, marshes, inlets, canals, the Gulf of Mexico inside the
territorial limits of the state (from the mean high water mark (MHWM) out 10.36 miles into the
Gulf), and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt,
navigable or nonnavigable, and including the beds and banks of all water courses and bodies of
surface water, that are wholly or partially inside or bordering the state or subject to the
jurisdiction of the state. Waters in treatment systems which are authorized by state or federal
law, regulation, or permit, and which are created for the purpose of waste treatment are not
considered to be water in the state.
Total Maximum Daily Load (TMDL) – The total amount of a substance that a water body
can assimilate and still meet the Texas Surface Water Quality Standards.
Traditional Small MS4 – A small MS4 that can pass ordinances and have the enforcement
authority to enforce the stormwater management program. An example of traditional MS4s
includes cities.
Urban Area – A statistical geographic entity consisting of a densely settled core created from
census blocks and contiguous qualifying territory that together have at least 2,000 housing units
or 5,000 persons as defined and used by the U.S. Census Bureau in the 2020 Decennial Census.
Urbanized Area (UA) – A retired statistical geographic entity type consisting of a densely
settled core created from census tracts or blocks and adjacent densely settled territory that
together have a minimum population of 50,000 people which was used by the U.S. Census
Bureau in the 2000 and the 2010 Decennial Census.

Page 52

2024 Small MS4 General Permit
Part II, Section A
Page 12
Waters of the United States – Waters of the United States or Waters of the U.S. means the
term as defined in 40 CFR § 122.2.
Part II.
Permit Applicability and Coverage
This Comprehensive General Permit provides authorization for stormwater and certain non-
stormwater discharges from small (Phase II) municipal separate storm sewer systems (MS4) to
surface water in the state. The general permit contains the required permit terms and conditions
along with clear, specific, and measurable requirements applicable to all small MS4s that are
eligible for coverage under this general permit (see 40 CFR § 122.28(d)(1)).
Section A. Small MS4s Eligible for Authorization under this General Permit
Discharges from a small MS4 must be authorized if any of the following criteria are met and may
be authorized under this general permit if coverage is not otherwise prohibited.
1. Small MS4s Located in an Urban Area with a Population of at Least 50,000
People
Operators of small MS4s that are fully or partially located within an urban area with a
population of at least 50,000 people, as determined by the 2000,2010, or 2020 Decennial
Censuses by the U.S. Census Bureau, must obtain authorization for the discharge of
stormwater runoff and are eligible for coverage under this general permit unless otherwise
prohibited.
NOTE: Urban areas with a population of at least 50,000 people were referred to as
Urbanized Areas in the 2000 and 2010 Decennial Censuses by the U.S. Census Bureau. The
term Urbanized Area was retired in the 2020 Decennial Census by the U.S. Census Bureau.
2. Designated Small MS4s
A small MS4 that is outside an urban area with a population of at least 50,000 people that is
designated by TCEQ based on evaluation criteria as required by 40 CFR §§ 122.32(a)(2) or
122.26(a)(1)(v) and adopted by reference in 30 TAC § 281.25, is eligible for coverage under
this general permit. The criteria that the executive director may consider is as follows:
•
The location of the discharge with respect to Waters of the U.S. as defined at 40 CFR
§ 122.2;
•
The size of the discharge;
•
The quantity and nature of the pollutants discharged to Waters of the U.S.; and
•
Other relevant factors.
Following designation, operators of small MS4s must obtain authorization under this
general permit or apply for coverage under a TPDES individual stormwater permit within
180 days of notification of their designation.
3. Regulated Portion of Small MS4
The portion of the small MS4 that is required to meet the conditions of this general permit
are those portions that are located within the urban area with a population of at least 50,000
people as defined and used by the U.S. Census Bureau in the 2000, 2010, or 2020 Decennial
Censuses, as well as any portion of the small MS4 that is designated by TCEQ.

Page 53

2024 Small MS4 General Permit
Part II, Section B & C
Page 13
For the purpose of this permit, the regulated portion of a small MS4 for a transportation
entity is the land owned by the permittee within the urban area with a population of at least
50,000 people which functions as or is integral to a transportation system with drainage
conveyance. Non-contiguous property that does not drain into the transportation drainage
system is not subject to this general permit.
Section B. Categories of Regulated Small MS4s
This general permit defines small MS4 operators by the following categories, or levels, based on
the population served by the MS4 within the 2020 urban area with a population of at least
50,000 people. The level of an MS4 is based on population in the most recent Decennial Census
at the time of permit issuance. A national Census held during a permit term will not affect the
level of an MS4 until the next permit renewal.
For the purpose of this section, “serve a population” means the residential population within the
regulated portion of the small MS4 based on the population data from the 2020 Decennial
Census, except for non-traditional small MS4s listed in Level 2b below.
The level of a small MS4 may change during the permit term based on the MS4 operator
acquiring or giving up regulated area(s), such as by annexing land or if land is annexed away.
However, the level of a small MS4 will not change during the permit term based on other
population fluctuations.
•
Level 1: Operators of traditional small MS4s that serve a population of less than 10,000
within an “urban area with a population of at least 50,000 people”.
•
Level 2a: Operators of traditional small MS4s that serve a population of at least 10,000
but less than 40,000 within an “urban area with a population of at least 50,000
people”.
•
Level 2b: Operators of all non-traditional small MS4s such as counties, drainage
districts, transportation entities, military bases, universities, colleges, correctional
institutions, municipal utility districts and other special districts regardless of
population served within the “urban area with a population of at least 50,000 people”,
unless the non-traditional MS4 can demonstrate that it meets the criteria for a waiver
from permit coverage based on the population served.
•
Level 3: Operators of traditional small MS4s that serve a population of at least 40,000
but less than 100,000 within an “urban area with a population of at least 50,000
people”.
•
Level 4: Operators of traditional small MS4s that serve a population of 100,000 or
more within an “urban area with a population of at least 50,000 people”.
Section C. Available Waivers from Coverage
The TCEQ may waive permitting requirements for regulated small MS4 operators if the criteria
are met for Waiver Option 1 or Option 2 below. To obtain Waiver Option 1 or Option 2, the MS4
operator must submit the request on the appropriate waiver form submitted electronically via
the NPDES Electronic Reporting Tool for MS4s (NeT-MS4) online electronic permitting (e-
permitting) system, unless the MS4 operator requested and obtained an Electronic Reporting
Waiver as described in Part II.F.11. MS4 operators that are granted an Electronic

Page 54

2024 Small MS4 General Permit
Part II, Section C
Page 14
Reporting Waiver shall submit the request for a waiver from permit coverage on a paper Waiver
Option 1 or Option 2 form, as applicable, provided by the executive director.
NOTE: To obtain Waiver Option 2, the MS4 operator must contact the executive director and
coordinate the activities required to meet the waiver conditions prior to preparing and
submitting the Waiver Option 2 form.
Provisional coverage begins upon electronic submittal of the appropriate waiver form that is
administratively complete via the NeT-MS4 online e-permitting system available through the
TCEQ website. Alternatively, for paper applications with an approved Electronic Reporting
Waiver provisional coverage begins 30 days after an administratively complete paper waiver
form is postmarked for delivery to TCEQ.
Following review of the small MS4’s waiver form, the executive director may:
(1) determine that the waiver form is technically complete and approve the waiver by
providing a notification and a waiver number;
(2) determine that the waiver form is incomplete and deny the waiver until a technically
completed waiver form is submitted; or
(3) deny the waiver and require that permit coverage be obtained by submitting an
application.
If the conditions of an approved waiver are not met by the MS4 operator, then the MS4 operator
must submit an application for coverage under this general permit or a separate TPDES
individual permit application.
At any time, TCEQ may require a previously waived MS4 operator to comply with this general
permit or another TPDES permit if circumstances change so that the conditions of the waiver
are no longer met. Changed circumstances can also allow a regulated MS4 operator to request a
waiver at any time.
The TCEQ can request to review any waivers granted to MS4 operators to determine whether
any of the information required for granting the waiver has changed, at any time. At a minimum
TCEQ will review all waivers when MS4 operators submit their renewal waiver applications.
For the purpose of obtaining an Option 1 or Option 2 Waiver, the population served refers to:
•
the residential population within the regulated portion of the small MS4 for
o traditional small MS4s, and
o certain non-traditional small MS4s with a residential population (such as
counties and municipal utility districts), or
•
the number of people using the small MS4 on an average operational day for certain
non-traditional small MS4s without a residential population.
1. Waiver Option 1:
The small MS4 serves a population of less than 1,000 within an urban area with a population
of at least 50,000 people and meets the following criteria:
(a)
The small MS4 is not contributing substantially to the pollutant loadings of a physically
interconnected MS4 that is regulated by the NPDES / TPDES stormwater program (40
CFR § 122.32(d)); and
(b)
If the small MS4 discharges any pollutant(s) that have been identified as a cause of
impairment of any water body to which the small MS4 discharges, stormwater controls

Page 55

2024 Small MS4 General Permit
Part II, Section D
Page 15
are not needed based on waste load allocations that are part of an EPA approved or
established Total Maximum Daily Load (TMDL) that addresses the pollutant(s) of
concern (POCs).
2. Waiver Option 2:
The small MS4 serves a population under 10,000 within an urban area with a population of
at least 50,000 people and meets the following criteria:
(a)
The TCEQ has evaluated all Waters of the U.S., including small streams, tributaries,
lakes, and ponds, that receive a discharge from the small MS4;
(b)
For all such waters, the TCEQ has determined that stormwater controls are not needed
based on waste load allocations that are part of an approved or established TMDL that
addresses the POCs or, if a TMDL has not been developed or approved, an equivalent
analysis that determines sources and allocations for the POCs;
(c)
The TCEQ has determined that future discharges from the small MS4 do not have the
potential to exceed Texas Surface Water Quality Standards, including impairment of
designated uses, or other significant water quality impacts, including habitat and
biological impacts; and
(d)
For the purpose of Waiver Option 2, the POCs include biochemical oxygen demand
(BOD), sediment or a parameter that addresses sediment (such as total suspended
solids (TSS), turbidity or siltation), pathogens, oil and grease, and any pollutant that
has been identified as a cause of impairment of any water body that will receive a
discharge from the small MS4.
Section D. Allowable Non-Stormwater Discharge
The following non-stormwater sources may be discharged from the small MS4 and are not
required to be addressed in the small MS4's Illicit Discharge and Detection or other minimum
control measures, unless they are determined by the permittee or TCEQ to be significant
contributors of pollutants to the small MS4, or they are otherwise prohibited by the MS4
operator:
1. Water line flushing (excluding discharges of hyperchlorinated water, unless the water is first
dechlorinated and discharges are not expected to adversely affect aquatic life);
2. Runoff or return flow from landscape irrigation, lawn irrigation, and other irrigation
utilizing potable water, groundwater, or surface water sources;
3. Discharges from potable water sources that do not violate Texas Surface Water Quality
Standards;
4. Diverted stream flows;
5. Rising ground waters and springs;
6. Uncontaminated ground water infiltration;
7. Uncontaminated pumped ground water;

Page 56

2024 Small MS4 General Permit
Part II, Section E
Page 16
8. Foundation and footing drains;
9. Air conditioning condensation;
10. Water from crawl space pumps;
11. Individual residential vehicle washing;
12. Flows from wetlands and riparian habitats;
13. Dechlorinated swimming pool discharges that do not violate Texas Surface Water Quality
Standards;
14. Street wash water excluding street sweeper wastewater;
15. Discharges or flows from emergency fire-fighting activities (emergency fire-fighting
activities do not include washing of trucks, runoff water from training activities, test water
from fire suppression systems, and similar activities);
16. Other allowable non-stormwater discharges listed in 40 CFR § 122.26(d)(2)(iv)(B)(1);
17. Non-stormwater discharges that are specifically listed in the TPDES Multi-Sector General
Permit (MSGP) TXR050000 or the TPDES Construction General Permit (CGP)
TXR150000;
18. Discharges that are authorized by a TPDES or NPDES permit or that are not required to be
permitted; and
19. Other similar occasional incidental non-stormwater discharges such as spray park water,
unless the TCEQ develops permits or regulations addressing these discharges.
Section E. Limitations on Permit Coverage
1. Discharges Authorized by Another TPDES Permit
Discharges authorized by an individual or other general TPDES permit may be authorized
under this TPDES general permit only if the following conditions are met:
(a)
The discharges meet the applicability and eligibility requirements for coverage under
this general permit;
(b)
A previous application or permit for the discharges has not been denied, terminated, or
revoked by the executive director as a result of enforcement or water quality related
concerns. The executive director may provide a waiver to this provision based on new
circumstances at the regulated small MS4; and
(c)
The executive director has not determined that continued coverage under an individual
permit is required based on consideration of an approved TMDL model and TMDL
Implementation Plan, anti-backsliding policy, history of substantive non-compliance
or other 30 TAC Chapter 205 considerations and requirements, or other site-specific
considerations.
2. Discharges of Stormwater Mixed with Non-Stormwater
Stormwater discharges that combine with sources of non-stormwater are not eligible for
coverage by this general permit, unless either the non-stormwater source is described in Part
II.D of this general permit or the non-stormwater source is authorized under a separate
TPDES permit.

Page 57

2024 Small MS4 General Permit
Part II, Section E
Page 17
3. Compliance with Texas Surface Water Quality Standards
Discharges to surface water in the state that would cause, has the reasonable potential to
cause, or contribute to a violation of Texas Surface Water Quality Standards (30 TAC
Chapter 307) or that would fail to protect and maintain existing designated uses are not
eligible for coverage under this general permit except as described in Part III. The executive
director may require an application for a TPDES individual permit or alternative general
permit to authorize discharges to surface water in the state if the executive director
determines that an activity will cause has the reasonable potential to cause, or contribute to,
a violation of Texas Surface Water Quality Standards or is found to cause, have the
reasonable potential to cause, or contribute to the impairment of a designated use of surface
water in the state. The executive director may also require an application for a TPDES
individual permit based on factors described in Part II.G.2.
4. Discharges to the Edwards Aquifer Recharge Zone
Discharges of stormwater from regulated small MS4s, and other non-stormwater discharges,
are not authorized by this general permit where those discharges are prohibited by 30 TAC
Chapter 213 (Edwards Aquifer Rule). New discharges located within the Edwards Aquifer
Recharge Zone, or within that area upstream from the recharge zone and defined as the
Contributing Zone, must meet all applicable requirements of, and operate according to, 30
TAC Chapter 213 (Edwards Aquifer Rule) in addition to the provisions and requirements of
this general permit.
For existing discharges, the requirements of the TCEQ approved Water Pollution Abatement
Plan (WPAP) under the Edwards Aquifer Rule are in addition to the requirements of this
general permit. BMPs and maintenance schedules for structural stormwater controls, for
example, may be required as a provision of the rule. All applicable requirements of the
Edwards Aquifer Rule for reductions of suspended solids in stormwater runoff are in
addition to the effluent limitation requirements found in Part VII.E.7. of this general permit.
The permittee’s TCEQ approved WPAPs that are required by the Edwards Aquifer Rule must
be referenced in the SWMP. Additional TCEQ approved WPAPs received after the SWMP
submittal must be recorded in the annual report required by this general permit for each
respective permit year. For discharges originating from the small MS4 permitted area and
located on or within ten stream miles upstream of the Edwards Aquifer recharge zone,
applicants must also submit a copy of the MS4 Notice of Intent (NOI) to the appropriate
TCEQ Regional Office with each WPAP application.
Counties: Comal, Bexar, Medina, Uvalde, and Kinney
Contact:
TCEQ, Water Program Manager
San Antonio Regional Office
14250 Judson Road
San Antonio, Texas 78233-4480
(210) 490-3096
Counties: Williamson, Travis, and Hays
Contact:
TCEQ, Water Program Manager

Page 58

Small MS4 General Permit
Part II, Section F
Page 18
Austin Regional Office
12100 Park 35 Circle, Bldg. A, Rm 179
Austin, Texas 78753
(512) 339-2929
5. Discharges to Specific Watersheds and Water Quality Areas
Discharges of stormwater from regulated small MS4s and other non-stormwater discharges
are not authorized by this general permit where prohibited by 30 TAC Chapter 311 (relating
to Watershed Protection) for water quality areas and watersheds.
6. Protection of Streams and Watersheds by Home Rule Municipalities
This general permit does not limit the authority of a home-rule municipality established in
Texas Statue.
7. Indian Country Lands
Stormwater runoff from small MS4s that occur on Indian Country lands are not under the
authority of the TCEQ and are not eligible for coverage under this general permit. If
discharges of stormwater require authorization under federal NPDES regulations, authority
for these discharges must be obtained from EPA.
8. Endangered Species Act
Discharges that would adversely affect a listed endangered or threatened species or its
critical habitat are not authorized by this general permit. Federal requirements related to
endangered species apply to all TPDES permitted discharges, and site-specific controls may
be required to ensure that protection of endangered or threatened species is achieved. If a
permittee has concerns over potential impacts to listed species, the permittee shall contact
TCEQ for additional information prior to submittal of the NOI. If adverse impact is
determined after submittal of the NOI, the permittee shall contact TCEQ immediately to
determine corrective action.
Section F. Obtaining Authorization
1. Application for Coverage
Applicants seeking authorization to discharge under this general permit must prepare a SWMP
as described in Part II.F.5 and Part IV prior to submitting a complete NOI and application fee
for coverage as described in Part II.F.4 to the executive director. The NOI must be submitted
electronically via the NeT-MS4 online e-permitting system, unless the MS4 operator requested
and obtained an Electronic Reporting Waiver as described in Part II.F.11. MS4 operators that
are granted an Electronic Reporting Waiver shall submit the request on a paper NOI form
provided by the executive director.
Following review of the NOI, the executive director may: 1) determine that the submission is
complete and approve the NOI; 2) determine that the NOI is incomplete, deny coverage, and
require that a new complete NOI be submitted; 3) determine that the NOI needs revisions,
provide a written description of the required revisions along with any compliance schedule(s),
and approve the NOI after revisions are complete; or 4) deny coverage under this general permit

Page 59

Small MS4 General Permit
Part II, Section F
Page 19
and provide a deadline by which the small MS4 operator must submit an application for a
TPDES individual permit.
Following approval of the NOI by the executive director, either with or without changes, the
applicant is authorized to discharge upon notification by TCEQ. Denial of coverage under this
general permit is subject to the requirements of 30 TAC § 205.4(c).
2. Application Deadlines
Application deadlines are as follows:
(a)
Small MS4s Located in a 2000 or 2010 urban area with a population of at least 50,000
people (Previously Regulated Small MS4s)
(1)
Operators of small MS4s described in Part II.A.1 that applied for authorization
under the 2019 TPDES Small MS4 General Permit TXR040000 based on the
2000 and 2010 urban areas with a population of at least 50,000 people shall
submit an NOI within 180 days following the effective date of this general permit.
(2)
Operators of small MS4s described in Part II.A.1 that did not submit an
application for authorization under the 2019 TPDES Small MS4 General Permit
TXR040000 and were required to obtain permit coverage based on the 2000 and
2010 urban areas with a population of at least 50,000 people shall submit an NOI
immediately.
(b)
Designated and Newly Regulated Small MS4s Located in a 2000, 2010, 0r 2020 urban
area with a population of at least 50,000 people as defined by the U.S. Census Bureau
(1) Following designation, operators of small MS4s described in Part II.A.2 shall
develop and maintain a SWMP and submit an NOI, or apply for coverage under a
TPDES individual permit, within 180 days of being notified in writing by the TCEQ
of the need to obtain permit coverage.
(2) Operators of small MS4s newly regulated under this general permit due to a
change in ownership or operational control shall develop and maintain a SWMP
and submit an NOI, or apply for coverage under a TPDES individual permit, within
180 days of obtaining ownership or operational control of a small MS4 in a
regulated area.
(3) Operators of small MS4s newly regulated under this general permit due to the new
or expanded urban areas with a population of at least 50,000 people in the 2020
Decennial Census shall develop and maintain a SWMP and submit an NOI, or
apply for coverage under a TPDES individual permit, within 180 days following the
effective date of this general permit.
(c)
Individual Permit Alternative
If an operator of a small MS4 described in Part II.A.1 of this general permit elects to
apply for a TPDES individual permit, the application must be submitted within 90 days
following the effective date of this general permit.
3. Late Submission of the NOI
If an NOI is submitted by a small MS4 operator after the deadlines established in Part II.F.2,
then this general permit provides authorization only for discharges that occur after permit
coverage is obtained. The TCEQ reserves the right to take appropriate enforcement actions
for any unpermitted discharges.

Page 60

Small MS4 General Permit
Part II, Section F
Page 20
4. Contents of the NOI
The NOI must contain the following minimum information:
(a)
MS4 Operator Information
(1)
The name, mailing address, electronic mail (email) address, telephone number,
and facsimile (fax) number of the MS4 operator; and
(2)
The legal status of the MS4 operator (for example, federal government, state
government, county government, city government, or other government).
(b)
Site Information
(1)
The name, physical location description, and latitude and longitude of the
approximate center of the regulated portion of the small MS4;
(2)
County or counties where the small MS4 is located;
(3)
An indication if all or a portion of the small MS4 is located on Indian Country
Lands;
(4)
The name, mailing address, telephone number, email (if available) and fax
number of the designated person(s) responsible for implementing or
coordinating implementation of the SWMP;
(5)
A signature and certification on the NOI, according to 30 TAC § 305.44, that a
SWMP has been developed according to the provisions of this general permit;
(6)
The name of each classified segment that receives discharges, directly or
indirectly, from the small MS4. If one or more of the discharge(s) is not directly
to a classified segment, then the name of the first classified segment that those
discharges reach must be identified;
(7)
The name of any MS4 receiving the discharge prior to discharge into Waters of
the U.S.;
(8)
The name of all surface water(s) receiving discharges from the small MS4 that are
on the latest EPA-approved CWA § 303(d) List of impaired waters;
(9)
An indication of whether the small MS4 discharges within the Recharge Zone, the
Contributing Zone or the Contributing Zone within the Transition Zone of the
Edwards Aquifer; and
(10) Any other information deemed necessary by the executive director.
(c)
General Characteristics
(1)
An indication of the activities/BMPs and measurable goals to be implemented in
the SWMP for each MCM;
(2)
An indication of the activities/BMPs and measurable goals to be implemented in
the SWMP for impaired water bodies, if applicable;
(3)
For small MS4 operators participating in a coalition to implement a shared
SWMP:
a.
The names of all participating small MS4 operators;
b.
An indication of which small MS4 operator is responsible for each
activity/BMP and measurable goal to be implemented in the SWMP;
(4)
Any other information deemed necessary by the executive director.

Page 61

Small MS4 General Permit
Part II, Section F
Page 21
5. SWMP General Requirements
A SWMP must be developed for eligible discharges that will reach Waters of the U.S.,
including discharges from the regulated small MS4 to other MS4s or to privately-owned
separate storm sewer systems that subsequently drain to Waters of the U.S. The SWMP must
be developed according to the requirements of Part IV of this general permit prior to
submitting an NOI to obtain authorization to discharge.
The SWMP must include, as appropriate, the months and years in which the permittee will
undertake required actions, including interim milestones and the frequency of the action
throughout the permit term.
New elements in the SWMP must be completely implemented within five years of the
effective date of this general permit, or within five years of being designated for those small
MS4s which are designated following their permit authorization issuance. Previously
regulated MS4s shall assess existing SWMP elements set forth in the previous permit term,
modify as necessary, and develop and implement new elements, as necessary, to continue
reducing the discharge of pollutants from the small MS4 to the maximum extent practicable
(MEP).
6. Changes to the NOI Submitted and SWMP
Changes to the NOI and SWMP that are made after TCEQ approval of the NOI may be made
by submittal and approval of a Notice of Change (NOC) unless the changes are non-
substantial. Changes may be made as follows:
(a)
Changes to the SWMP that do not require an NOC
The following changes may be implemented without submitting an NOC. The changes
may be made immediately following revision of the SWMP.
Minor modifications to the SWMP that include administrative or non-substantial
changes as follows:
(1)
A change in personnel, or a reorganization of departments responsible for
implementing the SWMP or portions of the SWMP;
(2)
Minor clarifications to the existing BMPs;
(3)
Correction of typographical errors; or
(4)
Other similar administrative or non-substantive comments.
(b)
Changes to the NOI and SWMP that require an NOC
Modifications to the NOI and SWMP that include, but are not limited to, the following
changes require submittal of an NOC. The changes may be implemented once the
permittee receives TCEQ approval of the NOC.
(1)
Changing one or more contacts listed in the NOI or updating their contact
information;
(2)
Adding components, controls, or requirements to the SWMP;
(3)
Adding areas such as by annexing land, or otherwise acquire additional land that
expands the boundary of the small MS4, or subtracting areas, such as by de-
annexing lands;
(4)
Adding impaired water bodies that are identified pursuant to Part III.;

Page 62

Small MS4 General Permit
Part II, Section F
Page 22
(5)
Adding more frequent monitoring or reporting by the permittee; or
(6)
Replacing a BMP specifically identified in the NOI and SWMP with an alternative
BMP, (for example, replacing a structural BMP with a non-structural BMP would
be considered a replacement). The SWMP must include documentation for
changes as described below:
a. For changes to BMPs for impaired water bodies with a TMDL, document the
following:
(i) an analysis of why the BMP is ineffective or infeasible (including cost
prohibitive);
(ii) expectations of the effectiveness of the replacement BMP; and
(iii) an analysis of why the replacement BMP is expected to achieve the goals
of the BMP to be replaced.
b. For all other BMP changes, document the reason for the change.
7. Notice of Change (NOC)
If the small MS4 operator becomes aware that it failed to submit any relevant facts, or
submitted incorrect information in the NOI, the correct information must be provided to the
executive director in an NOC within 30 days after discovery. If any information provided in
the NOI changes, an NOC must be submitted within 30 days from the time the permittee
becomes aware of the change. The NOC must be submitted electronically via the NeT-MS4
online e-permitting system, unless the MS4 operator requested and obtained an Electronic
Reporting Waiver as described in Part II.F.11. MS4 operators that are granted an Electronic
Reporting Waiver shall submit the request on a paper NOC form provided by the executive
director.
Any revisions that are made to the SWMP must be made in accordance with Parts II.F.6 and
Part IV.A-B. Changes that are made to the NOI and SWMP following NOI approval must be
made using an NOC form, in accordance with Part II.F.6.
8. Change in Operational Control of a Small MS4
If the operational control of the regulated small MS4 changes, the previous small MS4
operator must submit a Notice of Termination (NOT) and the new small MS4 operator must
prepare a SWMP and submit an NOI. The NOT and NOI must be submitted concurrently not
more than ten calendar days after the change occurs. Existing permittees who are expanding
coverage of their MS4 area (e.g., city annexes part of unincorporated county MS4) are not
required to submit a new NOI but must submit an NOC and update the SWMP in
accordance with Part II.F.7 and Part IV.C.1.(c).
9. Notice of Termination (NOT)
A permittee may terminate coverage under this general permit by submitting an NOT
electronically via the NeT-MS4 online e-permitting system, unless the permittee requested
and obtained an Electronic Reporting Waiver as described in Part II.F.11. Permittees that are
granted an Electronic Reporting Waiver shall submit the request on a paper NOT form
provided by the executive director.
Authorization to discharge terminates immediately following confirmation of receipt of the
electronic NOT form by the TCEQ or at midnight on the day that a paper NOT is postmarked

Page 63

Small MS4 General Permit
Part II, Section F
Page 23
for delivery to the TCEQ. An NOT must be submitted within 30 days after the small MS4
operator obtains coverage under an individual permit.
10. Signatory Requirement for NOI, NOT, NOC, and Waiver Forms
All NOI, NOT, NOC, Waiver Option 1 or Option 2, and Electronic Reporting Waiver forms
must be signed and certified consistent with 30 TAC § 305.44(a) and (b) (relating to
Signatories to Applications).
11. Electronic Reporting Waiver
To request a waiver from electronic reporting, small MS4 operators must contact the TCEQ
Stormwater Team to obtain the Request for Electronic Reporting Waiver Form (TCEQ-
20754). This form must be submitted along with submittal of a paper application (NOI,
NOT, NOC, Waiver Option 1 and 2) for authorization under this general permit.
A waiver from electronic reporting may be granted to small MS4 operators in limited cases,
such as for lack of internet access, or when additional training to submit applications
electronically is needed. Electronic Reporting Waivers are not transferrable and expire on
the same date as the authorization to discharge except for waivers granted to small MS4
operators who need additional training to submit applications electronically which will
expire after one year.
12. Fees
An application fee of $400.00 must be submitted with each NOI. A fee is not required for
submission of the following forms: Waiver Option 1, Waiver Option 2, NOT, or NOC.
A permittee authorized under this general permit must pay an annual Water Quality fee of
$100.00 as authorized under TWC § 26.0291 and 30 TAC Chapter 205 (relating to General
Permits for Waste Discharges).
13. Permit Expiration
(a)
This general permit is effective for five years from the permit effective date.
Authorizations for discharge under the provisions of this general permit will continue
until the expiration date of the general permit. This general permit may be amended,
revoked, or canceled by the commission or renewed by the TCEQ for an additional
term not to exceed five years.
(b)
If the executive director proposes to reissue this general permit before the expiration
date, the general permit will remain in effect until the date on which the commission
takes final action on the proposal to reissue this general permit. For existing
permittees, general permit coverage will remain in effect after the expiration date of
the existing general permit, in accordance with 30 TAC Chapter 205. No new NOIs will
be accepted, and no new authorizations will be processed under the general permit
after the expiration date.
(c)
Following issuance of a renewed or amended general permit, all permittees, including
those covered under the expired general permit, may be required to submit an NOI
according to the requirements of the new general permit or to obtain a TPDES
individual permit for those discharges. The renewed permit will include a deadline to
apply for coverage, and authorization for existing permittees will be automatically
extended until the deadline to apply for coverage, or until an application is submitted
for renewal, whichever occurs first.

Page 64

2024 Small MS4 General Permit
Part II, Section G
Page 24
(d)
If TCEQ does not propose to reissue this general permit within 90 days before the
expiration date, permittees must apply for authorization under a TPDES individual
permit or an alternative general permit. If the application for an individual permit is
submitted before the expiration date of this general permit, authorization under this
expiring general permit remains in effect until the issuance or denial of an individual
permit.
14. Suspension of Permit Coverage
The executive director may suspend an authorization under this general permit for the
reasons specified in 30 TAC § 205.4(d) by providing the discharger with written notice of the
decision to suspend that authority, and the written notice will include a brief statement of
the basis for the decision. If the decision requires an application for an individual permit or
an alternative general permit, the written notice will also include a statement establishing
the deadline for submitting an application. The written notice will state that the
authorization under this general permit is either suspended on the effective date of the
commission's action on the permit application, unless the commission expressly provides
otherwise, or immediately, if required by the executive director.
Section G. Permitting Options
1. Authorization Under the General Permit
An operator of a small MS4 is required to obtain authorization either under this general
permit, or under a TPDES individual permit if the MS4 is located in an urban area with a
population of at least 50,000 people or designated by the TCEQ as per Part II.A.2. Multiple
small MS4s with separate operators must individually submit an NOI to obtain coverage
under this general permit, regardless of whether the systems are physically interconnected,
located in the same urban area with a population of at least 50,000 people, or are located in
the same watershed.
Coalition Participants
Multiple small MS4s that are physically interconnected, located in the same urban area with
a population of at least 50,000 people, or are located in the same watershed may combine or
share efforts as a coalition in meeting one or more of the BMP requirements described in the
general permit. Each regulated small MS4 will be required to submit an individual NOI and
be issued a distinct permit authorization number. MS4 operators in a coalition that share
SWMP development and implementation responsibilities must meet the following
conditions:
(a)
The SWMP must clearly list the name and permit number for each MS4 operator that
chooses to contribute to development or implementation of the SWMP, and provide
written confirmation that the contributing MS4 operator(s) has/have agreed to
contribute. If a contributing small MS4 has submitted an NOI to TCEQ, but has not yet
received written notification of approval, along with the accompanying permit
authorization number, a copy of the submitted NOI form must be made readily
available or be included in the SWMP.
(b)
Each permittee is entirely responsible for meeting SWMP requirements within the
boundaries of its small MS4. Where a separate MS4 operator is contributing to
implementation of the SWMP, the SWMP must clearly define each minimum control
measure and the component(s) each entity agrees to implement, within which MS4
area(s) each entity agrees to implement and clearly identify the contributing MS4

Page 65

2024 Small MS4 General Permit
Part III, Section A
Page 25
operator. The obligation and written acceptance for each coalition participant shall be
described and maintained as part of the SWMP.
2. Alternative Coverage Under an Individual TPDES Permit
A small MS4 operator eligible for coverage under this general permit may alternatively be
authorized under a TPDES individual permit according to 30 TAC Chapter 305 (relating to
Consolidated Permits). The executive director may require a small MS4 operator, authorized
by this general permit, to apply for a TPDES individual permit because of: the conditions of
an approved TMDL or TMDL implementation plan (I-Plan); a history of substantive non-
compliance; or other 30 TAC Chapter 205 considerations and requirements; or other site-
specific considerations. The executive director shall deny or suspend a facility’s
authorization for disposal under this general permit based on a rating of “unsatisfactory
performer” according to commission rules in 30 TAC § 60.3, Use of Compliance History. An
applicant who owns or operates a facility classified as an “unsatisfactory performer” is
entitled to a hearing before the commission prior to having its coverage denied or
suspended, in accordance with TWC § 26.040(h).
Part III.
Impaired Water Bodies and Total Maximum Daily Load (TMDL)
Requirements
Discharges of the POCs to impaired water bodies for which there is a TCEQ and EPA approved
TMDL are not eligible for this general permit unless they are consistent with the approved
TMDL. A water body is impaired for purposes of the permit if it has been identified, pursuant to
the latest TCEQ and EPA approved CWA § 303(d) List or the Texas Integrated Report of
Surface Water Quality for CWA Sections 305(b) and 303(d) which lists the category 4 and 5
water bodies, as not meeting Texas Surface Water Quality Standards.
The permittee shall check annually, in conjunction with preparation of the annual report,
whether an impaired water body within its permitted area has been added to the latest EPA
approved CWA § 303(d) List or the Texas Integrated Report of Surface Water Quality for CWA
Sections 305(b) and 303(d) which lists the category 4 and 5 water bodies. Within two years
following the approval date of the new list(s) of impaired waters, the permittee shall comply
with the requirements of Part III.B (with the exception of 1.(c), and shall identify any newly
listed waters in the annual report (consistent with Part V.B.2.f) and SWMP (consistent with Part
IV.C.2.f).
The permittee shall control the discharges of POCs parameters to impaired waters and waters
with approved TMDLs as provided in Sections A and B below, and shall assess the progress in
controlling those pollutants.
Section A. Discharges to Water Quality Impaired Water Bodies with an
Approved TMDL
If the small MS4 discharges to an impaired water body with an approved TMDL, where
stormwater has the potential to cause or contribute to the impairment, the permittee shall
include in the SWMP controls targeting the POCs along with any additional or modified controls
required in the TMDL and this section.
The SWMP and required annual reports must include information on implementing any
targeted controls required to reduce the POCs as described below:

Page 66

2024 Small MS4 General Permit
Part III, Section A
Page 26
1. Targeted Controls
The SWMP must include a detailed description of all targeted controls to be implemented,
including at a minimum, expanding or modifying the following:
(a) existing Public Education and Outreach and Public Involvement/Participation
programs to reduce the discharge of POCs,
(b) existing Illicit Discharge Detection and Elimination program to specifically address the
POCs, and
(c) existing ordinances or other regulatory mechanisms to require the reduction or control
of POCs, enforcement procedures for noncompliance, and develop additional
ordinances, or other regulatory mechanisms, as necessary.
2. Measurable Goals
For each targeted control, the SWMP must include a measurable goal and an
implementation schedule describing activities/BMPs to be implemented during each year of
the permit term.
3. Identification of Benchmarks
The SWMP must identify a benchmark for the POCs. Benchmarks are designed to assist in
determining if the BMPs established are effective in addressing the POCs in stormwater
discharge(s) from the MS4 to the MEP. The BMPs addressing the POC must be re-evaluated
on an annual basis for progress towards the benchmarks and modified as necessary within
an adaptive management framework. These benchmarks are not numeric effluent
limitations or permit conditions but intended to be guidelines for evaluating progress
towards reducing pollutant discharges consistent with the benchmarks. The exceedance of a
benchmark is not a permit violation and does not in itself indicate a violation of instream
water quality standards.
The benchmark must be determined based on only one of the following options:
(a) If the small MS4 is subject to a TMDL that identifies a Waste Load Allocation(s) (WLA)
for permitted MS4 stormwater sources, then the SWMP may identify it as the
benchmark. Where an aggregate allocation is used as a benchmark, all affected MS4
operators are jointly responsible for progress in meeting the benchmark and shall
(jointly or individually) develop a monitoring/assessment plan as required in Part
III.A.6.
(1)
When TCEQ revises a TMDL WLA identified by the MS4 to decrease the load,
permittees must revise the SWMP and submit an NOC to identify the revised
WLA within 90 days of TCEQ publishing the change.
(2)
When TCEQ revises a TMDL WLA identified by the MS4 to increase the load,
permittees are not required to update the SWMP or submit an NOC to identify
the revised WLA until the next permit term.
(b)
Alternatively, if multiple small MS4s are discharging into the same impaired water
body with an approved TMDL, with an aggregate WLA for all permitted stormwater
MS4s, then the MS4s may combine or share efforts to determine an alternative sub-
benchmark value for the POCs (e.g., bacteria) for their respective small MS4. The
SWMP must clearly define this alternative approach and must describe how the sub-
benchmark value would cumulatively support the aggregate WLA. Where an
aggregate benchmark has been broken into sub-benchmark values for individual

Page 67

2024 Small MS4 General Permit
Part III, Section A
Page 27
MS4s, each permittee is only responsible for progress in meeting its sub-benchmark
value.
4. Annual Report
The annual report must include an analysis of how the selected activities/BMPs will be
effective in contributing to achieving the benchmark value.
5. Impairment for Bacteria
If the POC is bacteria, the permittee shall implement BMPs addressing each of the below
areas, as applicable, in the SWMP and implement as appropriate. If a TMDL I-Plan is
available, the permittee must do one of the following: (1) refer to the I-Plan for appropriate
BMPs, or (2) implement alternative equivalent BMPs. Table 1 below includes the appropriate
alternative equivalent BMPs to implement for item (2) above or when a TMDL I-Plan is not
available. Where BMPs included in the TMDL I-Plan for item (1) above are completed or
where the I-Plan does not address all the below areas, the permittee shall refer to Table 1 for
the appropriate BMPs to implement so that each of the areas below are addressed, as
applicable.
The SWMP and annual report must include the selected BMPs. Permittees may not exclude
BMPs associated with the minimum control measures (MCMs) required under 40 CFR §
122.34 from their list of BMPs.
The BMPs shall, as appropriate, address the following including Table 1.:
(a) Sanitary Sewer Systems
(1)
Make improvements to sanitary sewers to reduce overflows;
(2)
Address lift station inadequacies;
(3)
Improve reporting of overflows; and
(4)
Strengthen sanitary sewer use requirements to reduce blockage from fats, oils,
and grease.
(b) On-site Sewage Facilities (for entities with appropriate jurisdiction)
(1)
Identify and address failing systems; and
(2)
Address inadequate maintenance of on-site sewage facilities (OSSFs) (i.e., septic
systems).
(c) Illicit Discharges and Dumping
Place additional effort to reduce waste sources of bacteria, for example, from OSSFs,
grease traps, and grit traps.
(d) Animal Sources
Expand existing management programs to identify and target animal sources such as
zoos, pet waste, and horse stables.
(e) Residential Education
Increase focus to educate residents on:
(1)
Bacteria discharging from a residential site either during runoff events or
directly;
(2)
Fats, oils, and grease clogging sanitary sewer lines and resulting overflows;

Page 68

2024 Small MS4 General Permit
Part III, Section A
Page 28
(3)
Maintenance and operation of decorative ponds; and
(4)
Proper disposal of pet waste.
Table 1: Alternative Equivalent BMPs for Bacteria Impaired Water Bodies
Activity/BMP
Measurable Goal
Sanitary Sewer Systems as
described by Part III.A.5.(a).
Conduct a review of 100% of the sanitary sewer system in
the MS4 area within the impairment watershed to identify
areas for improvement within the first two years of the
permit term. Initiate all feasible improvement projects by
the end of the permit term.
Conduct weekly lift station inspections at 100% of the MS4
owned and operated lift stations in the MS4 area within
the impairment watershed each year.
Investigate and address 100% of sanitary sewer overflow
complaints identified through the public reporting
mechanism implemented by the MS4 each year.
Strengthen sanitary sewer use requirements to reduce
blockage from fats, oils, and grease by reviewing and
updating ordinances or other regulatory mechanisms and
inspection programs at least one time annually.
On Site Sewage Facilities
(OSSFs) as described by
Part III.A.5.(b).
Develop and implement procedures to screen 20% of the
MS4 area within the impairment watershed annually to
identify failing OSSFs.
•
Maintain an inventory of 100% of the identified
OSSFs and their status each year.
o Review and update this inventory at least one
time each year to address changes or additions.
•
Address 100% of failing OSSFs each year by
requiring the responsible party to perform all
necessary corrective actions to eliminate the illicit
discharge.
Investigate and address 100% of OSSF complaints
identified through the public reporting mechanism
implemented by the MS4 each year.
Illicit Discharges and
Dumping as described by
Part III.A.5.(c).
Ensure 100% of procedures and ordinances or other
regulatory mechanisms established for BMPs in MCM 3:
Illicit Discharge Detection and Elimination address
discharges that may contribute bacteria including from
OSSFs, grease traps, and grit traps.

Page 69

2024 Small MS4 General Permit
Part III, Section A
Page 29
Activity/BMP
Measurable Goal
Animal Sources as described
by Part III.A.5.(d).
Implement at least one of the following:
•
Provide and maintain at least one pet waste station
in 100% of public parks or similar greenspaces in
the MS4 area within the impairment watershed
each year.
•
Assess and address, if feasible, 100% of complaints
received about feral hogs in the MS4 area within
the impairment watershed each year. If infeasible
to address the complaint, maintain documentation
of the reason. Prohibit the feeding of ducks and
geese in 100% of public parks or similar
greenspaces the MS4 area within the impairment
watershed each year.
•
Develop and distribute educational materials
related to animal sources of bacteria to 75% of the
intended audiences identified by the MS4 in MCM
1: Public Education and Outreach each year.
Develop and implement a tracking system to
estimate what percentage of the intended audience
is reached for determining BMP effectiveness.
Residential Education as
described by Part III.A.5.(e).
Implement at least one additional BMP from MCM 1:
Public Education and Outreach and Table 4 annually (e.g.,
a Level 1 small MS4 operator must implement at least four
total BMPs under MCM 1 each year in the permit cycle
instead of the three BMPs required by Part IV.D.1.(a)3.b).
In addition, ensure at least one of the BMPs implemented
for MCM 1: Public Education and Outreach focuses on at
least one of the following:
•
Bacteria discharging from a residential site either
during runoff events or directly;
•
Fats, oils, and grease clogging sanitary sewer lines
and resulting overflows;
•
Identifying and reporting illicit discharges or illegal
dumping;
•
Maintenance and operation of decorative ponds;
and
•
Proper disposal of pet waste.
6. Monitoring or Assessment of Progress
The permittee shall develop a Monitoring/Assessment Plan to monitor or assess progress in
achieving benchmarks and determine the effectiveness of BMPs, and shall include
documentation of this monitoring or assessment in the SWMP and annual reports. In
addition, the SWMP must include methods to be used.

Page 70

2024 Small MS4 General Permit
Part III, Section B
Page 30
(a) The permittee may use either of the following methods to evaluate progress towards the
benchmark and improvements in water quality in achieving the water quality standards
as follows:
(1) Evaluating Program Implementation Measures
The permittee may evaluate and report progress towards the benchmark by
describing the activities and BMPs implemented, by identifying the
appropriateness of the identified BMPs, and by evaluating the success of
implementing the measurable goals.
The permittee may assess progress by using program implementation indicators
such as: (1) number of sources identified or eliminated; (2) decrease in the number
of illegal dumpings; (3) increase in illegal dumping reporting; (4) number of
educational opportunities conducted; (5) reductions in sanitary sewer overflows
(SSOs); or (6) increase in illegal discharge detection through dry screening, etc.
(2) Assessing Improvements in Water Quality
The permittee may assess improvements in water quality by using available data
for segment and assessment units of water bodies from other reliable sources, or
by proposing and justifying a different approach such as collecting additional
instream or outfall monitoring data, etc. Data may be acquired from TCEQ, local
river authorities, partnerships, or other local efforts as appropriate.
(b) Progress towards achieving the benchmark shall be reported in the annual report.
Annual reports shall report the benchmark and the year(s) during the permit term that
the MS4 conducted additional sampling or other assessment activities.
7. Observing No Progress Towards the Benchmark
If, by the end of the third year from the effective date of the permit, the permittee observes
no progress toward the benchmark either from SWMP implementation or water quality
assessments as described in Part III.A.6, the permittee shall identify alternative focused
BMPs that address new or increased efforts towards the benchmark or, as appropriate, shall
develop a new approach to identify the most significant sources of the POCs and shall
develop alternative focused BMPs for those sources (this may also include information that
identifies issues beyond the MS4’s control). These revised BMPs must be included in the
SWMP and subsequent annual reports.
Where the permittee originally used a benchmark value based on an aggregated WLA, the
permittee may combine or share efforts with other MS4s discharging to the same watershed
to determine an alternative sub-benchmark value for the POCs for their respective small
MS4s, as described in Part III.A.3(b) above. Permittees must document, in their SWMP for
the next permit term, the proposed schedule for the development and subsequent adoption
of alternative sub-benchmark value(s) for the POCs for their respective MS4s and associated
assessment of progress in meeting those individual benchmarks.
Section B. Discharges Directly to Water Quality Impaired Water Bodies Without
an Approved TMDL
The permittee shall also determine whether the permitted discharge is directly to one or more
water quality impaired water bodies where a TMDL has not yet been approved by TCEQ and
EPA. If the permittee discharges directly into an impaired water body without an approved
TMDL, the permittee shall perform the following activities:

Page 71

2024 Small MS4 General Permit
Part IV, Section A & B
Page 31
1. Discharging a Pollutant of Concern
(a) The permittee shall determine whether the small MS4 may be a source of the POCs by
referring to the CWA § 303(d) List and then determining if discharges from the MS4
would be likely to contain the POCs at levels of concern.
(b) If the permittee determines that the small MS4 may discharge the POCs, the permittee
shall ensure that the SWMP includes focused BMPs, along with corresponding
measurable goals, that the permittee will implement, to reduce, the discharge of POCs
that contribute to the impairment of the water body.
(c) In addition, the permittee shall submit an NOC to amend the SWMP in accordance
with Part II.F.6 to include any additional BMPs to address the POCs. This requirement
does not apply to BMPs implemented to address impaired waters that are listed after a
small MS4’s permit authorization pursuant to Part III.
2. Impairment for Bacteria
Where the impairment is for bacteria, the permittee shall identify potential significant
sources and develop and implement focused BMPs for those sources. The permittee must
implement the BMPs listed in Part III.A.5 and Table 1 for the identified sources.
3. Annual Report
The annual report must include information on compliance with the Discharges Directly to
Water Quality Impaired Water Bodies Without an Approved TMDL section, including
results of any sampling conducted by the permittee.
Part IV.
Stormwater Management Program (SWMP)
To the extent allowable under state and local law, a SWMP must be developed, implemented,
and enforced according to the requirements of Part II.F.5 and Part IV of this general permit for
stormwater discharges that reach Waters of the U.S., regardless of whether the discharge is
conveyed through a separately operated storm sewer system. The SWMP must be developed,
implemented, and enforced to reduce the discharge of pollutants from the small MS4 to the
MEP, to protect water quality, and to satisfy the appropriate water quality requirements of the
CWA and the TWC.
A permittee that implements activities/BMPs and measurable goals consistent with the
provisions of this general permit fulfills the requirements to reduce pollutants to the MEP and
will be deemed in compliance with Part IV of this permit. This general permit does not extend
any compliance deadlines set forth under the 2019 TPDES Small MS4 General Permit
TXR040000.
Section A. SWMP Review
The permittee shall participate in an annual review of its SWMP in conjunction with preparation
of the annual report required in Part V.B.2. Results and date(s) of the review shall be
documented in the annual report.
Section B. SWMP Updates Required by TCEQ
Changes may be made to the SWMP during the permit term. The TCEQ may notify the
permittee of the need to modify the SWMP to be consistent with the general permit, in which

Page 72

2024 Small MS4 General Permit
Part IV, Section C
Page 32
case the permittee will have 90 days to finalize such changes to the SWMP, unless otherwise
directed by TCEQ.
Section C. Developing a Stormwater Management Program (SWMP)
1. SWMP Development and Schedule
(a) Existing Regulated Small MS4s
Permittees who were regulated under the 2019 TPDES Small MS4 General Permit
TXR040000, shall develop and update the SWMP under this general permit prior to
submittal of the NOI for coverage.
Existing small MS4 operators shall ensure full implementation of any new elements in
the revised SWMP as soon as practicable, but no later than five years from the permit
effective date. Permittees authorized under any previous TPDES Small MS4 General
Permit TXR040000 shall continue to implement existing elements in their latest
TCEQ approved SWMP until the renewal NOI has been approved.
(b) Designated and Newly Regulated Small MS4s
Small MS4 operators that operate either:
•
a designated small MS4 as per Part II.A.2, or
•
a newly regulated small MS4 under this general permit,
must develop a SWMP under this general permit prior to submittal of the NOI for
coverage and achieve full implementation of the SWMP as soon as practicable, but no
later than five years from designation or obtaining ownership or operational control of
a newly regulated small MS4, as applicable.
(c) Transfer of Ownership, Operational Authority, or Responsibility
The permittee that has been transferred ownership, operational authority, or
responsibility of an MS4 area located in an urban area with a population of at least
50,000 people or designated by TCEQ shall implement the SWMP:
(1) on all new areas added to its portion of the small MS4 (or where the permittee
becomes responsible for implementation of stormwater quality controls) as
expeditiously as possible, but no later than three years from addition of the new
area. Implementation may be accomplished in a phased manner to allow
additional time for controls that cannot be implemented immediately; and
(2) within ninety (90) days of a transfer of ownership, operational authority, or
responsibility for SWMP implementation, the permittee shall have a plan for
implementing the SWMP in all affected areas. The plan must include schedules for
implementation, and information on all new annexed areas. Any resulting updates
required to the SWMP shall be submitted in the annual report.
2. Contents of the SWMP
At a minimum, the permittee shall include the following information in its SWMP:
(a)
A description of MCMs with measurable goals, including, as appropriate, the months
and years when the permittee will undertake required actions, including interim
milestones and the frequency of the action for each required MCM and if selected, the
optional 8th MCM described in Part IV.D;

Page 73

2024 Small MS4 General Permit
Part IV, Section C
Page 33
(b)
A measurable goal that includes the development of ordinances or other regulatory
mechanisms allowed by state, federal and local law, providing the legal authority
necessary to implement and enforce the requirements of this permit, including
information on any limitations to the legal authority;
(c)
The measurable goals selected by the permittee must be clear, specific, and measurable
(40 CFR §122.34);
(d)
A summary of written procedures (e.g., periodic review of ordinances or other
enforcement mechanisms, tracking of SWMP implementation by relevant
departments, etc.) describing how the permittee will implement the provisions in Parts
III and IV of this general permit;
(e)
A description of a program or a plan of compliance with the impaired water bodies and
TMDL requirements in Part III; and
(f)
Identification of any impaired waters that have been added in accordance with Part III.
3. Legal Authority
(a)
Traditional small MS4s, such as cities:
(1)
Within two years from the permit effective date, the permittee shall review and
revise, if needed, its relevant ordinance(s) or other regulatory mechanism(s), or
shall adopt a new ordinance(s) or other regulatory mechanism(s) that provide the
permittee with adequate legal authority to control pollutant discharges into and
from its small MS4 in order to meet the requirements of this general permit.
(2)
To be considered adequate, this legal authority must, at a minimum, address the
following:
a.
Authority to prohibit illicit discharges and illicit connections;
b.
Authority to respond to and contain other releases e.g., control the
discharge of spills, and prohibit dumping or disposal of materials other
than stormwater into the small MS4);
c.
Authority to require compliance with conditions in the permittee’s
ordinances, permits, contracts, or orders;
d.
Authority to require installation, implementation, and maintenance of
control measures;
e.
Authority to receive and collect information, such as stormwater plans,
inspection reports, and other information deemed necessary to assess
compliance with this permit, from operators of construction sites, new or
redeveloped land, and industrial and commercial facilities;
f.
Authority, as needed, to enter and inspect private property including
facilities, equipment, practices, or operations related to stormwater
discharges to the small MS4;
g.
Authority to respond to non-compliance with BMPs required by the small
MS4;
h.
Authority to assess penalties, including monetary, civil, or criminal
penalties; and
i.
Authority to enter into interagency or interlocal agreements or other
maintenance agreements, as necessary.

Page 74

2024 Small MS4 General Permit
Part IV, Section C
Page 34
(b)
Non-traditional small MS4s, such as counties, drainage districts, transportation
entities, municipal utility districts, military bases, prisons, and universities:
(1)
Where the permittee lacks the authority to develop ordinances or to implement
enforcement actions, the permittee shall exert enforcement authority as required
by this general permit for its facilities, employees, contractors, and any other
entity over which it has operational control within the portion of the urban area
with a population of at least 50,000 people under the jurisdiction of the
permittee. For discharges from third party actions, the permittee shall perform
inspections and exert enforcement authority to the MEP.
(2)
If the permittee does not have inspection or enforcement authority and is unable
to meet the goals of this general permit through its own powers, then, unless
otherwise stated in this general permit, the permittee shall perform the following
actions in order to meet the goals of the permit:
a.
Enter into interlocal agreements with municipalities where the small MS4 is
located. These interlocal agreements must state the extent to which the
municipality will be responsible for inspections and enforcement authority
in order to meet the conditions of this general permit; or
b.
If it is not feasible for the permittee to enter into interlocal agreements, the
permittee shall report discharges or incidents that it cannot itself enforce
against to an adjacent MS4 operator with enforcement authority or the
appropriate TCEQ Regional Office. In determining feasibility for entering
into interlocal agreements, the permittee shall consider all factors,
including, without limitations, financial considerations and the willingness
of the municipalities in which the small MS4 is located.
4. Resources
It is the permittee’s responsibility to ensure that it has adequate resources and funding to
implement the requirements of this general permit.
5. Effluent Limitations
The controls and activities/BMPs included in the SWMP constitute effluent limitations for
the purposes of compliance with state rules. This includes the requirements of 30 TAC
Chapter 319, Subchapter B (Hazardous Metals), which lists the maximum allowable
concentrations of hazardous metals for discharge to water in the state.
6. Enforcement Measures
Permittees with enforcement authority (i.e., traditional small MS4s) shall develop a standard
operating procedure (SOP) to respond to violations to the extent allowable under state and
local law. When the permittee does not have enforcement authority over the violator, and
the violations continue after violator has been notified by the permittee, or the source of the
illicit discharge is outside the small MS4’s boundary, the permittee shall notify either the
adjacent MS4 operator with enforcement authority or the appropriate TCEQ Regional Office.
7. General Requirements
Permittees shall provide information in the SWMP documenting the development and
implementation of the small MS4 program. At a minimum, the documentation must include:

Page 75

2024 Small MS4 General Permit
Part IV, Section D
Page 35
(a) A list of all small MS4 operators contributing to the development and implementation
of the SWMP, including a clear description of the role and responsibilities of each small
MS4 operator, if applicable;
(b) A list of any public or private entities assisting with the development or
implementation of the SWMP, including a clear description of the relationship, role,
and responsibilities of each entity, if applicable;
(c) A list of all activities/BMPs and measurable goals for each of the MCMs;
(d) A schedule for the implementation of all SWMP requirements. The schedule must
include, as appropriate, the months and years in which the permittee will undertake
required actions, including interim milestones and the frequency of the action
throughout the permit term;
(e) A description of how each measurable goal will be evaluated; and
(f) A rationale statement that addresses the overall program, including an overall
statement describing how the activities/BMPs and measurable goals were selected.
Section D. Minimum Control Measures (MCMs)
Operators of small MS4s seeking coverage under this general permit shall develop, implement,
and maintain a SWMP that includes the following eight MCMs, as applicable.
•
MCMs 1-6 apply to all small MS4s regardless of their level as described in Part II.B.
•
MCM 7 only applies to Level 4 small MS4s.
•
MCM 8 is optional.
•
Specific program elements under each MCM shall be implemented by all MS4 operators,
unless otherwise noted as applicable for certain levels of small MS4s.
Existing permittees shall assess program elements that were described in their previous TCEQ
approved SWMP. Permittees must modify their SWMP as necessary to develop and implement
new elements or revise existing BMPs to comply with the requirements in this general permit
and continue reducing the discharge of pollutants from the small MS4 to the MEP.
Permittees shall provide justification within the SWMP for any requirements that were not
implemented because they were not applicable as described in each MCM. For example, where a
small MS4 operator does not have OSSFs in their MS4 area, the requirement to inspect these
facilities is not applicable to that small MS4 operator.
1. Public Education and Outreach
(a)
The small MS4 operator shall implement a public education and outreach program to
distribute educational materials to the community and conduct equivalent outreach
about the impacts of stormwater discharges on water bodies and the steps that the
public can take to reduce pollutants in stormwater runoff.
(1)
The public education and outreach program shall at a minimum include the
following target audiences, as applicable:
a.
Traditional MS4s and counties shall address the residents being served;
b.
Non-traditional MS4s (other than counties) shall address the community
served by the MS4 as listed below:
(i)
Universities shall target the faculty, other staff, and students;

Page 76

2024 Small MS4 General Permit
Part IV, Section D
Page 36
(ii) Military bases shall target military personnel (and dependents), and
employees (including contractors);
(iii) Prison complexes or other multi-building complexes shall target staff
and contractors;
(iv) Municipal Utility Districts and other special districts shall target
residents served, staff, and contractors; and
(v)
Transportation authorities shall address staff, contractors, and users.
c.
Small MS4 operators shall address additional target audiences within the
small MS4 service area (such as but not limited to, those listed in Table 2)
as listed below:
(i)
Levels 1, 2a, and 2b: No requirement for additional audiences;
(ii) Level 3: A minimum of one additional audience; or
(iii) Level 4: A minimum of two additional audiences.
Table 2: Additional Target Audiences
Additional Target Audiences
Schools, educational organizations, or youth service and youth groups
Businesses, including commercial facilities, home-base and mobile businesses
Institutions or formal organizations such as churches, hospitals, and service
organizations
Developers or construction site operators
Homeowner or neighborhood associations
Industrial facilities
Visitors/tourists
(2)
Small MS4 operators shall target specific pollutant(s) in the permittee’s
education program (such as, but not limited to, those listed in Table 3). Each
small MS4 shall have a minimum of one target pollutant for each target audience
from Part IV.D.1(a)(1).a-c of this permit. Small MS4s may implement more than
one target pollutant where desired or appropriate to address pollutants in
stormwater discharges to the MEP. The target pollutant must be appropriate for
the target audience. The same pollutant may be used for more than one target
audience and the target pollutant(s) may change annually as needed.
Table 3: Pollutants and Sources
Pollutants and Sources
Grass clippings and leaf litter
Fertilizer and pesticides
Litter, trash containment, balloon releases

Page 77

2024 Small MS4 General Permit
Part IV, Section D
Page 37
Pollutants and Sources
Dumping of solid waste
Illegal disposal of household hazardous waste
Pet waste
Failing septic systems
Swimming pool discharge, including saltwater pools
De-icing/rock salt usage/ storage
Oil, grease, fluids from vehicles
Sediment runoff from construction activities
Unauthorized discharge of restaurant waste
Vehicle washing
Washwater/grey water
(3)
Small MS4 operators must use appropriate educational resources as BMPs
(materials, events, activities, etc.) in conjunction with the selected pollutants for
the selected audiences. The message delivered by these BMPs must be applicable
to the target audience and relate to the target pollutant (such as a newsletter
article about updated illegal dumping and discharge ordinances distributed to
auto mechanic businesses or a hazardous household waste disposal flyer when
applying for trash or recycling services). BMPs which are ongoing throughout the
year or permit term may be counted as one annual BMP. Permittees shall explain
how each BMP relates to the target pollutant and target audience. Small MS4
operators may change BMPs during the permit cycle if determined appropriate
through annual reviews and a different BMP may be more effective for the small
MS4’s target pollutant or target audience. Any changes shall be reflected in the
SWMP and explained in the annual report.
a.
If the permittee has a public website, the permittee shall post its SWMP and
the annual reports required under Part V.B.2 or a summary of the annual
report on the permittee’s website.
(i)
The SWMP must be posted no later than 30 days after the NOI or
NOC approval date; and
(ii)
The annual report no later than 30 days after the due date.
b.
Over the permit term, small MS4 operators shall implement a minimum
number of public education and outreach BMPs from Table 4, as follows:
(i)
Level 1: three BMPs;
(ii)
Levels 2a and 2b: four BMPs; or
(iii) Levels 3 and 4: five BMPs.

Page 78

2024 Small MS4 General Permit
Part IV, Section D
Page 38
Table 4: Required Public Education and Outreach BMPs
Activity/BMP
Measurable Goals
Information on the MS4
operator’s website.
Maintain a webpage with current and accurate information
and working links.
•
All links shall be checked, and the page shall be
updated as necessary at a minimum of once
annually.
•
Must be maintained for the full year, each year.
Social media posts, social
media campaign.
Post a minimum of four times each year on a minimum of
one social media platform.
•
The message shall address ways attendees can
minimize or avoid adverse stormwater impacts or
practices to improve the quality of stormwater
runoff.
•
The messages shall be seasonally appropriate.
•
Must make a minimum of one post per quarter and
all quarterly posts must be visible by attendees for
the full year, each year.
Maintain or mark storm
drains and inlets with, “No
Dumping – Drains to Creek”
or a similar message.
Placard, stencil, or paint a minimum of 10% of all known
stormwater inlets in either high-impact areas identified by
the small MS4 operator or impairment watersheds within
the MS4 area each year.
Where all known stormwater inlets have been marked,
inspect, and maintain the markers for a minimum of 15%
of all known stormwater inlets in either high-impact areas
identified by the small MS4 operator or impairment
watersheds within the MS4 area each year.
Media/advertising
campaign/public service
announcements in areas of
high visibility:
Billboard/poster; Bus
shelter/bench;
radio/television/movie
theatre; and kiosks.
Develop topics that address activities or pollutants of
concern.
Advertisement must be active for a minimum of three
weeks each year; or must have an estimated public
exposure for the duration of the advertising campaign that
is equal to twice the population for the small MS4 area
(based on the most recent U.S. Census Bureau decennial
population value for the small MS4 area).
Publish articles in local
newspaper or newsletter,
may be electronic.
Develop article topics that are group specific and address
activities or pollutants of concern at a seasonally
appropriate time.
A minimum of two articles must be published or emailed to
target audience groups each year.

Page 79

2024 Small MS4 General Permit
Part IV, Section D
Page 39
Activity/BMP
Measurable Goals
Fact sheets/brochures/
utility bill inserts/door
hangers.
Develop material topics that are group specific and address
activities or pollutants of concern.
Fact sheets, brochures, bill inserts, door hangers, or
handouts shall be distributed each year for at least 75% of
the intended audience. Develop and implement a tracking
system to estimate what percentage of the intended
audience is reached for determining BMP effectiveness.
Permanent stormwater
related signage.
Place signage in a location where the message is relevant,
and highly visible to target audience.
Signage will count as an annual BMP for the year it was put
in place and for each subsequent year of this permit cycle
as long as each of those years, the permittee inspects and
maintains, as necessary, 100% of the signage once
annually.
Promote, host, or develop
educational meetings,
seminar, or trainings.
Hold, host, or promote a minimum of one event for level 1
and 2 MS4s or two events for level 3 and 4 MS4s annually.
•
The events shall address ways attendees can
minimize or avoid adverse impacts to stormwater
or practices to improve the quality of stormwater
runoff.
•
These events may address different pollutants and
audiences.
Targeted education
campaign via mail, email, or
in person.
Minimum of one campaign annually distributed to at least
75% of the intended audience, or with a specific event
advertised to at least 75% of the intended audience.
Develop and implement a tracking system to estimate what
percentage of the intended audience is reached for
determining BMP effectiveness.
(Examples: Sediment control with small building permit;
leaf litter email during street sweeping season, or
education brochure to all businesses conducting certain
activity)
c.
Small MS4 operators shall create/host or support the public education and
outreach BMP(s) in Part IV.D.1.(a)(3) and Table 4. To be considered
support given to the coordinating groups, the small MS4 operator shall at
minimum conduct at least one of the following or similar:
(i)
Plan, or assist with planning, the distribution of materials;
(ii)
Coordinate volunteers;
(iii) Contribute supplies, materials, tools, or equipment;
(iv) Provide assistance from MS4 staff to distribute the materials; or
(v)
Provide financial support.

Page 80

2024 Small MS4 General Permit
Part IV, Section D
Page 40
d.
Small MS4 operators may partner with other MS4 operators to maximize
the program and cost effectiveness of the required outreach.
2. Public Involvement/Participation
All permittees, except prisons/correctional facilities, shall involve the public, and, at
minimum, comply with any state and local public notice requirements in the planning and
implementation activities related to developing and implementing the SWMP. The small
MS4 operator must create opportunities, or support activities that are coordinated by citizen
groups, for residents and others to become involved with the SWMP. The activities/BMPs
must demonstrate an impact on stormwater runoff by improving water quality.
(a) Over the permit term, small MS4 operators shall implement a minimum number of
public involvement/participation activities and measurable goals from Table 5 as
follows:
(1)
Level 1 small MS4: two BMPs;
(2)
Levels 2a and 2b small MS4: three BMPs; or
(3)
Levels 3 and 4 small MS4: four BMPs.
Table 5: Public Involvement/Participation BMPs
Activity/BMP
Measurable Goals
Stream/lake or watershed
clean-up events;
litter/trash clean-up events
such as Adopt-A-Highway,
Adopt-A-Spot, Adopt-A-
Street, Adopt-A-Stream,
etc.
Host or support at a minimum one event for level 1 and 2 MS4s
or two events for level 3 and 4 MS4s annually.
•
To be considered an event, the land area cleaned must
be a minimum of:
o two acres,
o 400 yards of steam/streambank/riparian area,
or
o two miles of roadside
•
These may be combined (such as one acre of land and
200 yards of stream).
Habitat improvement;
Tree planting; Invasive
Vegetation removal;
Stream restoration.
Host or support at a minimum one event for level 1 and 2 MS4s
or two events for level 3 and 4 MS4s annually.
•
To be considered an event, the project must be a
minimum of 0.5 acres or 25 yards.
•
An event may take place in streams, parks, areas
adjacent to public waterways, or other green space.
•
An event may be a combination of locations and areas.
Volunteer water quality
monitoring such as Texas
Stream Team.
Host or support a minimum one event annually.
To be considered an event, the monitoring must be conducted
at minimum once each year.

Page 81

2024 Small MS4 General Permit
Part IV, Section D
Page 41
Activity/BMP
Measurable Goals
Stormwater related
speaker series.
Provide or support a minimum of one session for level 1 and 2
MS4s or two sessions for level 3 and 4 MS4s each year. These
may be different speakers or audiences.
MS4 area-wide stormwater
survey for input on
program implementation.
Provide or support a minimum of one public survey annually
for input on the program implementation to be distributed to at
least 75% of the intended audience. Develop and implement a
tracking system to estimate what percentage of the intended
audience is reached for determining BMP effectiveness.
Hold events to train
residents, or work a project
for homeowner
associations (HOAs), or
other public groups to
cover stormwater topics
such as: Building rain
barrels; Fertilizer
application training; Rain
garden/bio retention
creation or maintenance;
How to recognize illicit
discharge activities and
communicate observations
to appropriate MS4 staff.
Provide or support at minimum one project or training
annually.
Educational display/booth
at a school, public event, or
similar event to provide
information or displays
that work to improve
public understanding of
issues related to water
quality.
Provide or support one booth or display at minimum annually.
The booth or display must be staffed during the time which the
event is open to the public.
Public meeting for input
on the program
implementation such as a
city council meeting, board
meeting, or stakeholder
meeting.
Host or support a minimum of one meeting annually for input
on the program implementation to be advertised to at least 75%
of the intended audience. Develop and implement a tracking
system to estimate what percentage of the intended audience is
reached for determining BMP effectiveness.
(b)
Small MS4 operators shall create/host or support the public involvement/participation
BMP(s) in Part IV.D.2.(a) and Table 5. To be considered support given to the
coordinating groups the small MS4 operator shall at minimum conduct at least one of
the following or similar:
(1)
Plan, or assist with planning, the event or activity;
(2)
Contribute supplies, materials, tools, or equipment;
(3)
Provide assistance from MS4 staff during the activity;

Page 82

2024 Small MS4 General Permit
Part IV, Section D
Page 42
(4)
Provide assistance with recruiting volunteers for events;
(5)
Make a space available for projects, meetings, or events;
(6)
Advertisement for the events;
(7)
Supply disposal services;
(8)
Arrange land or stream access;
(9)
Provide financial support; or
(10) Provide donations of goods and services such as food.
(c)
Small MS4 operators may partner with other MS4 operators to maximize the program
and cost effectiveness of the required public involvement/participation activities.
3. Illicit Discharge Detection and Elimination (IDDE)
(a)
Program Development
(1)
All permittees shall develop, implement, and enforce a program to investigate,
detect, and eliminate illicit discharges into the small MS4. The program must
include a plan to detect and address non-stormwater discharges, including illegal
dumping to the small MS4.
The Illicit Discharge Detection and Elimination (IDDE) program must include
the following:
a.
A current and accurate MS4 map (see Part IV.D.3.(c)(1));
b.
Methods for informing and training MS4 field staff (see Part IV.D.3.(c)(2));
c.
Methods for facilitating public reporting of illicit discharges and illegal
dumping (see Part IV.D.3.(c)(3));
d.
Procedures for responding to illicit discharge, illegal dumping, and spills
(see Part IV.D.3.(c)(4));
e.
Procedures for tracing the source of an illicit discharge and illegal dumping
(see Part IV. D.3.(c)(5));
f.
Procedures for removing the source of the illicit discharge and illegal
dumping (see Part IV.D.3.(c)(5));
g.
Conduct inspections in response to complaints including follow-up
inspections, and procedures for inspections (see Part IV.D.3.(c)(6));
h.
For Levels 2, 3 and 4, if applicable, procedures to prevent and correct any
leaking on-site sewage disposal systems that discharge into the small MS4;
i.
For Level 4, procedures for identifying priority areas within the small MS4
likely to have illicit discharges and illegal dumping, and a list of all such
areas identified in the small MS4 (see Part IV.D.3.(e)(1));
j.
For Level 4, dry weather field screening to detect illicit discharges and
illegal dumping (see Part IV.D.3.(e)(2)); and
k.
For Level 4, procedures to reduce the discharge of floatables in the small
MS4 (see Part IV.D.3.(e)(3)).

Page 83

2024 Small MS4 General Permit
Part IV, Section D
Page 43
(2)
For non-traditional small MS4s, if illicit connections, illegal dumping, or illicit
discharges are observed related to another operator’s MS4, the permittee shall
notify the other MS4 operator within 48 hours of discovery. If notification to the
other MS4 operator is not practicable, then the permittee shall notify the
appropriate TCEQ Regional Office of the possible illicit connection, illegal
dumping, or illicit discharge.
(3)
If another MS4 operator notifies the permittee of an illegal connection, illegal
dumping, or illicit discharge to the small MS4, then the permittee shall follow the
requirements specified in Part IV.D.3.(c)(5).
(b)
Allowable Non-Stormwater Discharges
Non-stormwater discharges listed in Part II.D do not need to be considered by the
permittee as an illicit discharge requiring elimination unless the permittee or the
TCEQ identifies the discharge as a significant source of pollutants to the small MS4.
(c)
Requirements for All Permittees
All permittees shall meet all the following requirements, including Table 6.
(1)
MS4 Mapping
All permittees shall maintain a current and accurate MS4 map, which must be
located on site and available for review by TCEQ. The MS4 map must show at a
minimum the following information:
a.
The location of all small MS4 outfalls that are operated by the permittee
and that discharge into Waters of the U.S.;
b.
The location and name of all surface waters receiving discharges from the
small MS4 outfalls; and
c.
Priority areas identified under Part IV.D.3.(e)(1), if applicable.
(2)
Education and Training
All permittees shall implement a method for informing or training all the
permittee’s field staff that may come into contact with or otherwise observe an
illicit discharge, illegal dumping, or illicit connection to the small MS4 as part of
their normal job responsibilities. Training program materials and attendance lists
must be maintained onsite and made available for review by the TCEQ.
(3)
Public Reporting of Illicit Discharges and Spills
All permittees shall publicize and facilitate public reporting of illicit discharges,
illegal dumping, or water quality impacts associated with discharges into or from
the small MS4. The permittee shall provide a central contact point to receive
reports; for example, by including a telephone number for complaints and spill
reporting.
(4)
All permittees shall develop and maintain onsite procedures for responding to
illicit discharges, illegal dumping, and spills.
(5)
Source Investigation and Elimination
a.
Minimum Investigation Requirements – Upon becoming aware of an illicit
discharge or illegal dumping, all permittees shall conduct an investigation
to identify and locate the source of such illicit discharge or illegal dumping
as soon as practicable.

Page 84

2024 Small MS4 General Permit
Part IV, Section D
Page 44
(i)
All permittees shall prioritize the investigation of discharges based on
their relative risk of pollution. For example, sanitary sewage may be
considered a high priority discharge.
(ii)
All permittees shall report to the TCEQ immediately upon becoming
aware of the occurrence of any illicit flows believed to be an
immediate threat to human health or the environment.
(iii) All permittees shall track all investigations and document, at a
minimum, the date(s) the illicit discharge or illegal dumping was
observed; the results of the investigation; any follow-up of the
investigation; and the date the investigation was closed.
b.
Identification and Investigation of the Source of the Illicit Discharge –All
permittees shall investigate and document the source of illicit discharges
and illegal dumping where the permittees have jurisdiction to complete
such an investigation. If the source of illicit discharge or illegal dumping
extends outside the permittee’s boundary, all permittees shall notify the
adjacent permitted MS4 operator or the appropriate TCEQ Regional Office.
c.
Corrective Action to Eliminate Illicit Discharge
If and when the source of the illicit discharge or illegal dumping has been
determined, all permittees shall immediately notify the responsible party of
the problem, and shall require the responsible party to perform all
necessary corrective actions to eliminate the illicit discharge and illegal
dumping.
(6)
Inspections – The permittee shall conduct inspections, in response to complaints,
and shall conduct follow-up inspections to ensure that corrective measures have
been implemented by the responsible party.
The permittee shall develop written procedures describing the basis for
conducting inspections in response to complaints and conducting follow-up
inspections.
Table 6: Required IDDE BMPs
Activity/BMP
Measurable Goals
Maintain a current and
accurate MS4 map as
described in Part
IV.D.3.(c)(1).
Review and update, as necessary, at least one time
annually to include features which have been added,
removed, or changed.
Conduct training for all the
permittee’s field staff as
described in Part
IV.D.3.(c)(2).
Training may be conducted
in person or using self-
paced training materials
such as videos or reading
materials.
Conduct a minimum of one training annually for 100% of
MS4 field staff that may come into contact with or
otherwise observe an illicit discharge, illegal dumping, or
illicit connection to the small MS4 as part of their normal
job responsibilities.

Page 85

2024 Small MS4 General Permit
Part IV, Section D
Page 45
Activity/BMP
Measurable Goals
Maintain and publicize a
public reporting method for
the public to report illicit
discharges, illegal dumping,
or water quality impacts
associated with discharges
into or from the small MS4
such as a reporting hotline,
online form, or other similar
mechanism as described in
Part IV.D.3.(c)(3).
Maintain a minimum of one public reporting mechanism
100% of the time during the permit term.
Publicize the public reporting mechanism a minimum of
two times annually in a method designed to reach the
majority of the intended audience. Develop and implement
a tracking system to estimate what percentage of the
intended audience is reached for determining BMP
effectiveness.
In addition, if the MS4 operator has a public website, the
public reporting mechanism must be publicized on the
public website 100% of the time during the permit term.
Develop and maintain
procedures for responding
to illicit discharges, illegal
dumping, and spills as
described in Part
IV.D.3.(c)(4).
Review and update the procedures at least one time
annually to address changes and make improvements to
the established procedures where applicable.
Source investigation and
elimination of illicit
discharges and illegal
dumping as described in
Part IV.D.3.(c)(5).
Respond to 100% of known illicit discharges and illegal
dumping incidents each year to investigate sources (or
some Level 2b MS4s must notify the appropriate agency
with the authority to act).
Respond to 100% of high priority discharges each year,
such as sanitary sewer discharges within 24 hours (or
some Level 2b MS4s must notify the appropriate agency
with the authority to act).
For 100% of known illicit discharges or illegal dumping
incidents where the small MS4 does not have jurisdiction,
notify the adjacent MS4 operator or the applicable TCEQ
regional office each year.
Notify TCEQ immediately of 100% of illicit flows believed
to be an immediate threat to human health or the
environment throughout the permit term.
Corrective action to
eliminate illicit discharges
and illegal dumping as
described in Part
IV.D.3.(c)(5).
For 100% of illicit discharges or illegal dumping where a
source has been determined, notify the responsible party
of the problem within 24 hours.
Require the responsible party to perform all necessary
corrective actions to eliminate the illicit discharge.
Inspection Procedures as
described in Part
IV.D.3.(c)(6).
Review and update the procedures at least one time
annually to address changes and make improvements to
the established procedures where applicable.

Page 86

2024 Small MS4 General Permit
Part IV, Section D
Page 46
Activity/BMP
Measurable Goals
Inspections in response to
complaints as described in
Part IV.D.3.(c)(6).
Conduct inspections in response to 100% of complaints
each year according to the established procedures (or
some Level 2b MS4s must notify the appropriate agency
with the authority to act).
Conduct follow up inspections in 100% of cases each year
where necessary as described in the established
procedures (except for some Level 2b MS4s without the
appropriate authority to act).
(d)
Additional Requirements for Levels 3 and 4 small MS4s
In addition to the requirements described in Parts IV.D.3.(c), permittees who operate
Levels 3 or 4 small MS4s shall meet the following requirements, including those
described in Table 7.
Source Investigation and Elimination
Permittees who operate Levels 3 or 4 small MS4s shall upon being notified that the
discharge has been eliminated, conduct a follow-up investigation or field screening,
consistent with Part IV.D.2.(e)(2), to verify that the discharge has been eliminated.
Follow-up investigations shall be completed within five business days, on average. The
permittee shall document its follow-up investigation. The permittee may seek recovery
and remediation costs from responsible parties consistent with Part IV.C.3, and
require compensation-related costs. Resulting enforcement actions must follow the
procedures for enforcement action in Part IV.C.3 and 6. If the suspected source of the
illicit discharge is authorized under an NPDES/TPDES permit or the discharge is listed
as an authorized non-stormwater discharge, as described in Part II.D, no further action
is required.
Table 7: Additional Required IDDE BMPs for Levels 3 and 4 small MS4s
Activity/BMP
Measurable Goals
Conduct follow-up
investigations or field
screenings when notified
that a discharge has been
eliminated.
Conduct follow-up investigations or field screening in
response to 100% of notifications each year.
Complete the follow-up investigations within five business
days, on average.
(e)
Additional Requirements for Level 4 Small MS4s
In addition to the requirements described in Parts IV.D.3.(c)-(d) above, permittees
who operate Level 4 small MS4s shall meet the following requirements including Table
8:
(1)
Identification of Priority Areas
Permittees who operate Level 4 small MS4s shall identify priority areas likely to
have illicit discharges or illegal dumping, shall document the basis for the

Page 87

2024 Small MS4 General Permit
Part IV, Section D
Page 47
selection of each priority area, and shall create a list of all priority areas
identified. This priority area list must be available for review by the TCEQ.
(2)
Dry Weather Field Screening
By the end of the permit term, permittees who operate Level 4 small MS4s shall
develop and implement a written dry weather field screening program to assist in
detecting and eliminating illicit discharges and illegal dumping to the small MS4.
Dry weather field screening program must consist of (1) field observations; and
(2) field screening as described below.
For dry weather field screening, at a minimum, the permittee shall:
a.
Conduct dry weather field screening in priority areas as identified by the
permittee in Part IV.D.3.(e)(1). By the end of the permit term, all of those
priority areas, although not necessarily all individual outfalls, must be
screened.
b.
Field observation requirements – The permittee shall develop written
procedures for observing flows from outfalls when there has been at least 72
hours of dry weather. The written procedures must include the basis used to
determine which outfalls will be observed. The permittee shall record visual
observations such as odor, color, clarity, floatables, deposits, or stains.
c.
Field screening requirements – The permittee shall develop written
procedures to determine which dry weather flows will be screened, based on
results of field observations or complaint from the public or the permittee’s
trained field staff. At a minimum, when visual observations indicate a
potential problem such as discolored flows, foam, surface sheen, and other
similar indicators of contamination, the permittee shall conduct a field
screening analysis for selected indicator pollutants. The basis for selecting
the indicator pollutants must be described in the written procedures.
Screening methodology may be modified based on experience gained
during the actual field screening activities. The permittee shall document
the method used.
(3)
Reduction of Floatables
The permittee shall implement a program to reduce the discharge of floatables
(for example, litter and other human-generated solid refuse) in the small MS4.
The permittee shall include source controls at a minimum and structural controls
and other appropriate controls where necessary.
The permittee shall maintain two locations where floatable material can be
removed before the stormwater is discharged to or from the small MS4. Floatable
material shall be collected at the frequency necessary for maintenance of the
removal devices, but not less than twice per year. The amount of material
collected shall be estimated by weight, volume, or by other practical means.
Results shall be included in the annual report.

Page 88

2024 Small MS4 General Permit
Part IV, Section D
Page 48
Table 8: Additional Required IDDE BMPs for Level 4 small MS4s
Activity/BMP
Measurable Goals
Identification of priority
areas as described in Part
IV.D.3.(e)(1).
Develop and maintain a list of 100% of the priority areas
identified by the small MS4 operator each year. At a
minimum, small MS4 operators must consider the
following in developing the priority areas:
•
Sanitary sewer lines
•
Industrial areas
•
Commercial areas
•
Areas with history of past illicit discharges or illegal
dumping
Review and update the list at least one time annually to
include new, removed, or changed areas based on the
criteria established by the small MS4 for identifying
priority areas.
Dry weather field screening
as described in Part
IV.D.3.(e)(2).
Develop and implement written procedures to determine
which dry weather flows will be screened, based on results
of field observations or complaint from the public or the
permittee’s trained field staff.
Review and update the procedures at least one time
annually to address changes and make improvements to
the established procedures where applicable.
•
New Level 4 small MS4s shall develop the
procedures within one year of obtaining their
authorization under this general permit.
Develop and implement written procedures for observing
flows from outfalls when there has been at least 72 hours
of dry weather.
Review and update the procedures at least one time
annually to address changes and make improvements to
the established procedures where applicable.
New Level 4 small MS4s shall develop the procedures
within one year of obtaining their authorization under this
general permit. Conduct dry weather field screening in
100% of the priority areas as identified by the permittee in
Part IV.D.2.(e)(1) by the end of the permit term with
interim milestones established for screening each year.

Page 89

2024 Small MS4 General Permit
Part IV, Section D
Page 49
Activity/BMP
Measurable Goals
Floatable Reduction as
described in Part
IVI.D.3.(e)(3).
Develop and implement at least two source controls each
year to address floatables such as, but not limited to,
establishing and maintaining waste collection sites, clean-
up events, and anti-littering campaigns.
Develop and implement at least two structural controls
each year such as, but not limited to, inlet protections,
boom sites, hazardous materials traps, trash racks, outfall
netting, and catch basins.
Annually maintain at least two locations where floatable
material can be removed before the stormwater is
discharged to or from the small MS4. These locations may
be the same as the areas where source controls and
structural controls are implemented.
Floatable material shall be collected at the frequency
necessary for maintenance of the removal devices, but not
less than two times per year.
4. Construction Site Stormwater Runoff Control
(a)
Requirements and Control Measures
All permittees shall develop, implement, and enforce a program requiring operators of
small and large construction activities to select, install, implement, and maintain
stormwater control measures that prevent illicit discharges to the MEP. The program
must include the development and implementation of an ordinance or other regulatory
mechanism, as well as sanctions to ensure compliance to the extent allowable under
state, federal, and local law, to require erosion and sediment control.
If TCEQ waives requirements for stormwater discharges associated with small
construction from a specific site(s), the permittee is not required to enforce the
program to reduce pollutant discharges from such site(s).
(b)
Requirements for All Permittees
All permittees shall meet the following requirements including Table 9.
(1)
All permittees shall require that construction site operators implement
appropriate erosion and sediment control BMPs. The permittee’s construction
program must ensure erosion and sediment controls, soil stabilization, and BMP
requirements are effectively implemented for all small and large construction
activities discharging to its small MS4 consistent with the TPDES CGP,
TXR150000.
(2)
Prohibited Discharges - The following discharges are prohibited:
a.
Wastewater from washout of concrete and wastewater from water well
drilling operations, unless managed by an appropriate control;
b.
Wastewater from washout and cleanout of stucco, paint, from release oils,
and other construction materials;

Page 90

2024 Small MS4 General Permit
Part IV, Section D
Page 50
c.
Fuels, oils, or other pollutants used in vehicle and equipment operation and
maintenance;
d.
Soaps or solvents used in vehicle and equipment washing; and
e.
Discharges from dewatering activities, including discharges from
dewatering of trenches and excavations, unless managed by appropriate
BMPs.
(3)
Construction Plan Review Procedures
To the extent allowable by state, federal, and local law, all permittees shall
maintain and implement site plan review procedures that describe which plans
will be reviewed as well as when an operator may begin construction. For those
permittees without legal authority to enforce site plan reviews, this requirement
is limited to those sites operated by the permittee and its contractors and located
within the permittee’s regulated area. The site plan procedures must meet the
following minimum requirements:
a.
The site plan review procedures must incorporate consideration of potential
water quality impacts.
b.
The permittee may not approve any plans unless the plans contain
appropriate site-specific construction site control measures that, at a
minimum, meet the requirements described in the TPDES CGP,
TXR150000.
The permittee may require and accept a plan, such as a stormwater
pollution prevention plan (SWP3), that has been developed pursuant to the
TPDES CGP, TXR150000.
(4)
Construction Site Inspections and Enforcement
To the extent allowable by state, federal, and local law, all permittees shall
implement procedures for inspecting large and small construction projects.
Permittees without legal authority to inspect construction sites shall at a
minimum conduct inspection of sites operated by the permittee or its contractors
and that are located in the permittee’s regulated area.
a.
The permittee shall conduct inspections based on the evaluation of factors
that are a threat to water quality, such as: soil erosion potential; site slope;
project size and type; sensitivity of receiving water bodies; proximity to
receiving water bodies; non-stormwater discharges; and past record of non-
compliance by the operators of the construction site.
b.
Inspections must occur during the active construction phase.
(i)
All permittees shall develop and implement updated written
procedures outlining the inspection and enforcement requirements.
These procedures must be maintained on-site or in the SWMP and be
made available to TCEQ.
(ii)
Inspections of construction sites must, at a minimum:
1.
Determine whether the site has appropriate coverage under the
TPDES CGP, TXR150000. If no coverage exists, notify the
permittee of the need for permit coverage;

Page 91

2024 Small MS4 General Permit
Part IV, Section D
Page 51
2.
Conduct a site inspection to determine if control measures have
been selected, installed, implemented, and maintained
according to the small MS4’s requirements;
3.
Assess compliance with the permittee’s ordinances and other
regulations; and
4.
Provide a written or electronic inspection report.
c.
Based on site inspection findings, all permittees shall take all necessary
follow-up actions (for example, follow-up-inspections or enforcement) to
ensure compliance with permit requirements and the SWMP. These follow-
up and enforcement actions must be tracked and documentation
maintained for review by the TCEQ.
For non-traditional small MS4s with no enforcement powers, the permittee
shall notify the adjacent MS4 operator with enforcement authority or the
appropriate TCEQ Regional Office.
(5)
Information Submitted By the Public
All permittees shall develop, implement, and maintain procedures for receipt and
consideration of information submitted by the public.
(6)
MS4 Staff Training
All permittees shall ensure that all staff whose primary job duties are related to
implementing the construction stormwater program (including permitting, plan
review, construction site inspections, and enforcement) are informed or trained
to conduct these activities. The training may be conducted by the permittee or by
outside trainers.
Table 9: Required Construction Site Stormwater Runoff Control BMPs
Activity/BMP
Measurable Goals
Develop and maintain an
ordinance or other
regulatory mechanism as
described in Part IV.D.4.(a).
Review and update the ordinance or other regulatory
mechanism at least one time during the permit term to
address changes and make improvements to the ordinance
where applicable.
Prohibit discharges as
described in Part
IV.D.4.(b)(2).
Develop and maintain an ordinance or other regulatory
mechanism to prohibit these discharges.
Review and update the ordinance or other regulatory
mechanism at least one time during the permit term to
address changes and make improvements to the ordinance
where applicable.
Maintain and implement
site plan review procedures
that describe which plans
will be reviewed as well as
when an operator may begin
construction as described in
Part IV.D.4.(b)(3).
Review and update site plan review procedures at least one
time annually to address changes and make improvements
to the established procedures where applicable.
Implement site plan review procedures for 100% of new
construction site plans received each year.

Page 92

2024 Small MS4 General Permit
Part IV, Section D
Page 52
Activity/BMP
Measurable Goals
Implement procedures for
inspecting large and small
construction projects as
described in Part
IV.D.4.(b)(4).
Review and update inspection procedures at least one time
annually to address changes and make improvements to
the established procedures where applicable.
Conduct construction site
inspections as described in
Part IV.D.4.(b)(4).
Conduct inspections at a minimum of 80% of active
construction sites annually according to the established
procedures (or some Level 2b small MS4s must notify the
appropriate agency with the authority to act).
Each year, conduct follow up inspections in 100% of cases
where necessary as described in the established
procedures (except for some Level 2b small MS4s without
the appropriate authority to act).
Develop, implement, and
maintain procedures for
receipt and consideration of
information submitted by
the public as described in
Part IV.D.4.(b)(5).
Review and update procedures for the receipt and
consideration of information submitted by the public at
least one time annually to address changes and make
improvements to the established procedures where
applicable.
Maintain one webpage, hotline, or similar method for
receipt of information submitted by the public throughout
the permit term.
Conduct training for all the
MS4 staff whose primary job
duties are related to
implementing the
construction stormwater
program as described in
Part IV.D.4.(b)(6).
Training may be conducted
in person or using self-
paced training materials
such as videos or reading
materials.
Conduct a minimum of one training annually for 100% of
MS4 staff whose primary job duties are related to
implementing the construction stormwater program.
(c)
Additional Requirements for Levels 3 and 4 small MS4s
In addition to the requirements described in Parts IV.D.4.(b) above, permittees who
operate Levels 3 or 4 small MS4s shall meet the following requirements including
Table 10.
Construction Site Inventory
Permittees who operate Levels 3 or 4 small MS4s shall maintain an inventory of all
TPDES permitted active public and private construction sites in the small MS4 area,
that result in a total land disturbance of one or more acres or that result in a total land
disturbance of less than one acre if part of a larger common plan or development or
sale. Notification to the small MS4 must be made by submittal of a copy of an NOI or a

Page 93

2024 Small MS4 General Permit
Part IV, Section D
Page 53
small construction site notice, as applicable. The permittee shall make this
construction site inventory in the small MS4 area available to the TCEQ upon request
for review.
Table 10: Additional Required Construction Site Stormwater Runoff Control BMPs for
Levels 3 and 4 Small MS4s
Activity/BMP
Measurable Goals
Maintain a Construction
Site inventory as described
in Part IV.D.4.(c).
Maintain an annual inventory of 100% of TPDES
permitted active public and private construction sites in
the small MS4 area, that result in a total land disturbance
of one or more acres or that result in a total land
disturbance of less than one acre if part of a larger
common plan or development or sale.
•
New Levels 3 or 4 small MS4s shall develop the
inventory within one year of obtaining their
authorization under this general permit.
5. Post Construction Stormwater Management in New Development and
Redevelopment
(a)
Post-Construction Stormwater Management Program
All permittees shall meet the requirements below including Table 11.
(1)
All permittees shall develop, implement, and enforce a program, to the extent
allowable under state, federal, and local law, to control stormwater discharges
from new development and redeveloped sites that discharge into the small MS4
that disturb one acre or more, including projects that disturb less than one acre
that are part of a larger common plan of development or sale. The program must
be established for private and public development sites. The program may utilize
an offsite mitigation and payment in lieu of components to address this
requirement.
(2)
All permittees shall use, to the extent allowable under state, federal, and local law
and local development standards, an ordinance or other regulatory mechanism to
address post-construction runoff from new development and redevelopment
projects. The permittees shall establish, implement, and enforce a requirement
that owners or operators of new development and redeveloped sites design,
install, implement, and maintain a combination of structural and non-structural
BMPs appropriate for the community and that protects water quality. If the
construction of permanent structures is not feasible due to space limitations,
health and safety concerns, cost effectiveness, or highway construction codes, the
permittee may propose an alternative approach to TCEQ.
(b)
Requirements for All Permittees
All permittees shall meet all the following requirements including Table 11.
(1)
All permittees shall document and maintain records of enforcement actions and
make them available for review by the TCEQ.

Page 94

2024 Small MS4 General Permit
Part IV, Section D
Page 54
(2)
Long-Term Maintenance of Post-Construction Stormwater Control Measures
All permittees shall, to the extent allowable under state, federal, and local law,
ensure the long-term operation and maintenance of structural stormwater
control measures installed through one or both of the following approaches:
a.
Maintenance performed by the permittee. (See Part IV.D.6)
b.
Maintenance performed by the owner or operator of a new development or
redeveloped site under a maintenance plan. The maintenance plan must be
filed in the real property records of the county in which the property is
located. The permittee shall require the owner or operator of any new
development or redeveloped site to develop and implement a maintenance
plan addressing maintenance requirement for any structural control
measures installed on site. The permittee shall require operation and
maintenance performed is documented and retained on site, such as at the
offices of the owner or operator, and made available for review by the small
MS4.
Table 11: Required Post Construction Stormwater Management in New Development and
Redevelopment BMPs
Activity/BMP
Measurable Goals
Develop and maintain an
ordinance or other
regulatory mechanism as
described in Part
IV.D.5.(a)(2).
Review and update the ordinance or other regulatory
mechanism at least one time during the permit term to
address changes and make improvements to the ordinance
where applicable.
Document and maintain
records of enforcement
actions and make them
available for review by the
TCEQ as described in Part
IV.D.5.(b)(1).
Maintain records of 100% of enforcement actions taken
each year.
Make 100% of enforcement records available to TCEQ for
review within 24 hours of request.
Ensure the long term
operation and maintenance
of structural stormwater
control measures installed
as described in Part
IV.D.5.(b)(2).
Each year, implement a maintenance plan and schedule
established by the small MS4 operator addressing 100% of
stormwater control measures where the small MS4
operator is responsible for maintenance.
Each year, require 100% of the owners or operators of any
new development or redeveloped sites to develop and
implement a maintenance plan addressing maintenance
requirement for any structural control measures installed
on site.
Require the site owner or operators to maintain
documentation, such as a tracking log, onsite of 100% of
the maintenance performed and made available for review
by the small MS4 operator or TCEQ within 24 hours of the
request.

Page 95

2024 Small MS4 General Permit
Part IV, Section D
Page 55
(c)
Additional Requirements for Level 4 small MS4s
In addition to the requirements described in Parts IV.D.5.(b)(1)-(2), permittees who
operate Level 4 small MS4s shall meet the following requirements including Table 12.
(1)
Inspections – Permittees who operate Level 4 small MS4s shall develop and
implement an inspection program to ensure that all post construction stormwater
control measures are operating correctly and are being maintained as required
consistent with its applicable maintenance plan. For small MS4s with limited
enforcement authority, this requirement applies to the structural controls owned
and operated by the small MS4 or its contractors that perform these activities
within the small MS4’s regulated area.
(2)
Inspection Reports – The permittee shall document its inspection findings in an
inspection report and make them available for review by the TCEQ.
Table 12: Additional Required Post Construction Stormwater Management in New
Development and Redevelopment BMPs for Level 4 Small MS4s
Activity/BMP
Measurable Goals
Develop and implement an
inspection program as
described in Part
IV.D.5.(c)(1).
Develop and implement an inspection program to ensure
that of post construction stormwater control measures in
the small MS4 area are operating correctly and are being
maintained as required consistent with its applicable
maintenance plan each year. At a minimum, the small
MS4 operator must inspect 20% of the post construction
stormwater controls in the small MS4 area each year, or
more if required by the MS4 maintenance plan.
For small MS4s with limited enforcement authority, this
requirement applies only to 100% of the structural
controls owned and operated by the small MS4 or its
contractors that perform these activities within the small
MS4’s regulated area each year.
New Level 4 small MS4s shall develop the inspection
program within one year of obtaining their authorization
under this general permit.
Maintain Inspection Reports
as described in Part
IV.D.5.(c)(2).
Document inspection findings in an inspection report for
100% of inspections performed each year.
Make 100% of inspection reports available to TCEQ staff
for review within 24 hours of request.
6. Pollution Prevention and Good Housekeeping for Municipal Operations
(a)
Program Development
All permittees shall develop and implement an operation and maintenance program
(O&M), including an employee training component that has the ultimate goal of
preventing or reducing pollutant runoff from municipal activities and municipally
owned areas including but not limited to: park and open space maintenance; street,
road, or highway maintenance; fleet and building maintenance; stormwater system

Page 96

2024 Small MS4 General Permit
Part IV, Section D
Page 56
maintenance; new construction and land disturbances; municipal parking lots; vehicle
and equipment maintenance and storage yards; waste transfer stations; and salt/sand
storage locations.
(b)
Requirements for All Permittees
All permittees shall meet the requirements described below including Table 13.
(1)
Permittee-owned Facilities and Control Inventory
All permittees shall develop and maintain an inventory of facilities and
stormwater controls that it owns and operates within the regulated area of the
small MS4. The inventory must include all applicable permit numbers,
registration numbers, and authorizations for each facility or controls. The
inventory must be available for review by TCEQ and must include, but is not
limited, to the following, as applicable:
a.
Composting facilities;
b.
Equipment storage and maintenance facilities;
c.
Fuel storage facilities;
d.
Hazardous waste disposal facilities;
e.
Hazardous waste handling and transfer facilities;
f.
Incinerators;
g.
Landfills;
h.
Materials storage yards;
i.
Pesticide storage facilities;
j.
Buildings, including schools, libraries, police stations, fire stations, and
office buildings;
k.
Parking lots;
l.
Golf courses;
m.
Swimming pools;
n.
Public works yards;
o.
Recycling facilities;
p.
Salt storage facilities;
q.
Solid waste handling and transfer facilities;
r.
Street repair and maintenance sites;
s.
Vehicle storage and maintenance yards; and
t.
Structural stormwater controls.
(2)
Training and Education
All permittees shall inform or train appropriate employees involved in
implementing pollution prevention and good housekeeping practices. All
permittees shall maintain a training attendance list for review by TCEQ when
requested.

Page 97

2024 Small MS4 General Permit
Part IV, Section D
Page 57
(3)
Disposal of Waste Material – Waste materials removed from the small MS4 must
be disposed of in accordance with 30 TAC Chapters 330 or 335, as applicable.
(4)
Contractor Requirements and Oversight
a.
Any contractors hired by the permittee to perform maintenance activities
on permittee-owned facilities must be contractually required to comply with
all of the stormwater control measures, good housekeeping practices, and
facility-specific stormwater management operating procedures described in
Parts IV.D.6.(b)(2)-(6).
b.
All permittees shall provide oversight of contractor activities to ensure that
contractors are using appropriate control measures and SOPs. Oversight
procedures must be maintained on-site and made available for inspection
by TCEQ.
(5)
Municipal Operation and Maintenance Activities
a.
Assessment of permittee-owned operations
All permittees shall evaluate operation and maintenance (O&M) activities
for their potential to discharge pollutants in stormwater, including but not
limited to:
(i)
Road and parking lot maintenance, including such areas as pothole
repair, pavement marking, sealing, and re-paving;
(ii)
Bridge maintenance, including such areas as re-chipping, grinding,
and saw cutting;
(iii) Cold weather operations, including plowing, sanding, and application
of deicing and anti-icing compounds and maintenance of snow
disposal areas; and
(iv) Right-of-way maintenance, including mowing, herbicide and pesticide
application, and planting vegetation.
b.
All permittees shall identify pollutants of concern that could be discharged
from the above O&M activities (for example, metals; chlorides;
hydrocarbons such as benzene, toluene, ethyl benzene, and xylenes;
sediment; and trash).
c.
All permittees shall develop and implement a set of pollution prevention
measures that will reduce the discharge of pollutants in stormwater from
the above activities. These pollution prevention measures must include at
least two the following:
(i)
Replacing materials and chemicals with more environmentally
friendly materials or methods;
(ii)
Tracking application of deicing and anti-icing compounds;
(iii) Using suspended tarps, booms, or vacuums to capture paint, solvents,
rust, paint chips and other pollutants generated by regular bridge
maintenance; and
(iv) Placing barriers around or conducting runoff away from deicing
chemical storage areas to prevent discharge into surface waters.

Page 98

2024 Small MS4 General Permit
Part IV, Section D
Page 58
d.
Inspection of pollution prevention measures - All pollution prevention
measures implemented at permittee-owned facilities must be visually
inspected to ensure they are working properly. The permittee shall develop
written procedures that describes frequency of inspections occurring at
least one time annually and how they will be conducted. A log of inspections
must be maintained and made available for review by the TCEQ upon
request.
(6)
Structural Control Maintenance
If BMPs include structural controls, maintenance of the controls must be
performed by the permittee and consistent with maintaining the effectiveness of
the BMP. The permittee shall develop written procedures that define the
frequency of inspections occurring at least one time annually and how they will
be conducted.
Table 13: Required Pollution Prevention and Good Housekeeping for Municipal Operations
BMPs
Activity/BMP
Measurable Goals
Permittee-owned Facilities
and Control Inventory as
described by Part
IV.D.6.(b)(1).
Develop and maintain an annual inventory for 100% of the
small MS4 owned and operated facilities and controls in
the small MS4 area.
Review and update the inventory at least one time
annually to address changes or additions to the facilities
and controls where applicable.
Training and Education as
described in Part
IV.D.6.(b)(2).
Training may be conducted
in person or using self-
paced training materials
such as videos or reading
materials.
Conduct a minimum of one training annually for 100% of
employees involved in implementing pollution prevention
and good housekeeping practices.
For small MS4s which use only contractors to implement
pollution prevention and good housekeeping practices,
ensure training of 100% of applicable contract staff is
conducted at least one time annually using contract
language or another similar method.
Disposal of Waste Material
as described in Part
IV.D.6.(b)(3).
Ensure that 100% of waste from the MS4 is disposed of in
accordance with 30 TAC Chapters 330 or 335, as
applicable each year.

Page 99

2024 Small MS4 General Permit
Part IV, Section D
Page 59
Activity/BMP
Measurable Goals
Contractor Requirements
and Oversight as described
in Part IV.D.6.(b)(4).
Each year, ensure that 100% of contractors hired by the
MS4 to perform maintenance activities on permittee-
owned facilities is contractually required to comply with
all of the stormwater control measures, good
housekeeping practices, and facility-specific stormwater
management operating procedures described in Parts IV
D.6.(b)(2)-(6).
Implement oversight procedures of contractor activities in
100% of contracts to ensure that contractors are using
appropriate control measures and SOPs each year.
Oversight procedures must be maintained on-site 100% of
the time and made available for review by TCEQ within 24
hours of request.
Assessment of permittee-
owned operations as
described in Part
IV.D.6.(b)(5)a.
Evaluate 100% of O&M activities, in conjunction with
procedure reviews if appropriate, for their potential to
discharge pollutants in stormwater annually including but
not limited to:
•
Road and parking lot maintenance, including such
areas as pothole repair, pavement marking, sealing,
and re-paving;
•
Bridge maintenance, including such areas as re-
chipping, grinding, and saw cutting;
•
Cold weather operations, including plowing,
sanding, and application of deicing and anti-icing
compounds and maintenance of snow disposal
areas; and
•
Right-of-way maintenance, including mowing,
herbicide and pesticide application, and planting
vegetation.
Identify pollutants of
concern as described in Part
IV.D.6.(b)(5)b.
Identify pollutants of concern that could be discharged
from all of the O&M activities described in Part
IV.D.6.(b)(5)b and maintain a list of 100% of the
pollutants identified.
Including for example, metals; chlorides; hydrocarbons
such as benzene, toluene, ethyl benzene, and xylenes;
sediment; and trash.
Review and update the pollutants of concern list at least
one time annually to address changes or additions to the
O&M activities where applicable.

Page 100

2024 Small MS4 General Permit
Part IV, Section D
Page 60
Activity/BMP
Measurable Goals
Pollution Prevention
Measures as described in
Part IV.D.6.(b)(5)c.
Develop and implement a set of pollution prevention
measures that will reduce the discharge of pollutants in
stormwater from the permittee-owned operations.
Implement at least two of the following pollution
prevention measures:
•
Replace at least 50% of the MS4’s materials and
chemicals with more environmentally friendly
materials or methods by the end of the permit
term;
•
Track 100% of the application of deicing and anti-
icing compounds in the MS4 area and record the
amount of compound used for each application
annually;
•
Use suspended tarps, booms, or vacuums to
capture paint, solvents, rust, paint chips and other
pollutants during 80% of regular bridge
maintenance each year; and
•
Place barriers around or conduct runoff away from
100% of deicing chemical storage areas to prevent
discharge into surface waters each year.
Inspection of Pollution
Prevention Measures as
described in Part
IV.D.6.(b)(5)d.
At least one time annually, visually inspect 100% of
pollution prevention measures implemented at permittee-
owned facilities to ensure they are working properly.
Develop and maintain written procedures that describe the
frequency of inspections and how they will be conducted.
Review and update the inspection procedures at least one
time annually to address changes or additions to the
pollution prevention measures.
Maintain a log of 100% of the inspections conducted
annually and make the log available for review by the
TCEQ within 24 hours of a request.
Structural Control
Maintenance as described
by Part IV.D.6.(b)(6).
At least one time annually, perform maintenance of 100%
of the structural controls which require maintenance.
Maintenance must follow a plan and schedule developed
by the small MS4 operator to be consistent with
maintaining the effectiveness of the BMP.
The permittee shall develop and maintain written
procedures that define the frequency of inspections and
how they will be conducted.
Review and update the maintenance procedures at least
one time annually to address changes or additions to the
pollution prevention measures.

Page 101

2024 Small MS4 General Permit
Part IV, Section D
Page 61
(c)
Additional Requirements for Levels 3 and 4 small MS4s:
In addition to the requirements described in Part IV.D.6.(b) above, permittees who
operate Levels 3 or 4 small MS4s shall meet the following requirements including
Table 14.
(1)
Storm Sewer System Operation and Maintenance
a.
Permittees who operate Levels 3 or 4 small MS4s shall develop and
implement an O&M program to reduce to the MEP the collection of
pollutants in catch basins and other surface drainage structures.
b.
Permittees who operate Levels 3 or 4 small MS4s shall develop a list of
potential problem areas. The permittees shall identify and prioritize
problem areas for increased inspection (for example, areas with recurrent
illegal dumping).
(2)
Operation and Maintenance Program to Reduce Discharges of Pollutants from
Roads
Permittees who operate Levels 3 or 4 small MS4s shall implement an O&M
program that includes at least one of the following: a street sweeping and
cleaning program, or an equivalent BMP such as an inlet protection program,
which must include an implementation schedule and a waste disposal procedure.
The basis for the decision must be included in the SWMP. If a street sweeping
and cleaning program is implemented, the permittee shall evaluate the following
permittee-owned and operated areas for the program: streets, road segments,
and public parking lots including, but not limited to, high traffic zones,
commercial and industrial districts, sport and event venues, and plazas, as well as
areas that consistently accumulate high volumes of trash, debris, and other
stormwater pollutants.
a.
Implementation schedules – If a sweeping program is implemented, the
permittee shall sweep the areas in the program (for example, the streets,
roads, and public parking lots) in accordance with a frequency and schedule
determined in the permittee’s O&M program to address at a minimum 75%
of the areas in the program annually.
b.
For areas where street sweeping is technically infeasible (for example,
streets without curbs), the permittee shall focus implementation of other
trash and litter control procedures, or provide inlet protection measures to
minimize pollutant discharges to storm drains and creeks.
c.
Sweeper Waste Material Disposal – If utilizing street sweepers, the
permittee shall develop a procedure to dewater and dispose of street
sweeper waste material and shall ensure that water and material will not
reenter the small MS4.
(3)
Mapping of Facilities
Permittees who operate Levels 3 or 4 small MS4s shall, on a map of the area
regulated under this general permit, identify where the permittee-owned and
operated facilities and stormwater controls are located.

Page 102

2024 Small MS4 General Permit
Part IV, Section D
Page 62
(4)
Facility Assessment
Permittees who operate Levels 3 or 4 small MS4s shall perform the following
facility assessment in the regulated portion of the small MS4 operated by the
permittee:
a.
Assessment of Facilities’ Pollutant Discharge Potential – The permittee
shall review the facilities identified in Part IV.D.6.(b)(1) once per permit
term for their potential to discharge pollutants into stormwater.
b.
Identification of high priority facilities – Based on the assessment above,
the permittee shall identify as high priority those facilities that have a high
potential to generate stormwater pollutants and shall develop and maintain
a list of these facilities. Among the factors that must be considered in giving
a facility a high priority ranking are the amount of urban pollutants stored
at the site, the identification of improperly stored materials, activities that
must not be performed outside (for example, changing automotive fluids,
vehicle washing), proximity to water bodies, proximity to sensitive aquifer
recharge features, poor housekeeping practices, and discharge of POCs to
impaired water(s). High priority facilities must include, at a minimum, the
permittee’s maintenance yards, hazardous waste facilities, fuel storage
locations, and any other facilities at which chemicals or other materials
have a high potential to be discharged in stormwater.
c.
Documentation of Assessment Results – The permittee shall document the
results of the assessments and maintain copies of all site evaluation
checklists used to conduct the assessments. The documentation must
include the results of the permittee’s initial assessment, and any identified
deficiencies and corrective actions taken.
(5)
Development of Facility-Specific Procedures
Permittees who operate Levels 3 or 4 small MS4s shall develop facility-specific
stormwater management SOPs. The permittee may utilize existing plans or
documents that may contain the following required information:
a.
For each high priority facility identified in Part IV.D.6.(c)(4)b, the permittee
shall develop a SOP that identifies BMPs to be installed, implemented, and
maintained to minimize the discharge of pollutants in stormwater from
each facility.
b.
A hard or electronic copy of the facility-specific stormwater management
SOP (or equivalent existing plan or document) must be maintained and be
available for review by the TCEQ. The SOP must be kept onsite when
possible and must be kept up-to-date.
(6)
Stormwater Controls for High Priority Facilities
Permittees who operate Levels 3 or 4 small MS4s shall implement the following
stormwater controls at all high priority facilities identified in Part IV.D.6.(c)(4)b.
A description of BMPs developed to comply with this requirement must be
included in each facility specific SOP:
a.
General good housekeeping – Material with a potential to contribute to
stormwater pollution must be sheltered from exposure to stormwater.
b.
De-icing and anti-icing material storage – The permittee shall ensure, to the
MEP, that stormwater runoff from storage piles of salt and other de-icing

Page 103

2024 Small MS4 General Permit
Part IV, Section D
Page 63
and anti-icing materials is not discharged; or shall ensure that any
discharges from the piles are authorized under a separate discharge permit.
c.
Fueling operations and vehicle maintenance – The permittee shall develop
SOPs (or equivalent existing plans or documents) that address spill
prevention and spill control at permittee-owned and operated vehicle
fueling, vehicle maintenance, and bulk fuel delivery facilities.
d.
Equipment and vehicle washing – The permittee shall develop SOPs that
address equipment and vehicle washing activities at permittee-owned and
operated facilities. The discharge of equipment and vehicle wash water to
the small MS4 or directly to receiving waters from permittee-owned
facilities is not authorized under this general permit. To ensure that
wastewater is not discharged under this general permit, the permittee’s SOP
may include installing a vehicle wash reclaim system, capturing and hauling
the wastewater for proper disposal, connecting to sanitary sewer (where
applicable and approved by local authorities), ceasing the washing activity,
or applying for and obtaining a separate TPDES permit.
(7)
Inspections
Permittees who operate Levels 3 or 4 small MS4s shall develop and implement an
inspection program, which at a minimum must include periodic inspections of
high priority permittee-owned facilities. The results of the inspections and
observations must be documented and available for review by the TCEQ.
Table 14: Additional Required Pollution Prevention and Good Housekeeping for Municipal
Operations BMPs for Levels 3 and 4 Small MS4s:
Activity/BMP
Measurable Goals
Storm Sewer System
Operation and Maintenance
Program as described by
Part IV.D.6.(c)(1)a.
Develop and implement an O&M program to reduce to the
MEP the collection of pollutants in catch basins and other
surface drainage structures each year. Implement at least
two of the following:
•
Inspect at least 25% of the small MS4 owned and
operated detention basins each year.
•
Inspect at least 20% of the small MS4 owned and
operated stormwater inlets in problem areas
identified by the small MS4 operator (for example,
areas with recurrent illegal dumping) each year.
•
Inspect and clean at least 20% of the small MS4
owned and operated surface drainage system in
problem areas identified by the small MS4 operator
(for example, areas with recurrent illegal dumping)
each year.
•
Collect and dispose of or recycle used oil and other
household hazardous waste (HHW) from the
public in at least three events each year. An event is
any day in which the public has an opportunity to
dispose of or recycle HHW either through
collection or drop off

Page 104

2024 Small MS4 General Permit
Part IV, Section D
Page 64
Activity/BMP
Measurable Goals
Storm Sewer System
Operation and Maintenance
Problem Areas as described
by Part IV.D.6.(c)(1)b.
Develop a list of 100% of the identified potential problem
areas. Identify and prioritize problem areas for increased
inspection (for example, areas with recurrent illegal
dumping). Review and update the list of potential problem
areas at least one time annually to address changes or
additions to the list.
Operation and Maintenance
Program to Reduce
Discharges of Pollutants
from Roads as described by
Part IV.D.6.(c)(2).
Implement the following:
•
A street sweeping and cleaning program to address
75% of the MS4 area where street sweeping is
technically feasible annually.
o Ensure 100% of the MS4 area where street
sweeping is technically feasible is addressed
at least two times by the end of the permit
term.
•
One or a combination of the following non-street
sweeping controls:
o an inlet protection program addressing
100% of the small MS4 area where street
sweeping is technically infeasible by the end
of the permit term, which must include an
implementation schedule and a waste
disposal procedure, or
o Ensure that trash receptacles, or similar
trash capturing devices are provided and
maintained in 100% of the areas identified
as high trash generating areas within the
areas where street sweeping is technically
infeasible (such as areas near parks, event
spaces, etc.).
Mapping of Facilities as
described by Part
IV.D.6.(c)(3).
On a map of the area regulated under this general permit,
identify where 100% of the permittee-owned and operated
facilities and stormwater controls are located.
Review and update the map at least one time annually to
address changes or additions to the facilities and controls.
Assessment of Facilities’
Pollutant Discharge
Potential as described by
Part IV.D.6.(c)(4)a.
Review 100% of the facilities identified in Part IV.D.6.(b)
at least one time per permit term for their potential to
discharge pollutants into stormwater.

Page 105

2024 Small MS4 General Permit
Part IV, Section D
Page 65
Activity/BMP
Measurable Goals
Identification of high
priority facilities as
described by Part
IV.D.6.(c)(4)b.
Based on the assessment in Part IV.D.6.(c)(4)a., the
permittee shall identify as high priority those facilities
that have a high potential to generate stormwater
pollutants. A list of 100% of the identified facilities must
be developed and maintained each year.
Review and update the list of high priority facilities at least
one time annually to address changes or additions to the
facilities.
Documentation of
Assessment Results as
described by Part
IV.D.6.(c)(4)c.
Document the results of all the assessments and maintain
copies of 100% of the site evaluation checklists used to
conduct the assessments each year.
The documentation must include:
•
the results of the permittee’s initial assessment, and
any identified deficiencies and corrective actions taken.
Development of Facility-
Specific SOPs as described
by Part IV.D.6.(c)(5).
Develop facility-specific stormwater management SOPs for
100% of the MS4 owned and operated facilities. A
description of 100% of the BMPs developed to comply with
Part IV.D.6.(c)(6) must be included in each facility-specific
SOP.
Review and update the facility-specific SOPs at least one
time annually to address changes or additions to the
facilities.
If requested, SOPs must be made available to TCEQ within
24 hours of the request for review.
Stormwater Controls for
High Priority Facilities,
General Good Housekeeping
as described by Part
IV.D.6.(c)(6)a.
Shelter from exposure to stormwater 100% of material
with a potential to contribute to stormwater pollution
(such as, fertilizers, solvents, paints, cleaners, automotive
products, etc.) each year.
Stormwater Controls for
High Priority Facilities, De-
icing and anti-icing material
storage as described by Part
IV.D.6.(c)(6)b.
Implement one or a combination of the following:
Ensure that 100% of stormwater runoff from storage piles
of salt and other de-icing and anti-icing materials is not
discharged each year.
Or ensure that 100% of discharges from the piles are
authorized under a separate discharge permit each year.
Stormwater Controls for
High Priority Facilities,
Fueling and vehicle
maintenance as described by
Part IV.D.6.(c)(6)c.
Develop and implement SOPs that address spill prevention
and spill control at 100% of permittee-owned and operated
vehicle fueling, vehicle maintenance, and bulk fuel delivery
facilities each year.
Review and update the facility specific SOPs at least one
time annually to address changes or additions to the
facilities.

Page 106

2024 Small MS4 General Permit
Part IV, Section D
Page 66
Activity/BMP
Measurable Goals
Stormwater Controls for
High Priority Facilities,
Equipment and vehicle
washing as described by
Part IV.D.6.(c)(6)d.
Develop and implement SOPs that address equipment and
vehicle washing activities at 100% of the permittee-owned
and operated facilities where washing occurs.
To ensure that wastewater is not discharged under this
general permit, the permittee’s SOP must include one or
more of the following:
•
installing a vehicle wash reclaim system,
•
capturing and hauling the wastewater for proper
disposal,
•
connecting to sanitary sewer (where applicable
and approved by local authorities),
•
ceasing the washing activity, or
•
applying for and obtaining a separate TPDES
permit.
Review and update the facility specific SOPs at least one
time annually to address changes or additions to the
facilities.
Inspections as described by
Part IV.D.6.(c)(7).
Develop and implement an inspection program, which at a
minimum must include inspections of 100% of high
priority permittee-owned facilities one time per year.
The results of 100% of the inspections and observations
must be documented and available for review by the TCEQ
each year.
(d)
Additional Requirements for Level 4 small MS4s:
In addition to all the requirements described in Parts IV.D.6.(b)-(c) above, permittees
who operate Level 4 small MS4s shall meet the following requirements including Table
15.
(1)
Pesticide, Herbicide, and Fertilizer Application and Management
a.
Landscape maintenance – The permittee shall evaluate the materials used
and activities performed on public spaces owned and operated by the
permittee such as parks, schools, golf courses, easements, public rights of
way, and other open spaces for pollution prevention opportunities.
Maintenance activities for the turf landscaped portions of these areas may
include mowing, fertilization, pesticide application, and irrigation. Typical
pollutants include sediment, nutrients, hydrocarbons, pesticides,
herbicides, and organic debris.
b.
The permittee shall implement the following practices to minimize
landscaping-related pollutant generation with regard to public spaces
owned and operated by the permittee:

Page 107

2024 Small MS4 General Permit
Part IV, Section D
Page 67
(i)
Educational activities, permits, certifications, and other measures for
the permittee’s applicators and distributors;
(ii)
Pest management measures that encourage non-chemical solutions
where feasible. Examples may include:
(a)
Use of native plants or xeriscaping;
(b)
Keeping clippings and leaves out the small MS4 and the street by
implementing mulching, composting, or landfilling;
(c)
Limiting application of pesticides and fertilizers if precipitation
is forecasted within 24 hours, or as specified in label
instructions; and
(d)
Reducing mowing of grass to allow for greater pollutant removal,
but not jeopardizing motorist safety.
c.
The permittee shall develop schedules for chemical application in public
spaces owned and operated by the permittee that minimize the discharge of
pollutants from the application due to irrigation and expected precipitation;
and
d.
The permittee shall ensure collection and proper disposal of the permittee’s
unused pesticides, herbicides, and fertilizers.
(2)
Evaluation of Flood Control Projects
The permittee shall assess the impacts of the receiving water(s) for all flood
control projects. New flood control structures must be designed, constructed, and
maintained to provide erosion prevention and pollutant removal from
stormwater. The retrofitting of existing structural flood control devices to provide
additional pollutant removal from stormwater shall be implemented to the MEP.
Table 15: Additional Required Pollution Prevention and Good Housekeeping for Municipal
Operations BMPs for Level 4 Small MS4s:
Activity/BMP
Measurable Goals
Pesticide, Herbicide, and
Fertilizer applicator and
distributor measures as
described by Part
IV.D.6.(d)(1)b.(i).
Require 100% of pesticide, herbicide, and fertilizer
applicators and distributors working in the public spaces
owned and operated by the permittee, including contract
workers, to demonstrate at least one of the following each
year:
•
Training in application or distribution
•
Permit to apply or distribute
•
Certification for application or distribution

Page 108

2024 Small MS4 General Permit
Part IV, Section D
Page 68
Activity/BMP
Measurable Goals
Landscape maintenance as
described by Part
IV.D.6.(d)(1)a.
Evaluate at least one time each year the materials used,
and activities performed on 100% of the public spaces
owned and operated by the permittee for pollution
prevention opportunities such as:
•
parks,
•
schools,
•
golf courses,
•
easements,
•
public rights of way, and
•
other open spaces.
Non-chemical solutions as
described by Part
IV.D.6.(d)(1)b.(ii).
Utilize at least one of the following non-chemical solutions
each year in 100% of the public spaces owned and
operated by the permittee:
•
Use of native plants or xeriscaping in 10% of each
public space’s landscaping area;
•
Keep clippings and leaves out the small MS4 and
the street by implementing mulching, composting,
or landfilling;
•
Limit application of pesticides and fertilizers if
precipitation is forecasted within 24 hours, or as
specified in label instructions; or
•
Reduce mowing of grass frequency to allow for
greater pollutant removal, but not jeopardizing
motorist safety.
If it is not feasible for the small MS4 operator to
implement at least one of these measures in one or more
public spaces owned and operated by the permittee,
written documentation of the reason must be maintained
and made available to the TCEQ upon request.
Schedules for chemical
application as described by
Part IV.D.6.(d)(1)c.
Develop and implement chemical application schedules
for use in 100% of applicable public spaces owned and
operated by the permittee each year. Schedules must
minimize the discharge of pollutants from the chemical
application due to irrigation and expected precipitation.
Collection and disposal of
pesticides, herbicides, and
fertilizers as described by
Part IV.D.6.(d)(1)d.
Ensure collection and proper disposal of 100% of the
permittee’s unusable pesticides, herbicides, and fertilizers
each year.

Page 109

2024 Small MS4 General Permit
Part IV, Section D
Page 69
Activity/BMP
Measurable Goals
Evaluation of Flood Control
Projects as described by Part
IV.D.6.(d)(2).
Assess the impacts of the receiving water(s) for 100% of
the flood control projects each year.
100% of new flood control structures must be designed,
constructed, and maintained to provide erosion prevention
and pollutant removal from stormwater.
The retrofitting of 20% of the existing structural flood
control devices each year to provide additional pollutant
removal from stormwater shall be implemented unless
infeasible.
•
If it is not feasible for the small MS4 operator to
retrofit 20% of the existing control devices each
year, written documentation of the reason must be
maintained and made available to the TCEQ for
review upon request.
7. Industrial Stormwater Sources
Permittees operating a Level 4 small MS4 shall meet the requirements below including Table
16.
(a)
Permittees who operate Level 4 small MS4s shall identify and control pollutants in
stormwater discharges to the small MS4 from the permittee’s landfills; other
treatment, storage, or disposal facilities for municipal waste (for example, transfer
stations and incinerators); hazardous waste treatment, storage, disposal and recovery
facilities and facilities that are subject to Emergency Planning and Community Right-
to-Know Act (EPCRA) Title III, Section 313; and any other industrial or commercial
discharge the permittee determines are contributing a substantial pollutant loading to
the small MS4.
(b)
The program must include priorities and procedures for inspections and for
implementing control measures for such industrial discharges.
Table 16: Required Industrial Stormwater Sources BMPs for Level 4 Small MS4s
Activity/BMP
Measurable Goals
Industrial facilities as
described by Part IV.D.7.(a).
Identify and control pollutants in stormwater discharges
to the small MS4 from 100% of the permittee’s landfills;
other treatment, storage, or disposal facilities for
municipal waste (for example, transfer stations and
incinerators); hazardous waste treatment, storage,
disposal and recovery facilities and facilities that are
subject to Emergency Planning and Community Right-to-
Know Act (EPCRA) Title III, Section 313; and any other
industrial or commercial discharge the permittee
determines are contributing a substantial pollutant
loading to the small MS4.

Page 110

2024 Small MS4 General Permit
Part IV, Section D
Page 70
Activity/BMP
Measurable Goals
Inspections as described by
Part IV.D.7.(b).
Inspect 100% of small MS4 owned and operated facilities
described by Part IV.D.7.(a) at least one time annually.
Inspect 100% of industrial facilities permitted under the
TPDES MSGP, TXR050000, and located within the small
MS4 area at least one time annually.
Priorities and Procedures as
described by Part IV.D.7.(b).
Develop and implement SOPs for 100% of inspections of
facilities as described by Part IV.D.7.(b) and industrial
facilities permitted under the TPDES MSGP, TXR050000,
and within the small MS4 area.
Review and update the facility inspection SOPs at least one
time annually to address changes or additions.
8. Authorization for Construction Activities where the Small MS4 is the Site
Operator
The development of this MCM for construction activities, where the small MS4 is the
construction site operator, is optional and provides an alternative to the MS4 operator
seeking coverage under TPDES CGP, TXR150000, for each construction activity. Permittees
that choose to develop and implement this MCM will be authorized to discharge stormwater
and certain non-stormwater from construction activities only where the MS4 operator meets
the definition of a construction site operator. This MCM only authorizes the small MS4
operator and does not provide authorization for other construction site operators at a
municipal project.
When developing this measure, permittees are required to meet all requirements of, and be
consistent with the following: (1) applicable effluent limitation guidelines for the
Construction and Development industry (40 CFR Part 450), (2) TPDES CGP TXR150000,
(3) Part IV.D.4 and Part VII of this general permit.
The authorization to discharge under this MCM is limited to the small MS4’s regulated area,
such as the portion of the small MS4 located within an urban area with a population of at
least 50,000 people or the area designated by TCEQ as requiring coverage. However, an
MS4 operator may also utilize this MCM over additional portions of their small MS4 that are
also in compliance with all of the MCMs listed in this general permit.
This MCM must be developed as a part of the SWMP. If this MCM is developed after
submitting the initial NOI, an NOC must be submitted notifying the executive director of
this change, and identifying the geographical area or boundary where the activities will be
conducted under the provisions of this general permit.
Utilization of this MCM does not preclude a small MS4 from obtaining coverage under the
TPDES CGP, TXR150000, or under a TPDES individual permit.
Controls required under this MCM must be implemented prior to discharge from a
municipal construction site into surface water in the state.
The MCM must include:
(a) A description of how construction activities will generally be conducted by the
permittee taking into consideration local conditions of weather, soils, and other site-
specific considerations;

Page 111

2024 Small MS4 General Permit
Part V, Section A & B
Page 71
(b)
A description of the area that this MCM will address and where the permittee’s
construction activities are covered (for example within the boundary of the urban area
with a population of at least 50,000 people, the corporate boundary, a special district
boundary, an extra territorial jurisdiction, or other similar jurisdictional boundary);
(c)
Either a description of how the permittee will supervise or maintain oversight over
contractor activities to ensure that the SWP3 requirements are properly implemented
at the construction site; or how the permittee will make certain that contractors have a
separate authorization for stormwater discharges;
(d)
A general description of how a SWP3 will be developed for each construction site,
according to Part VII of this general permit; and
(e)
Records of municipal construction activities authorized under this optional MCM, in
accordance with Part VII of this general permit.
Part V.
Recordkeeping and Reporting
Section A. Recordkeeping
1. The permittee shall retain all records, a copy of this TPDES general permit (maintained
physically or electronically), and records of all data used to complete the application (NOI)
for this general permit, for a period of at least three years, or for the remainder of the term of
this general permit, whichever is longer. This period may be extended by request of the
executive director at any time.
2. The permittee shall submit the records to the executive director only when specifically asked
to do so. The SWMP required by this general permit must be retained at a location accessible
to the TCEQ for review upon request.
3. The permittee shall make the NOI and the SWMP available to the public at reasonable times
during regular business hours, if requested to do so in writing. Copies of the SWMP must be
made available within ten working days of receipt of a written request. Other records must
be provided in accordance with the Texas Public Information Act. However, all requests for
records from federal facilities must be made in accordance with the Freedom of Information
Act.
4. The period during which records are required to be kept shall be automatically extended to
the date of the final disposition of any administrative or judicial enforcement action that
may be instituted against the permittee.
Section B. Reporting
1. General Reporting Requirements
(a)
Noncompliance Notification
According to 30 TAC § 305.125(9), any noncompliance which may endanger human
health or safety, or the environment, must be reported by the permittee to the TCEQ.
Report of such information must be provided orally or by fax to the TCEQ Regional
Office within 24 hours of becoming aware of the noncompliance. A written report must
be provided by the permittee to the appropriate TCEQ Regional Office and to the TCEQ
Enforcement Division (MC-224) within five working days of becoming aware of the
noncompliance. The written report must contain:

Page 112

2024 Small MS4 General Permit
Part V, Section B
Page 72
(1)
A description of the noncompliance and its cause;
(2)
The potential danger to human health or safety, or the environment;
(3)
The period of noncompliance, including exact dates and times;
(4)
If the noncompliance has not been corrected, the anticipated time it is expected
to continue; and
(5)
Steps taken or planned to reduce, eliminate, and prevent recurrence of the
noncompliance, and to mitigate its adverse effects.
(b)
Other Information
When the permittee becomes aware that it either submitted incorrect information or
failed to submit complete and accurate information requested in an NOI, NOT, NOC,
Option 1 Waiver, Option 2 Waiver, or any other report, the permittee shall promptly
submit the facts or information to the executive director.
2. Annual Report
The small MS4 operator shall submit a concise annual report to the executive director by
March 31st of each year for the previous calendar year.
The first annual report for this general permit shall address the period beginning on the day
that authorization is obtained and ending on December 31 of that same year.
The small MS4 operator shall make a copy of the annual report readily available for review
by TCEQ personnel upon request.
The annual report must include:
(a) The status of the compliance with permit conditions, an assessment of the
appropriateness of the identified activities/BMPs, progress towards achieving the
statutory goal of reducing the discharge of pollutants to the MEP, the measurable goals
for each of the MCMs, and an evaluation of the success of the implementation of the
measurable goals;
(b)
A summary of the results of information collected and analyzed, during the reporting
period, including monitoring data used to assess the success of the program at
reducing the discharge of pollutants to the MEP;
(c)
If applicable for receiving water bodies, a summary of any activities taken to address
the discharge to impaired water bodies, including a summary of the small MS4s BMPs
used to address the pollutant of concern, and if sampling was conducted include the
sampling results;
(d)
A summary of the stormwater activities the small MS4 operator plans to undertake
during the next reporting year;
(e)
Proposed changes to the SWMP, including changes to any activities/BMPs or any
identified measurable goals that apply to the program elements;
(f)
A description and schedule for implementation of additional activities/BMP’s that may
be necessary, based on monitoring results, to ensure compliance with applicable
TMDLs and implementation plans. For water bodies that are listed as impaired after
discharge authorization pursuant to Part III., include a list of such water bodies and
the pollutant(s) causing the impairment, and a summary of any actions taken to
comply with the requirements of Part III.;

Page 113

Small MS4 General Permit
Part VI
Page 73
(g)
Notice that the small MS4 operator is relying on another government entity to satisfy
some of its permit obligations (if applicable);
(h)
The number of construction activities where the small MS4 is the operator and
authorized under the optional 8th MCM, including the total number of acres disturbed;
and
(i)
The number of construction activities that occurred within the jurisdictional area of the
small MS4 (as noticed to the permittee by the construction operator), and that were
not authorized under the optional 8th MCM.
Small MS4s authorized under the 2019 TPDES Small MS4 General Permit must prepare an
annual report whether or not the NOI has been approved by the TCEQ. If the permittee has
either not implemented the SWMP or not begun to implement the SWMP because it has not
received approval of the NOI, then the annual report may include that information.
The annual report must be signed (in accordance with 30 TAC § 305.128 relating to
Signatories to Reports) and submitted using the online electronic reporting system, NeT -
MS4, available through the TCEQ website unless the permittee requests and obtains an
Electronic Reporting Waiver.
If the permittee obtains an Electronic Reporting Waiver, the annual report must be
submitted with the appropriate paper annual report forms provided by the executive
director and submitted to the following locations:
•
Original – TCEQ Austin Headquarters Office c/o the Stormwater Team (MC-148),
and
•
Copy – The TCEQ Regional Office that serves the area of the regulated small MS4.
If permittees share a common SWMP (i.e., coalitions), they shall contribute to a single
system-wide annual report for all participating members and the designated coalition
participant shall submit the annual report. At a minimum, each permittee shall sign and
certify the annual report in the NeT-MS4 electronic system in accordance with 30 TAC §
305.128 (relating to Signatories to Reports). If the coalition participant designated to submit
the annual report changes during the permit term, all participating members must submit
an NOC to update the designated member.
Part VI.
Standard Permit Conditions
A. The permittee has a duty to comply with all permit conditions. Failure to comply with any
permit condition is a violation of the general permit and statutes under which it was
issued, and is grounds for enforcement action, for terminating coverage under this general
permit, or for requiring a discharger to apply for and obtain a TPDES individual permit.
B. It shall not be a defense for the permittee in an enforcement action that it would have been
necessary to halt or reduce the permitted activity in order to maintain compliance with the
conditions of this permit.
C. The permittee shall take all reasonable steps to minimize or prevent any discharge in
violation of this permit which has a reasonable likelihood of adversely affecting human
health or the environment.

Page 114

Small MS4 General Permit
Part VI
Page 74
D. Authorization under this general permit may be suspended or revoked for cause. Filing a
notice of planned changes or anticipated non-compliance by the permittee does not stay
any permit condition. The permittee shall furnish to the executive director, upon request
and within a reasonable timeframe, any information necessary for the executive director to
determine whether cause exists for modifying, revoking, suspending, reissuing, or
terminating authorization under this general permit. Additionally, the permittee shall
provide to the executive director, upon request, copies of all records that the permittee
shall maintain as a condition of this general permit.
E. The permittee shall, at all times, properly operate and maintain all facilities and systems of
treatment and control (and related appurtenances) which are installed or used to achieve
compliance with the conditions of this permit and with the condition of the permittee’s
SWMP. Proper O&M also includes adequate laboratory controls and appropriate quality
assurance procedures. Proper O&M requires the operation of backup or auxiliary facilities
or similar systems, installed only when the operation is necessary to achieve compliance
with the conditions of this permit.
F. Inspection and entry shall be allowed under the TWC Chapters 26-28, Health and Safety
Code §§ 361.032-361.033 and 361.037, and 40 CFR § 122.41(i). The statement in TWC §
26.014 that commission entry of a facility shall occur according to an establishment's rules
and regulations concerning safety, internal security, and fire protection is not grounds for
denial or restriction of entry to any part of the facility or site, but merely describes the
commission's duty to observe appropriate rules and regulations during an inspection.
G. The discharger is subject to administrative, civil, and criminal penalties, as applicable,
under the TWC, Chapters 26 - 28, and the Texas Health and Safety Code, Chapter 361 for
violations including but not limited to the following:
1.
Negligently or knowingly violating CWA §§ 301, 302, 303, 306, 307, 308, 318, or
405, or any condition or limitation implementing any sections in a permit issued
under CWA § 402; and
2.
Knowingly making any false statement, representation, or certification in any record
or other document submitted or required to be maintained under a permit, including
monitoring reports or reports of compliance or noncompliance.
H. All reports and other information requested by or submitted to the executive director must
be signed by the person and in the manner required by 30 TAC § 305.128 (relating to
Signatories to Reports).
I. Authorization under this general permit does not convey property or water rights of any
sort and does not grant any exclusive privilege.
J. Nothing in Part II of the general permit is intended to negate any person’s ability to assert
the force majeure (act of God, war, strike, riot, or other catastrophe) defenses found in 30
TAC § 70.7.
K. This permit does not transfer liability for the act of discharging without, or in violation of,
a NPDES or a TPDES permit from the operator of the discharge to the permittee(s).

Page 115

2024 Small MS4 General Permit
Part VII, Section A & B
Page 75
Part VII.
Authorization for Municipal Construction Activities – Applicable only
if the Optional 8th MCM is Selected
The small MS4 operator may obtain authorization under TPDES CGP, TXR150000, to discharge
stormwater runoff from each construction activity performed by the small MS4 operator that
results in a land disturbance of one acre or more of land or less than one acre of land, if the
construction activity is part of a larger common plan of development or sale that would disturb
one acre or more. Alternatively, the small MS4 operator may develop the SWMP to include the
optional 8th MCM listed in Part IV.D.8 of this general permit if the eligibility requirements in
Part VII.A. below are met.
Even if a small MS4 operator has developed the optional 8th MCM, the small MS4 operator may
apply under TPDES CGP, TXR150000, for authorization for certain municipal construction
activities including those activities that occur during periods of low potential for erosion (for
which no SWP3 must be developed).
Section A. Eligible Construction Sites
Discharges from construction activities within the regulated area where the small MS4 operator
meets the definition of construction site operator are eligible for authorization under this
general permit. Discharges from construction activities outside of the regulated area, where the
small MS4 operator meets the definition of construction site operator, are only eligible for
authorization under this general permit in those areas where the small MS4 operator meets all
the requirements of Parts IV.D.1-8. of this general permit.
Section B. Discharges Eligible for Authorization
1. Stormwater Associated with Construction Activity
Discharges of stormwater runoff from small and large construction activities may be
authorized under this general permit.
2. Discharges of Stormwater Associated with Construction Support Activities
Discharges of stormwater runoff from construction support activities, including concrete
batch plants, asphalt batch plants, equipment staging areas, material storage yards, material
borrow areas, and excavated material disposal areas may be authorized under this general
permit provided:
(a)
The activity is located within a one-mile distance from the boundary of the permitted
construction site and directly supports the construction activity;
(b)
A SWP3 is developed according to the provisions of this general permit and includes
appropriate controls and measures to control sediment and erosion and discharge of
pollutants in stormwater runoff from the supporting construction activity site;
(c)
The construction support activity either does not operate beyond the completion date
of the construction activity or obtains separate TPDES permit authorization for
discharges as required; and
(d)
The discharge of stormwater from concrete production facilities meets the
requirements in Section F below.

Page 116

Small MS4 General Permit
Part VII, Section C & D
Page 76
3. Non-Stormwater Discharges
This general permit authorizes the following non-stormwater discharges from construction
sites authorized under this general permit:
(a)
Discharges from emergency fire-fighting activities (emergency fire-fighting activities
do not include washing of trucks, runoff water from training activities, test water from
fire suppression systems, and similar activities);
(b)
Uncontaminated fire hydrant flushings (excluding discharges of hyperchlorinated
water, unless the water is first dechlorinated and discharges are not expected to
adversely affect aquatic life), which include flushings from systems that utilize potable
water, surface water, or groundwater that does not contain additional pollutants
(uncontaminated fire hydrant flushings do not include systems utilizing reclaimed
wastewater as a source water);
(c)
Water from the routine external washing of vehicles, the external portion of buildings
or structures, and pavement, where detergents and soaps are not used and where spills
or leaks of toxic or hazardous materials have not occurred (unless spilled materials
have been removed; and if local state, or federal regulations are applicable, the
materials are removed according to those regulations), and where the purpose is to
remove mud, dirt, or dust;
(d)
Uncontaminated water used to control dust;
(e)
Potable water sources including waterline flushings (excluding discharges of
hyperchlorinated water, unless the water is first dechlorinated and discharges are not
expected to adversely affect aquatic life);
(f)
Uncontaminated air conditioning condensate; and
(g)
Uncontaminated groundwater or spring water, including foundation or footing drains
where flows are not contaminated with industrial materials such as solvents.
4. Other Permitted Discharges
Any discharge authorized under a separate TPDES or TCEQ permit may be combined with
discharges from construction sites operated by the small MS4, provided the discharge complies
with the associated permit.
Section C. Limitations on Permit Coverage
Discharges that occur after construction activities have been completed, and after the
construction site and any supporting activity site have undergone final stabilization, are not
eligible for coverage under Part VII of the general permit.
Section D. Stormwater Pollution Prevention Plan (SWP3) Requirements
Operators of municipal construction activities that qualify for coverage under this general
permit and that discharge stormwater associated with construction activities into surface water
in the state must:
(a) Develop a SWP3 according to the provisions of this general permit that covers the
entire site and begin implementation of that plan prior to commencing construction
activities (NOTE: small MS4 operators may develop and implement a shared SWP3
with other operators covered under the TPDES CGP, TXR150000);

Page 117

Small MS4 General Permit
Part VII, Section E
Page 77
(b) Post a signed copy of the applicable TCEQ approved site notice form in a location at the
construction site where it is readily available for viewing prior to commencing
construction activities and maintain the notice in that location until completion of the
construction activity and final stabilization of the site;
(c) Ensure the project specifications allow or provide that adequate BMPs may be
developed and modified as necessary to meet the requirements of this general permit
and the SWP3;
(d) Ensure all contractors are aware of the SWP3 requirements, are aware that municipal
personnel are responsible for the day-to-day operations of the SWP3, and who to
contact concerning SWP3 requirements; and
(e) Ensure that the SWP3 identifies the municipal personnel responsible for
implementation of control measures described in the plan.
Section E. Contents of SWP3
The SWP3 must include, at a minimum, the information described in this section.
1. Site Description
A site description, or project description, which must include:
(a)
A description of the nature of the construction activity, potential pollutants and
sources;
(b)
A description of the intended schedule or sequence of major activities that will disturb
soils for major portions of the site;
(c)
The number of acres of the entire construction site property and the total number of
acres of the site where construction activities will occur, including off-site material
storage areas, overburden and stockpiles of dirt, and borrow areas;
(d)
Data describing the soil type or the quality of any discharge from the site;
(e)
A map showing the general location of the site (e.g., a portion of a city or county map);
(f)
A detailed site map indicating the following:
(1)
Drainage patterns and approximate slopes anticipated after major grading
activities;
(2)
Areas where soil disturbance will occur;
(3)
Locations of all major structural controls either planned or in place;
(4)
Locations where temporary or permanent stabilization practices are expected to
be used;
(5)
Locations of construction support activities, including off-site activities that are
authorized under the permittee’s NOI, including material, waste, borrow, fill, or
equipment storage areas;
(6)
Surface waters (including wetlands) either at, adjacent, or in close proximity to
the site;
(7)
Locations where stormwater discharges from the site directly to a surface water
body or an MS4; and
(8)
Vehicle wash areas.

Page 118

2024 Small MS4 General Permit
Part VII, Section E
Page 78
(g)
The location and description of asphalt plants and concrete plants (if any) providing
support to the construction site and that are also authorized under this general permit;
(h)
The name of receiving waters at or near the site that will be disturbed or that will
receive discharges from disturbed areas of the project; and
(i)
A copy of Part VII of this TPDES general permit.
2. Structural and non-structural controls
The SWP3 must describe the structural and the non-structural controls (BMPs) that will be
used to minimize pollution in runoff. The description must identify the general timing or
sequence for implementation and the party responsible for implementation. At a minimum,
the description must include the following components:
Erosion and Sediment Controls
(a)
Erosion and sediment controls must be designed to retain sediment on-site to the MEP
with consideration for local topography and rainfall.
(b)
Control measures must be properly selected, installed, and maintained according to
the manufacturer’s or designer’s specifications. If periodic inspections or other
information indicates a control has been used incorrectly, or that the control is
performing inadequately, the operator must replace or modify the control.
(c)
Sediment must be removed from sediment traps and sedimentation ponds no later
than the time that design capacity has been reduced by 50%.
(d)
If sediment escapes the site, accumulations must be removed at a frequency to
minimize further negative effects and, whenever feasible, prior to the next rain event.
(e)
Controls must be developed to limit offsite transport of litter, construction debris, and
construction materials by stormwater runoff.
3. Stabilization Practices
The SWP3 must include a description of interim and permanent stabilization practices for
the site, including a schedule of when the practices will be implemented. Site plans must
ensure that existing vegetation is preserved where possible.
(a)
Stabilization practices may include but are not limited to: establishment of temporary
vegetation, establishment of permanent vegetation, mulching, geotextiles, sod
stabilization, vegetative buffer strips, protection of existing trees and vegetation, and
other similar measures.
(b)
The following records must be maintained and either attached to or referenced in the
SWP3 and made readily available upon request to the parties in Part VII.J of this
general permit:
(1)
The dates when major grading activities occur;
(2)
The dates when construction activities temporarily or permanently cease on a
portion of the site; and
(3)
The dates when stabilization measures are initiated.
(c)
Stabilization measures must be initiated immediately in portions of the site where
construction activities have temporarily or permanently ceased, and will not resume
for a period exceeding 14 calendar days, except as provided in (1) and (2) below.

Page 119

2024 Small MS4 General Permit
Part VII, Section E
Page 79
(1)
Where the initiation of stabilization measures by the 14th day after construction
activity temporarily or permanently ceased is precluded by snow cover or frozen
ground conditions, stabilization measures must be initiated as soon as
practicable.
(2)
Where the initiation of stabilization measures by the 14th day after construction
activity has temporarily or permanently ceased is precluded by seasonably arid
conditions, stabilization measures must be initiated as soon as practicable. These
conditions exist in arid areas, semiarid areas, and areas experiencing drought
conditions.
4. Structural Control Practices
The SWP3 must include a description of any structural control practices used to divert flows
away from exposed soils, to limit the contact of runoff with disturbed areas, or to lessen the
off-site transport of eroded soils.
(a)
Sites with a drainage area of ten or more acres:
(1)
A sediment basin is required, where feasible, for a common drainage location
that serves an area with ten or more acres disturbed at one time. A sedimentation
basin may be temporary or permanent, but must provide sufficient storage to
contain a calculated volume of runoff from a 2-year, 24-hour storm from each
disturbed acre drained. When calculating the volume of runoff from a 2-year, 24-
hour storm event, it is not required to include the flows from off-site areas and
flow from on-site areas that are either undisturbed or have already undergone
final stabilization, if these flows are diverted around both the disturbed areas of
the site and the sediment basin. Capacity calculations must be included in the
SWP3.
(2)
Where rainfall data is not available or a calculation cannot be performed, the
sedimentation basin must provide at least 3,600 cubic feet of storage per acre
drained until the site reaches final stabilization.
(3)
If a sedimentation basin is not feasible, then the permittee shall provide
equivalent control measures until the site reaches final stabilization. In
determining whether installing a sediment basin is feasible, the permittee may
consider factors such as site soils, slope, available area, public safety,
precipitation pattern, site geometry, site vegetation, infiltration capacity,
geotechnical factors, depth to groundwater, and other similar considerations. The
permittee shall document the reason that the sediment basins are not feasible,
and shall utilize equivalent control measures, which may include a series of
smaller sediment basins.
(4)
Perimeter Controls – At a minimum, silt fences, vegetative buffer strips, or
equivalent sediment controls are required for all down slope boundaries of the
construction area, and for those side slope boundaries deemed appropriate as
dictated by individual site conditions.
(b)
Controls for sites with drainage areas less than ten acres:
(1)
Sediment traps and sediment basins may be used to control solids in stormwater
runoff for drainage locations serving less than ten acres. At a minimum, silt
fences, vegetative buffer strips, or equivalent sediment controls are required for
all down slope boundaries of the construction area, and for those side slope
boundaries deemed appropriate as dictated by individual site conditions.

Page 120

2024 Small MS4 General Permit
Part VII, Section E
Page 80
(2)
Alternatively, a sediment basin that provides storage for a calculated volume of
runoff from a 2-year, 24-hour storm from each disturbed acre drained may be
utilized. Where rainfall data is not available or a calculation cannot be performed,
a temporary or permanent sediment basin providing 3,600 cubic feet of storage
per acre drained may be provided. If a calculation is performed, then the
calculation shall be included in the SWP3.
5. Permanent Stormwater Controls
A description of any measures that will be installed during the construction process to
control pollutants in stormwater discharges that will occur after construction operations
have been completed must be included in the SWP3. Permittees are only responsible for the
installation and maintenance of stormwater management measures prior to final
stabilization of the site.
6. Other Controls
(a)
Off-site vehicle tracking of sediments and the generation of dust must be minimized.
(b)
The SWP3 must include a description of construction and waste materials expected to
be stored onsite and a description of controls to reduce pollutants from these
materials.
(c)
The SWP3 must include a description of pollutant sources from areas other than
construction (including stormwater discharges from dedicated asphalt plants and
dedicated concrete plants), and a description of controls and measures that will be
implemented at those sites to minimize pollutant discharges.
7. Effluent Limitations
The federal Effluent Limitations Guidelines at 40 CFR § 450.21 apply to all regulated
construction activities under the optional 8th MCM, where the small MS4 is the operator.
8. Approved State and Local Plans
(a)
The permittee shall ensure the SWP3 is consistent with requirements specified in
applicable sediment and erosion site plans or site permits, or stormwater management
site plans or site permits approved by federal, state, or local officials.
(b)
All SWP3s must be updated as necessary to remain consistent with any changes
applicable to protecting surface water resources in sediment erosion site plans or site
permits, or stormwater management site plans or site permits approved by state or
local official for whom the permittee receives written notice.
9. Maintenance
All erosion and sediment control measures and other protective measures identified in the
SWP3 must be maintained in effective operating condition. If through inspections the
permittee determines that BMPs are not operating effectively, maintenance must be
performed before the next anticipated storm event or as necessary to maintain the continued
effectiveness of stormwater controls. If maintenance prior to the next anticipated storm
event is impracticable, maintenance must be scheduled and accomplished as soon as
practicable.

Page 121

2024 Small MS4 General Permit
Part VII, Section E
Page 81
10. Inspections of Controls
(a)
Inspection Requirements. Personnel provided by the permittee must inspect disturbed
areas of the construction site that have not been finally stabilized, areas used for
storage of materials that are exposed to precipitation, discharge locations, and
structural controls for evidence of, or the potential for, pollutants entering the drainage
system. Personnel conducting these inspections must be knowledgeable of this general
permit, familiar with the construction site, and knowledgeable of the SWP3 for the site.
Sediment and erosion control measures identified in the SWP3 must be inspected to
ensure that they are operating correctly. Locations where vehicles enter or exit the site
must be inspected for evidence of off-site sediment tracking.
(b) Inspection Frequency.
(1) Inspections must be conducted at least once every 14 calendar days and within 24
hours of the end of a storm event of 0.5 inches or greater.
a.
If a storm event produces 0.5 inches or more of rain within a 24-hour period
(including when there are multiple, smaller storms that alone produce less
than 0.5 inches but together produce 0.5 inches or more in 24 hours), you are
required to conduct one inspection within 24 hours of when 0.5 inches of rain
or more has fallen. When the 24-hour inspection time frame occurs entirely
outside of normal working hours, you must conduct an inspection by no later
than the end of the next business day.
b.
If a storm event produces 0.5 inches or more of rain within a 24-hour period
on the first day of a storm and continues to produce 0.5 inches or more of rain
on subsequent days, you must conduct an inspection within 24 hours of the
first day of the storm and within 24 hours after the last day of the storm that
produces 0.5 inches or more of rain (i.e., only two inspections would be
required for such a storm event). When the 24-hour inspection time frame
occurs entirely outside of normal working hours, you must conduct an
inspection by no later than the end of the next business day.
(2) Where sites have been finally or temporarily stabilized or where runoff is unlikely
due to winter conditions (e.g., site is covered with snow, ice, or frozen ground
exists), inspections must be conducted at least once every month.
(3) In arid or semi-arid, or drought-stricken areas, inspections must be conducted at
least once every month and within 24 hours after the end of a storm event of 0.5
inches or greater.
(4) As an alternative to the above-described inspection schedule of once every 14
calendar days and within 24 hours of a storm event of 0.5 inches or greater, the
SWP3 may be developed to require that these inspections will occur at least once
every seven calendar days. If this alternative schedule is developed, then the
inspection must occur on a specifically defined day, regardless of whether or not
there has been a rainfall event since the previous inspection.
(5) The inspections may occur on either schedule provided that the SWP3 reflects the
current schedule and that any changes to the schedule are conducted in accordance
with the following provisions: the schedule may be changed a maximum of one
time each month, the schedule change must be implemented at the beginning of a
calendar month, and the reason for the schedule change must be documented in
the SWP3 (e.g., end of “dry” season and beginning of “wet” season).

Page 122

2024 Small MS4 General Permit
Part VII, Section E
Page 82
(6) In the event of flooding or other adverse conditions that prohibit access to the
inspection sites, inspections must be conducted as soon as access is practicable.
(d)
Utility line installation, pipeline construction, and other examples of long, narrow,
linear construction activities may provide inspection personnel with limited access to
the areas described in Part VII.E.10.(a) above.
(1) Inspection of these areas could require that vehicles compromise temporarily or
even permanently stabilized areas, cause additional disturbance of soils, and
increase the potential for erosion. In these circumstances, controls must be
inspected at least once every 14 calendar days and within 24 hours of the end of a
storm event of 0.5 inches, but representative inspections may be performed.
(2) For representative inspections, personnel must inspect controls along the
construction site for 0.25 miles above and below each access point where a
roadway, undisturbed right-of-way, or other similar feature intersects the
construction site and allows access to the areas described in Part VII.E.10.(a)
above.
(3) The conditions of the controls along each inspected 0.25 miles portion may be
considered as representative of the condition of controls along that reach
extending from the end of the 0.25 miles portion to either the end of the next 0.25
miles inspected portion, or to the end of the project, whichever occurs first.
(e) Requirements for inspections may be temporarily suspended for adverse conditions.
Adverse conditions are conditions that are either dangerous to personnel (e.g., high
wind, excessive lightning) or conditions that prohibit access to the site (e.g., flooding,
freezing conditions). Adverse conditions that result in the temporary suspension of a
permit requirement to inspect must be documented and included as part of the SWP3.
Documentation must include:
(1) the date and time of the adverse condition,
(2) names of personnel that witnessed the adverse condition, and
(3) a narrative for the nature of the adverse condition.
(f) The SWP3 must be modified based on the results of inspections, as necessary, to better
control pollutants in runoff. Revisions to the SWP3 must be completed within seven
calendar days following the inspection. If existing BMPs are modified or if additional
BMPs are necessary, an implementation schedule must be described in the SWP3 and
wherever possible those changes implemented before the next storm event. If
implementation before the next anticipated storm event is impracticable, these changes
must be implemented as soon as practicable.
(g)
A report summarizing the scope of the inspection, the date(s) of the inspection, and
major observations relating to the implementation of the SWP3 must be made and
retained as part of the SWP3. Major observations should include: The locations of
discharges of sediment or other pollutants from the site; locations of BMPs that need
to be maintained; locations of BMPs that failed to operate as designed or proved
inadequate for a particular location; and locations where additional BMPs are needed.
Actions taken as a result of inspections must be described within, and retained as a
part of, the SWP3. Reports must identify any incidents of non-compliance. Where a
report does not identify any incidents of non-compliance, the report must contain a
certification that the facility or site is in compliance with the SWP3 and this permit.

Page 123

2024 Small MS4 General Permit
Part VII, Section E
Page 83
The report must be signed by the person and in the manner required by 30 TAC §
305.128 (relating to Signatories to Reports).
(h)
The names and qualifications of personnel making the inspections for the permittee
may be documented once in the SWP3 rather than being included in each report.
11. Observation and Evaluation of Dewatering Controls
(a)
Personnel provided by the permittee must observe and evaluate dewatering controls at
a minimum of once per day on the days where dewatering discharges from the
construction site occur. Personnel conducting these evaluations must be
knowledgeable of this general permit, the construction activities at the site, and the
SWP3 for the site. Personnel conducting these evaluations are not required to have
signatory authority for reports under 30 TAC § 305.128 (relating to Signatories to
Reports).
(b)
Requirements for Observations and Evaluations
(1)
A report summarizing the scope of any observation and evaluation must be
completed within 24-hours following the evaluation. The report must also
include, at a minimum, the following:
a.
date of the observations and evaluation;
b.
name(s) and title(s) of personnel making the observations and evaluation;
c.
approximate times that the dewatering discharge began and ended on the
day of evaluation, or if the dewatering discharge that continues after normal
business hours, indicate that the discharge is continuous (this information
can be reported by personnel initiating the dewatering discharge);
d.
estimates of the rate (in gallons per day) of discharge on the day of
evaluation;
e.
whether or not any indications of pollutant discharge were observed at the
point of discharge (e.g., foam, oil sheen, noticeable odor, floating solids,
suspended sediments, or other obvious indicators of stormwater pollution);
and
f.
major observations, including: the locations of where erosion and
discharges of sediment or other pollutants from the site have occurred;
locations of BMPs that need to be maintained; locations of BMPs that failed
to operate as designed or proved inadequate for a particular location; and
locations where additional BMPs are needed.
(2)
Actions taken as a result of evaluations, including the date(s) of actions taken,
must be described within, and retained as a part of, the SWP3. Reports must
identify any incidents of non-compliance. Where a report does not identify any
incidents of non-compliance, the report must contain a certification that the
facility or site is in compliance with the SWP3 and this permit. The report must
be retained as part of the SWP3 and signed by the person and in the manner
required by 30 TAC § 305.128 (relating to Signatories to Reports).
(3)
The names and qualifications of personnel making the evaluations for the
permittee may be documented once in the SWP3 rather than being included in
each report.

Page 124

2024 Small MS4 General Permit
Part VII, Section F
Page 84
12. Pollution Prevention Measures
The SWP3 must identify and ensure the implementation of appropriate pollution prevention
measures for all eligible non-stormwater components of the discharge.
Section F. Stormwater Runoff from Concrete Batch Plant
Discharges of stormwater runoff from concrete batch plants at construction sites authorized
under this general permit may be authorized under the provisions of this general permit
provided that the requirements in this section are met. If discharges of stormwater runoff from
concrete batch plants are not covered under this general permit, then discharges must be
authorized under an alternative general permit or an individual permit. This general permit
does not authorize the discharge or land disposal of any wastewater from concrete batch plants
at construction sites authorized under this general permit. Authorization for these wastes must
be obtained under an individual permit or an alternative general permit.
1. Benchmark Sampling Requirements
(a)
Small MS4 operated concrete batch plants authorized under this section must sample
the stormwater runoff from the concrete batch plants according to the requirements of
this section of the general permit, and must conduct evaluations of the effectiveness of
the SWP3 based on the following benchmark monitoring values:
Table 17. Benchmark Monitoring
Benchmark
Parameters (*1)
Benchmark
Value
Sampling
Frequency (*2)(*3)
Sample
Type (*4)
Oil and Grease
15 mg/L
1/quarter
Grab
Total Suspended Solids 50 mg/L
1/quarter
Grab
pH
6.0-9.0 S.U.1
1/quarter
Grab
Total Iron
1.3 mg/L
1/quarter
Grab
1Standard Units (S.U)
(*1) Analytical data intended for compliance with benchmark monitoring
requirements must be analyzed by a National Environmental Laboratory
Accreditation Program (NELAP) accredited laboratory based on state rules
located in 30 TAC Chapter 25. Analysis must be performed using sufficiently
sensitive methods for analysis that comply with the rules located in 40 CFR
§§ 136.1(c) and 122.44(i)(1)(iv).
(*2) When discharge occurs. Sampling is required within the first 30 minutes of
discharge. If it is not practicable to take the sample, or to complete the
sampling, within the first 30 minutes, sampling must be completed within the
first hour of discharge. If sampling is not completed within the first 30
minutes of discharge, the reason must be documented and attached to all
required reports and records of the sampling activity.
(*3) Sampling must be conducted at least once during each of the following
periods. The first sample must be collected during the first full quarter that a
stormwater discharge occurs from a concrete batch plant authorized under
this general permit.
•
January through March

Page 125

2024 Small MS4 General Permit
Part VII, Section F
Page 85
•
April through June
•
July through September
•
October through December
For projects lasting less than one full quarter, a minimum of one sample shall
be collected, provided that a stormwater discharge occurred at least once
following submission of the small MS4 NOI.
(*4) A grab sample shall be collected from the stormwater discharge resulting
from a storm event that is at least 0.1 inches of measured precipitation that
occurs at least 72 hours from the previously measurable storm event. The
sample shall be collected downstream of the concrete batch plant, and where
the discharge exits any BMPs utilized to handle the runoff from the batch
plant, prior to commingling with any other water authorized under this
general permit.
(b)
The permittee shall compare the results of sample analyses to the benchmark values
above, and must include this comparison in the overall assessment of the SWP3’s
effectiveness. Analytical results that exceed a benchmark value are not a violation of
this permit, as these values are not numeric effluent limitations. Results of analyses are
indicators that modifications of the SWP3 should be assessed and may be necessary to
protect water quality. The operator must investigate the cause for each exceedance and
must document the results of this investigation in the SWP3 by the end of the quarter
following the sampling event.
The small MS4 operator’s investigation must identify the following:
(1)
Any additional potential sources of pollution, such as spills that might have
occurred;
(2)
Necessary revisions to good housekeeping measures that are part of the SWP3;
(3)
Additional BMPs, including a schedule to install or implement the BMPs; and
(4)
Other parts of the SWP3 that may require revisions in order to meet the goal of
the benchmark values.
Background concentrations of specific pollutants may also be considered during the
investigation. If the operator is able to relate the cause of the exceedance to
background concentrations, then subsequent exceedances of benchmark values for that
pollutant may be resolved by referencing earlier findings in the SWP3. Background
concentrations may be identified by laboratory analyses of samples of stormwater
runoff on to the permitted facility, by laboratory analyses of samples of stormwater
runoff from adjacent non-industrial areas, or by identifying the pollutant is a naturally
occurring material in soils at the site.
2. BMPs and SWP3 Requirements for Concrete Batch Plants
The following are required for concrete batch plants in addition to other SWP3 requirements
listed in this section:
(a)
Description of Potential Pollutant Sources – The SWP3 must provide a description of
potential sources (activities and materials) that may reasonably be expected to affect
the quality of stormwater discharges associated with concrete batch plants authorized
under this permit. The SWP3 must describe practices that that will be used to reduce
the pollutants in these discharges to assure compliance with this general permit,

Page 126

2024 Small MS4 General Permit
Part VII, Section F
Page 86
including the protection of water quality, and must ensure the implementation of these
practices. The following must be developed, at a minimum, in support of developing
this description:
(1)
Drainage – The site map must include the following information:
a.
The location of all outfalls for stormwater discharges associated with
concrete batch plants that are authorized under this permit;
b.
A depiction of the drainage area and the direction of flow to the outfall(s);
c.
Structural controls used within the drainage area(s);
d.
The locations of the following areas associated with concrete batch plants
that are exposed to precipitation: vehicle and equipment maintenance
activities (including fueling, repair, and storage areas for vehicles and
equipment scheduled for maintenance); areas used for the treatment,
storage, or disposal of wastes listed in the TPDES CGP, TXR150000; liquid
storage tanks; material processing and storage areas; and loading and
unloading areas; and
e.
The locations of the following: any bag house or other dust control
device(s); recycle or sedimentation pond, clarifier or other device used for
the treatment of facility wastewater (including the areas that drain to the
treatment device); areas with significant materials; and areas where major
spills or leaks have occurred.
(2)
Inventory of Exposed Materials – A list of materials handled at the concrete
batch plant that may be exposed to stormwater and that have a potential to affect
the quality of stormwater discharges associated with concrete batch plants that
are authorized under this general permit.
(3)
Spills and Leaks – A list of significant spills and leaks of toxic or hazardous
pollutants that occurred in areas exposed to stormwater and that drain to
stormwater outfalls associated with concrete batch plants authorized under this
general permit must be developed, maintained, and updated.
(4)
Sampling Data – A summary of existing stormwater discharge sampling data
must be maintained, if available.
(b)
Measures and Controls - The SWP3 must include a description of management
controls to regulate pollutants identified in the SWP3’s “Description of Potential
Pollutant Sources” from Part VII.F.2.(a) of this permit, and a schedule for
implementation of the measures and controls. This must include, at a minimum:
(1)
Good Housekeeping – Good housekeeping measures must be developed and
implemented in the area(s) associated with concrete batch plants.
a.
Operators must prevent or minimize the discharge of spilled cement,
aggregate (including sand or gravel), settled dust, or other significant
materials from paved portions of the site that are exposed to stormwater.
Measures used to minimize the presence of these materials may include
regular sweeping or other equivalent practices. These practices must be
conducted at a frequency that is determined based on consideration of the
amount of industrial activity occurring in the area and frequency of
precipitation, and shall occur at least once per week when cement or
aggregate is being handled or otherwise processed in the area.

Page 127

2024 Small MS4 General Permit
Part VII, Section F
Page 87
b.
Operators must prevent the exposure of fine granular solids, such as
cement, to stormwater. Where practicable, these materials must be stored
in enclosed silos, hoppers or buildings, in covered areas, or under covering.
(2)
Spill Prevention and Response Procedures – Areas where potential spills that can
contribute pollutants to stormwater runoff, and the drainage areas from these
locations, must be identified in the SWP3. Where appropriate, the SWP3 must
specify material handling procedures, storage requirements, and use of
equipment. Procedures for cleaning up spills must be identified in the SWP3 and
made available to the appropriate personnel.
(3)
Inspections – Qualified facility personnel (for example, a person or persons with
knowledge of this general permit, the concrete batch plant, and the SWP3 related
to the concrete batch plant(s) for the site) must be identified to inspect
designated equipment and areas of the facility specified in the SWP3. The
inspection frequency must be specified in the SWP3 based upon a consideration
of the level of concrete production at the facility, but must be a minimum of once
per month while the facility is in operation. The inspection must take place while
the facility is in operation and must, at a minimum, include all areas that are
exposed to stormwater at the site, including material handling areas, above
ground storage tanks, hoppers or silos, dust collection or containment systems,
truck wash down and equipment cleaning areas. Follow-up procedures must be
used to ensure that appropriate actions are taken in response to the inspections.
Records of inspections must be maintained and be made readily available for
review upon request by the agencies and officials in Part VII.J of this general
permit.
(4)
Employee Training – An employee training program must be developed to
educate personnel responsible for implementing any component of the SWP3, or
personnel otherwise responsible for stormwater pollution prevention, with the
provisions of the SWP3. The frequency of training must be documented in the
SWP3, and at a minimum, must consist of one training prior to the initiation of
operation of the concrete batch plant.
(5)
Record Keeping and Internal Reporting Procedures – A description of spills and
similar incidents, plus additional information that is obtained regarding the
quality and quantity of stormwater discharges, must be included in the SWP3.
Inspection and maintenance activities must be documented and records of those
inspection and maintenance activities must be incorporated in the SWP3.
(6)
Management of Runoff – The SWP3 shall contain a narrative consideration for
reducing the volume of runoff from concrete batch plants by diverting runoff or
otherwise managing runoff, including use of infiltration, detention ponds,
retention ponds, or reusing of runoff.
(c)
Comprehensive Compliance Evaluation – At least once per year, one or more qualified
personnel (for example, a person or persons with knowledge of this general permit, the
concrete batch plant, and the SWP3 related to the concrete batch plant(s) for the site)
shall conduct a compliance evaluation of the plant. The evaluation must include the
following:
(1)
Visual examination of all areas draining stormwater associated with regulated
concrete batch plants for evidence of, or the potential for, pollutants entering the
drainage system. These include but are not limited to: cleaning areas, material
handling areas, above ground storage tanks, hoppers or silos, dust collection or

Page 128

2024 Small MS4 General Permit
Part VII, Section F
Page 88
containment systems, and truck wash down and equipment cleaning areas.
Measures implemented to reduce pollutants in runoff (including structural
controls and implementation of management practices) must be evaluated to
determine if they are effective and if they are implemented in accordance with the
terms of this permit and with the small MS4’s SWP3. The operator shall conduct
a visual inspection of equipment needed to implement the SWP3, such as spill
response equipment.
(2)
Based on the results of the evaluation, the following must be revised as
appropriate within two weeks of the evaluation: the description of potential
pollutant sources identified in the SWP3 (as required in Part VII.F.2(a),
“Description of Potential Pollutant Sources”); and pollution prevention measures
and controls identified in the SWP3 (as required in Part VII.F.2.(b) “Measures and
Controls”). The revisions may include a schedule for implementing the necessary
changes.
(3)
The permittee shall prepare and include in the SWP3 a report summarizing the
scope of the evaluation, the personnel making the evaluation, the date(s) of the
evaluation, major observations relating to the implementation of the SWP3, and
actions taken in response to the findings of the evaluation. The report must
identify any incidents of noncompliance. Where the report does not identify
incidences of noncompliance, the report must contain a statement that the
evaluation did not identify any incidence(s), and the report must be signed
according to 30 TAC § 305.128, relating to Signatories to Reports.
(4)
The Comprehensive Compliance Evaluation may substitute for one of the required
inspections required in Part VII.F.2.(b)(3) of this general permit.
3. Concrete Truck Wash Out Requirements
This general permit authorizes the wash out of concrete trucks at construction sites
authorized under this general permit, provided the following requirements are met.
Authorization is limited to the land disposal of wash out water from concrete trucks. Any
other direct discharge of concrete production wastewater must be authorized under a
separate TCEQ general permit or individual permit.
(a)
Direct discharge of concrete truck washout water to surface water in the state, including
discharge to storm sewers, is prohibited by this general permit.
(b)
Concrete truck washout water shall be discharged to areas at the construction site where
structural controls have been established to prevent direct discharge to surface waters
or to areas that have a minimal slope that allow infiltration and filtering of wash out
water to prevent direct discharge to surface waters. Structural controls may consist of
temporary berms, temporary shallow pits, temporary storage tanks with slow rate
release, or other reasonable measures to prevent runoff from the construction site.
(c)
Wash out of concrete trucks during rainfall events shall be minimized. The direct
discharge of concrete truck washout water is prohibited at all times, and the operator
shall insure that its BMPs are sufficient to prevent the discharge of concrete truck
washout as the result of rain.
(d)
The discharge of wash out water shall not cause or contribute to groundwater
contamination.
(e)
The SWP3 shall include concrete wash out areas on the associated map.

Page 129

2024 Small MS4 General Permit
Part VII, Sections G - L
Page 89
Section G. Effective Date of Coverage
Construction activities may not commence under this section until the small MS4 NOI is
approved in writing by the TCEQ. Following approval of the NOI, operators of construction
activities eligible for coverage under this general permit are authorized to discharge stormwater
associated with construction activity immediately upon posting the signed applicable TCEQ
approved construction site notice form required under this MCM.
Section H. Deadlines for SWP3 Preparation and Compliance
The SWP3 must:
1.
Be completed and initially implemented prior to commencing construction activities
that result in soil disturbance;
2.
Be updated as necessary to reflect the changing conditions of new contractors, new areas
of responsibility, and changes in BMPs; and
3.
Provide for compliance with the terms and conditions of this general permit.
Section I. Plan Review and Making Plans Available
The SWP3 must be retained onsite at the construction site or made readily available at the time
of an onsite inspection to: the executive director; a federal, state, or local agency approving
sediment and erosion plans, grading plans, or stormwater management plans; and to local
government officials.
Section J. Keeping Plans Current
The permittee shall amend the SWP3 whenever either of the following occurs:
1.
There is a change in design, construction, operation, or maintenance that has a
significant effect on the discharge of pollutants and that has not been previously
addressed in the SWP3; or
2.
Results of inspections or investigations by site operators, authorized TCEQ personnel,
or a federal, state or local agency approving sediment and erosion plans indicate the
SWP3 is proving ineffective in eliminating or significantly minimizing pollutants in
discharges authorized under this general permit.
Section K. Delegation of Signatory Authority
If signatory authority is delegated by an authorized representative, then a Delegation of
Signatory form must be submitted as required by 30 TAC § 305.128 (relating to Signatories to
Reports) using the State of Texas Environmental Electronic Reporting System (STEERS),
TCEQ’s online permitting system, unless the permittee requested and obtained an Electronic
Reporting Waiver. A new Delegation of Signatory form must be submitted if the delegation
changes to another individual or position during the permit term.
Section L. Additional Retention of Records
The permittee shall retain the following records for a minimum period of three years from the
date that final stabilization has been achieved on all portions of the site. Records include:
1.
A copy of the SWP3; and
2.
All reports and actions required by this section, including copies of the approved TCEQ
construction site notice forms.

Page 130

Appendix D
“Notice of Intent (NOI)”

Page 131

MS4 Entity Information
Application Fee Information
MS4 Contact Information
MS4 Operator Contact Information
MS4 Operator Contact Mailing Address
Application Contact and any additional MS4 contacts
Annual Billing Contact Information
Annual Billing Mailing Address
NOTICE OF INTENT (NOI)
Under Phase II MS4 General
Permitting Program

MS4 Name: Williamson Travis Counties MUD 1 MS4
MS4 Operator: Williamson Travis Counties MUD 1
MS4 Class: Phase II: Small
Operator Type: Municipal
MS4 Entity Type: District
City: Cedar Park
County: Williamson
MS4 State/Territory: Texas
Designation Date: 12/29/2009
Designation Type: Automatic Nationwide
Population: 5,700
Source: 2020
MS4 Identifier: MS4-TX-SM-MU-2009-0697
NPDES ID: TXR040738
MGP Number: TXR040000
Joint Coverage: No
Description of Location:
AREA WITHIN CITY OF CEDAR PARK LIMITS THAT IS LOCATED WITHIN THE 2020 CENSUS AUSTIN URBAN AREA IN TRAVIS AND WILLIAMSON COUNTIES.

Provide your payment information below, for verification of payment: ePay

Voucher Number: 747046

Use the space below to attach a copy of your payment voucher:
Name
Uploaded Date
Size
 WTC MUD 1 - TCEQ ePay (voucher).pdf (attachment/26588)
06/30/2026
133.86 KB

First Name: Hanoi
Middle Initial:
Last Name: Avila
Title: Vice President
Organization:
Williamson Travis Counties
MUD 1
Phone: 512-996-0249
Phone Ext:
Email: havila@wtcmud1.org
Address Line 1: 9 E Greenway Plaza, Suite 1000
Address Line 2:
City: Houston
State: TX
ZIP/Postal Code: 77046
First Name: Justin
Last Name: Klump
Title: Municipal Consultant
Phone: 281-736-4465
Email: jtklump@swstx.com
Contact Type: MS4 Manager
First Name:
Middle Initial:
Last Name:
Title:
Organization:
Phone:
Phone Ext:
Email:
Address Line 1: 130 Industrial Blvd, Suite 120
Address Line 2:

Page 132

Core Data Form
Regulated Entity Information
Standing With TCEQ
MS4 General Information
Receiving Waterbody Information
Discharge Information
City: Sugar Land
State: TX
ZIP/Postal Code: 77478

Is the applicant a current customer with the TCEQ? Yes

What is the Customer Number (CN) issued to this entity? CN: 600634562
What is the Legal Name of the entity (applicant) applying for this permit? Williamson Travis Counties Municipal Utility District 1
Complete and attach a Core Data Form (TCEQ-10400) (https://www.tceq.texas.gov/permitting/central_registry/guidance.html) for this customer:
Name
Uploaded Date
Size
 WTC MUD 1 - CDF (Wet).pdf (attachment/26624)
06/30/2026
204.04 KB

Is this an existing permitted site? Yes

What is the Regulated Entity Number (RN) issued to this site? RN: 105624159
Name of site as known by the local community: Williamson Travis Counties MUD 1 MS4
Name of the urban area(s) the Phase II MS4 is located within:
Austin, TX
Provide a brief description of the regulated MS4 boundaries:
AREA WITHIN CITY OF CEDAR PARK LIMITS THAT IS LOCATED WITHIN THE 2020 CENSUS AUSTIN URBAN AREA IN TRAVIS AND WILLIAMSON COUNTIES.

Do you owe TCEQ any delinquent fees?: No
What is your Regulated Entity Reference Number (RN)’s Compliance History classification? Check your RN’s Compliance History classification using the TCEQ Compliance History Database Search: Satisfactory

Was your MS4 formally "designated" by TCEQ as needing coverage under this general permit based on 40 CFR § 122.32(a)(2) (https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-122/subpart-B/section-
122.32#p-122.32(a)(2)) or 40 CFR § 122.26(a)(1)(v) (https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-122/subpart-B/section-122.26#p-122.26(a)(1)(v))?
No
Select the MS4 level, which is based on the population served within the "urban area with a population of 50,000 or more people" based on the 2020 Decennial Census.
Level 2b: Level 2b: Non-traditional MS4s: This level also includes all non-traditional small MS4s regardless of population unless the non-traditional MS4 can demonstrate that it meets the criteria for a waiver from permit coverage.
What is the estimated current population served by your MS4 (regulated area)? 5700
Is the MS4 part of a coalition? No

List the names of all waterbody receiving stormwater discharges from the MS4. For each waterbody, please report the classified segments it discharges into and, if applicable, any impairments and TMDLs.
943: South Brushy Creek
Name of the first waterbody to receive discharge from the small MS4: South Brushy Creek
Is this waterbody a classified stream segment as established by TCEQ? No

Does your small MS4 discharge directly or indirectly? Directly

Is this waterbody listed as a Category 5 impairment on the Texas Integrated Report? No

Is this waterbody listed as impaired with an approved Total Maximum Daily Load (TMDL)? No

What is the classified segment the discharge will eventually reach? Brushy Creek

Is this waterbody listed as a Category 5 impairment on the Texas Integrated Report? Yes

What is/are the pollutants of concern?: bacteria

Is this waterbody listed as impaired with an approved Total Maximum Daily Load (TMDL)? No
943: Lake Creek

Page 133

Stormwater Management Program (SWMP)
MCM1: Public Education and Outreach
Public Education and Outreach BMPs and Measurable Goals
I acknowledge that I understand that my MS4 must implement the following BMPs and Measurable Goals.
Name of the first waterbody to receive discharge from the small MS4: Lake Creek
Is this waterbody a classified stream segment as established by TCEQ? No

Does your small MS4 discharge directly or indirectly? Indirectly

Is this waterbody listed as a Category 5 impairment on the Texas Integrated Report? No

Is this waterbody listed as impaired with an approved Total Maximum Daily Load (TMDL)? No

What is the classified segment the discharge will eventually reach? Brushy Creek

Is this waterbody listed as a Category 5 impairment on the Texas Integrated Report? Yes

What is/are the pollutants of concern?: bacteria

Is this waterbody listed as impaired with an approved Total Maximum Daily Load (TMDL)? No

I acknowledge that a SWMP has been developed according to the provisions of the Small MS4 General Permit TXR040000. Yes
Have the program elements in the previous SWMP been re-assessed and modified and new program elements been developed and implemented, as necessary? Yes
Is the optional 8th Minimum Control Measure (MCM) for Municipal Construction Activities selected and included with the SWMP? No
Do you have a webpage where the SWMP and annual reports will be posted for the public view? Yes

Provide the web address URL: https://wtcmud1.org/

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 1? No
I understand that my MS4's public education and outreach program must at a minimum include the following target audiences, as applicable:
Universities- faculty, other staff, and students;
Military bases - military personnel (and dependents), and employees (including contractors);
Prison complexes or other multi-building complexes -staff and contractors
Municipal Utility Districts and other special districts -staff and contractors;
Transportation authorities - staff, contractors, and users.
Yes
What is/are the pollutant(s) or source(s) being addressed?
Grass clippings and leaf litter
Pet waste
Does your MS4 have a website? Yes

Provide the web address URL: https://wtcmud1.org/
BMP: Information on the MS4 Operator's website
Associated Measurable Goal: Maintain a webpage with current and accurate information and working links. All links shall be checked, and the
page shall be updated as necessary at a minimum of once annually. Must be maintained for the full year, each year. Yes
BMP: Social media posts, social media campaign
Associated Measurable Goal: Post a minimum of four times each year on a minimum of one social media platform. The message shall address
ways attendees can minimize or avoid adverse stormwater impacts or practices to improve the quality of stormwater runoff. The messages
shall be seasonally appropriate. Must make a minimum of one post per quarter and all quarterly posts must be visible by attendees for the full
year, each year. No
BMP: Maintain or mark storm drains and inlets with, "No Dumping – Drains to Creek" or a similar message
Associated Measurable Goal: Placard, stencil, or paint a minimum of 10% of all known stormwater inlets in either high-impact areas identified
by the small MS4 operator or impairment watersheds within the MS4 area each year. Where all known stormwater inlets have been marked,
inspect, and maintain the markers for a minimum of 15% of all known stormwater inlets in either high-impact areas identified by the small MS4
operator or impairment watersheds within the MS4 area each year. No
BMP: Media/advertising campaign/public service announcements in areas of high visibility: Billboard/poster; Bus shelter/bench;
radio/television/movie theatre; and kiosks
Associated Measurable Goal: Develop topics that address activities or pollutants of concern. Advertisement must be active for a minimum of
three weeks each year; or must have an estimated public exposure for the duration of the advertising campaign that is equal to twice the
population for the small MS4 area (based on the most recent U.S. Census Bureau decennial population value for the small MS4 area). No
BMP: Publish articles in local newspaper or newsletter, may be electronic
Associated Measurable Goal: Develop article topics that are group specific and address activities or pollutants of concern at a seasonally
appropriate time. A minimum of two articles must be published or emailed to target audience groups each year. No

Page 134

MCM2: Public Involvement/Participation
Public Involvement/Participation BMPs and Measurable Goals
I acknowledge that I understand that my MS4 must implement the following BMPs and Measurable Goals.
MCM3: Illicit Discharge Detection and Elimination (IDDE)
Illicit Discharge Detection and Elimination (IDDE) BMPs and Measurable Goals
I acknowledge that I understand that my MS4 must implement all the following BMPs and Measurable Goals.
BMP: Fact sheets/brochures/utility bill inserts/door hangers
Associated Measurable Goal: Develop material topics that are group specific and address activities or pollutants of concern. Fact sheets,
brochures, bill inserts, door hangers, or handouts shall be distributed each year for at least 75% of the intended audience. Develop and
implement a tracking system to estimate what percentage of the intended audience is reached for determining BMP effectiveness. Yes
BMP: Permanent stormwater related signage
Associated Measurable Goal: Place signage in a location where the message is relevant, and highly visible to target audience. Signage will
count as an annual BMP for the year it was put in place and for each subsequent year of this permit cycle as long as each of those years, the
permittee inspects and maintains, as necessary, 100% of the signage once annually. No
BMP: Promote, host, or develop educational meetings, seminar, or trainings
Associated Measurable Goal: Hold, host, or promote a minimum of one event for Level 1 and 2 MS4s or two events for Level 3 and 4 MS4s
annually. The events shall address ways attendees can minimize or avoid adverse impacts to stormwater or practices to improve the quality of
stormwater runoff. These events may address different pollutants and audiences. Yes
BMP: Targeted education campaign via mail, email, or in person
Associated Measurable Goal: Minimum of one campaign annually distributed to at least 75% of the intended audience, or with a specific event
advertised to at least 75% of the intended audience. Develop and implement a tracking system to estimate what percentage of the intended
audience is reached for determining BMP effectiveness. Yes

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 2? No
BMP: Stream/lake or watershed clean-up events; litter/trash clean-up events such as Adopt-A-Highway, Adopt-A-Spot, Adopt-A-Street,
Adopt-A-Stream, etc
Associated Measurable Goal: Host or support at a minimum one event for Level 1 and 2 MS4s or two events for Level 3 and 4 MS4s annually.
To be considered an event, the land area cleaned must be a minimum of: two acres, 400 yards of steam/streambank/riparian area, or two miles
of roadside. These may be combined (such as one acre of land and 200 yards of stream). No
BMP: Habitat improvement; Tree planting; Invasive Vegetation removal; Stream restoration
Associated Measurable Goal: Host or support at a minimum one event for Level 1 and 2 MS4s or two events for Level 3 and 4 MS4s annually.
To be considered an event, the project must be a minimum of 0.5 acres or 25 yards. An event may take place in streams, parks, areas adjacent
to public waterways, or other green space. An event may be a combination of locations and areas. No
BMP: Volunteer water quality monitoring such as Texas Stream Team
Associated Measurable Goal: Host or support a minimum one event annually. To be considered an event, the monitoring must be conducted at
minimum once each year. No
BMP: Stormwater related speaker series
Associated Measurable Goal: Provide or support a minimum of one session for Level 1 and 2 MS4s or two sessions for Level 3 and 4 MS4s
each year. These may be different speakers or audiences. Yes
BMP: MS4 area-wide stormwater survey for input on program implementation
Associated Measurable Goal: Provide or support a minimum of one public survey annually for input on the program implementation to be
distributed to at least 75% of the intended audience. Develop and implement a tracking system to estimate what percentage of the intended
audience is reached for determining BMP effectiveness. Yes
BMP: Hold events to train residents, or work a project for homeowner associations (HOAs), or other public groups to cover stormwater
topics such as: Building rain barrels; Fertilizer application training; Rain garden/bio retention creation or maintenance; How to recognize
illicit discharge activities and communicate observations to appropriate MS4 staff
Associated Measurable Goal: Provide or support at minimum one project or training annually. No
BMP: Educational display/booth at a school, public event, or similar event to provide information or displays that work to improve public
understanding of issues related to water quality.
Associated Measurable Goal: Provide or support one booth or display at minimum annually. The booth or display must be staffed during the
time which the event is open to the public. No
BMP: Public meeting for input on the program implementation such as a city council meeting, board meeting, or stakeholder meeting
Associated Measurable Goal: Host or support a minimum of one meeting annually for input on the program implementation to be advertised to
at least 75% of the intended audience. Develop and implement a tracking system to estimate what percentage of the intended audience is
reached for determining BMP effectiveness. Yes

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 3? No
BMP: Maintain a current and accurate MS4 map as described in Part IV.D.3.(c)(1) of the General Permit.
Associated Measurable Goal: Review and update, as necessary, at least one time annually to include features which have been added,
removed, or changed. Yes

What is the current status of your MS4 map? Under Development
BMP: Conduct training for all the permittee's field staff as described in Part IV.D.3.(c)(2) of the General Permit.

Page 135

MCM4: Construction Site Stormwater Runoff Control
Construction Site Stormwater Runoff Control BMPs and Measurable Goals
I acknowledge that I understand that my MS4 must implement all the following BMPs and Measurable Goals.
Associated Measurable Goal: Conduct a minimum of one training annually for 100% of MS4 field staff that may come into contact with or
otherwise observe an illicit discharge, illegal dumping, or illicit connection to the small MS4 as part of their normal job responsibilities. Yes
BMP: Maintain and publicize a public reporting method for the public to report illicit discharges, illegal dumping, or water quality impacts
associated with discharges into or from the small MS4 such as a reporting hotline, online form, or other similar mechanism as described in
Part IV.D.3.(c)(3) of the General Permit.
Associated Measurable Goal: Maintain a minimum of one public reporting mechanism 100% of the time during the permit term. Publicize the
public reporting mechanism a minimum of two times annually in a method designed to reach the majority of the intended audience. Develop
and implement a tracking system to estimate what percentage of the intended audience is reached for determining BMP effectiveness. In
addition, if the MS4 operator has a public website, the public reporting mechanism must be publicized on the public website 100% of the time
during the permit term. Yes
BMP: Develop and maintain procedures for responding to illicit discharges, illegal dumping, and spills as described in Part IV.D.3.(c)(4) of
the General Permit.
Associated Measurable Goal: Review and update the procedures at least one time annually to address changes and make improvements to
the established procedures where applicable. Yes
BMP: Source investigation and elimination of illicit discharges and illegal dumping as described in Part IV.D.3.(c)(5) of the General Permit.
Associated Measurable Goal: Respond to 100% of known illicit discharges and illegal dumping incidents each year to investigate sources (or
some Level 2b MS4s must notify the appropriate agency with the authority to act). Each year, respond to 100% of high priority discharges each
year, such as sanitary sewer discharges within 24 hours (or some Level 2b MS4s must notify the appropriate agency with the authority to act).
For 100% of known illicit discharges or illegal dumping incidents where the small MS4 does not have jurisdiction, notify the adjacent MS4
operator or the applicable TCEQ regional office each year. Notify TCEQ immediately of 100% of illicit flows believed to be an immediate threat
to human health or the environment throughout the permit term. Yes
BMP: Corrective action to eliminate illicit discharges and illegal dumping as described in Part IV.D.3.(c)(5) of the General Permit.
Associated Measurable Goal: For 100% of illicit discharges or illegal dumping where a source has been determined, notify the responsible
party of the problem within 24 hours. Require the responsible party to perform all necessary corrective actions to eliminate the illicit discharge.
Yes
BMP: Inspection Procedures as described in Part IV.D.3.(c)(6) of the General Permit.
Associated Measurable Goal: Review and update the procedures at least one time annually to address changes and make improvements to
the established inspection procedures where applicable. Yes
BMP: Inspections in response to complaints as described in Part IV.D.3.(c)(6) of the General Permit.
Associated Measurable Goal: Conduct inspections in response to 100% of complaints each year according to the established procedures (or
some Level 2b MS4s must notify the appropriate agency with the authority to act). Conduct follow up inspections in 100% of cases each year
where necessary as described in the established procedures (except for some Level 2b MS4s without the appropriate authority to act) Yes

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 4? No
BMP: Develop and maintain an ordinance or other regulatory mechanism as described in Part IV.D.4.(a) of the General Permit.
Associated Measurable Goal: Review and update the ordinance or other regulatory mechanism at least one time during the permit term to
address changes and make improvements to the ordinance where applicable. Yes
BMP: Prohibit discharges as described in Part IV.D.4.(b)(2) of the General Permit.
Associated Measurable Goal: Develop and maintain an ordinance or other regulatory mechanism to prohibit these discharges. Review and
update the ordinance or other regulatory mechanism at least one time during the permit term to address changes and make improvements to
the ordinance where applicable. Yes
BMP: Maintain and implement site plan review procedures that describe which plans will be reviewed as well as when an operator may
begin construction as described in Part IV.D.4.(b)(3) of the General Permit.
Associated Measurable Goal: Review and update site plan review procedures at least one time annually to address changes and make
improvements to the established procedures where applicable. Implement site plan review procedures for 100% of new construction site plans
received each year. Yes
BMP: Implement procedures for inspecting large and small construction projects as described in Part IV.D.4.(b)(4) of the General Permit.
Associated Measurable Goal: Review and update inspection procedures at least one time annually to address changes and make
improvements to the established procedures where applicable. Yes
BMP: Conduct construction site inspections as described in Part IV.D.4.(b)(4) of the General Permit.
Associated Measurable Goal: Conduct inspections at a minimum of 80% of active construction sites annually according to the established
procedures (or some Level 2b small MS4s must notify the appropriate agency with the authority to act). Each year, conduct follow up
inspections in 100% of cases where necessary as described in the established procedures (except for some Level 2b small MS4s without the
appropriate authority to act). Yes

Do you have the appropriate authority to implement this BMP? Yes
BMP: Develop, implement, and maintain procedures for receipt and consideration of information submitted by the public as described in
Part IV.D.4.(b)(5) of the General Permit.
Associated Measurable Goal: Review and update procedures for the receipt and consideration of information submitted by the public at least
one time annually to address changes and make improvements to the established procedures where applicable. Maintain one webpage,
hotline, or similar method for receipt of information submitted by the public throughout the permit term. Yes
BMP: Conduct training for all the MS4 staff whose primary job duties are related to implementing the construction stormwater program as
described in Part IV.D.4.(b)(6) of the General Permit. Training may be conducted in person or using self-paced training materials such as
videos or reading materials.
Associated Measurable Goal: Conduct a minimum of one training annually for 100% of MS4 staff whose primary job duties are related to
implementing the construction stormwater program. Yes

Page 136

MCM5: Post Construction Stormwater Management in New Development and Redevelopment
Post Construction Stormwater Management in New Development and
Redevelopment BMPs and Measurable Goals
I acknowledge that I understand that my MS4 must implement all the following BMPs and Measurable Goals.
MCM6: Pollution Prevention and Good Housekeeping for Municipal Operation
Pollution Prevention and Good Housekeeping for Municipal Operation BMPs and
Measurable Goals
I acknowledge that I understand that my MS4 must implement all the following BMPs and Measurable Goals.

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 5? No
BMP: Develop and maintain an ordinance or other regulatory mechanism as described in Part IV.D.5.(a)(2) of the General Permit.
Associated Measurable Goal: Review and update the ordinance or other regulatory mechanism at least one time during the permit term to
address changes and make improvements to the ordinance where applicable. Yes
BMP: Document and maintain records of enforcement actions and make them available for review by the TCEQ as described in Part IV.D.5.
(b)(1) of the General Permit.
Associated Measurable Goal: Maintain records of 100% of enforcement actions taken each year. Make 100% of enforcement records available
to TCEQ for review within 24 hours of request. Yes
BMP: Ensure the long term operation and maintenance of structural stormwater control measures installed as described in Part IV.D.5.(b)
(2) of the General Permit.
Associated Measurable Goal: Following a maintenance plan and schedule established by the small MS4 operator, maintain 100% of
stormwater control measures each year where the small MS4 operator is responsible for maintenance. Each year, require 100% of the owners
or operators of any new development or redeveloped sites to develop and implement a maintenance plan addressing maintenance requirement
for any structural control measures installed on site. Require the site owner or operators to maintain documentation, such as a tracking log,
onsite of 100% of the maintenance performed and made available for review by the small MS4 operator or TCEQ within 24 hours of the
request. Yes

Will your MS4 rely on another government entity to help the MS4 meet these requirements for MCM 6? No
BMP: Permittee-owned Facilities and Control Inventory as described by Part IV.D.6.(b)(1) of the General Permit.
Associated Measurable Goal: Develop and maintain an annual inventory for 100% of the small MS4 owned and operated facilities and controls
in the small MS4 area. Review and update the inventory at least one time annually to address changes or additions to the facilities and controls
where applicable. Yes
BMP: Training and Education as described in Part IV.D.6.(b)(2) of the General Permit. Training may be conducted in person or using self-
paced training materials such as videos or reading materials.
Associated Measurable Goal: Conduct a minimum of one training annually for 100% of employees involved in implementing pollution
prevention and good housekeeping practices. For small MS4s which use only contractors to implement pollution prevention and good
housekeeping practices, ensure training of 100% of applicable contract staff is conducted at least one time annually using contract language or
another similar method. Yes
BMP: Disposal of Waste Material as described in Part IV.D.6.(b)(3) of the General Permit.
Associated Measurable Goal: Ensure that 100% of waste from the MS4 is disposed of in accordance with 30 TAC Chapters 330 or 335, as
applicable each year. Yes
BMP: Contractor Requirements and Oversight as described in Part IV.D.6.(b)(4) of the General Permit.
Associated Measurable Goal: Each year, ensure that 100% of contractors hired by the MS4 to perform maintenance activities on permittee-
owned facilities is contractually required to comply with all of the stormwater control measures, good housekeeping practices, and facility-
specific stormwater management operating procedures described in Parts IV D.6.(b)(2)-(6). Implement oversight procedures of contractor
activities in 100% of contracts to ensure that contractors are using appropriate control measures and SOPs each year. Oversight procedures
must be maintained on-site 100% of the time and made available for review by TCEQ within 24 hours of request. Yes
BMP: Assessment of permittee-owned operations as described in Part IV.D.6.(b)(5)a of the General Permit.
Associated Measurable Goal: Evaluate 100% of operation and maintenance activities, in conjunction with procedure reviews if appropriate, for
their potential to discharge pollutants in stormwater annually. Yes
BMP: Identify pollutants of concern as described in Part IV.D.6.(b)(5)b. of the General Permit.
Associated Measurable Goal: Identify pollutants of concern that could be discharged from all of the operation and maintenance activities
described in Part IV.D.6.(b)(5)b and maintain a list of 100% of the pollutants identified. Including for example, metals; chlorides; hydrocarbons
such as benzene, toluene, ethyl benzene, and xylenes; sediment; and trash. Review and update the pollutants of concern list at least one time
annually to address changes or additions to the operation and maintenance activities where applicable. Yes
BMP: Pollution Prevention Measures as described in Part IV.D.6.(b)(5)c. of the General Permit.
Associated Measurable Goal: Develop and implement a set of pollution prevention measures that will reduce the discharge of pollutants in
stormwater from the permittee-owned operations. Yes

Implement at least two of the following pollution prevention measures:
Place barriers around or conduct runoff away from 100% of deicing chemical storage areas to prevent discharge into surface
waters each year.
Track 100% of the application of deicing and anti-icing compounds in the MS4 area and record the amount of compound used
for each application annually.

Page 137

Notes and Additional Information
Certification Information
BMP: Inspection of Pollution Prevention Measures as described in Part IV.D.6.(b)(5)d of the General Permit.
Associated Measurable Goal: At least one time annually, visually inspect 100% of pollution prevention measures implemented at permittee-
owned facilities to ensure they are working properly. Develop and maintain written procedures that describe the frequency of inspections and
how they will be conducted. Review and update the inspection procedures at least one time annually to address changes or additions to the
pollution prevention measures. Maintain a log of 100% of the inspections conducted annually and make the log available for review by the
TCEQ within 24 hours of a request. Yes
BMP: Structural Control Maintenance as described by Part IV.D.6.(b)(6) of the General Permit.
Associated Measurable Goal: At least one time annually, perform maintenance of 100% of the structural controls which require maintenance.
Maintenance must follow a plan and schedule developed by the small MS4 operator to be consistent with maintaining the effectiveness of the
BMP. The permittee shall develop and maintain written procedures that define the frequency of inspections and how they will be conducted.
Review and update the maintenance procedures at least one time annually to address changes or additions to the pollution prevention
measures. Yes

Do you have any notes or additional information you would like TCEQ to know or consider regarding your MS4? No

I certify under penalty of law that this document and all attachments were prepared under my direction, or supervision, in accordance with a system designed to assure that qualified personnel gathered and evaluated the information
submitted. Based upon my inquiry of the person(s) directly responsible for gathering the information, the information submitted is, to the best of my knowledge, true, accurate, and complete. I am aware that there are significant penalties
for submitting false information, including the possibility of a fine and imprisonment for willful violations.