Page 1

March 31, 2026
Texas Commission on Environmental Quality
Stormwater & Pretreatment Team Leader (MC-148)
P.O. Box 13087
Austin, Texas 78711-3087
Re: Phase II MS4 Annual Report Transmittal for
Williamson Travis Counties MUD No. 1
TPDES Authorization: TXR040678
Dear Team Leader:
This letter serves to transmit the required annual report for the Texas Pollutant
Discharge Elimination System Small Municipal Separate Storm Sewer System General
Permit, Authorization Number TXR040678 for Williamson Travis Counties MUD No. 1
The annual report is for Year_7_ - 01/01/2025-12/31/2025
A separate Notice of Change has not been submitted based on the fact that changes
have not been proposed for the next permit year.
As required by the general permit, a copy of the report has been mailed to the TCEQ’s
regional office 12 in Houston, Texas.
Sincerely,
Justin Klump
Municipal Consultant

Page 2

TCEQ-20561 (Rev July 2019)
Page 1
Phase II (Small) MS4 Annual Report Form
TPDES General Permit Number TXR040000
A. General Information
Authorization Number: TXR040528
Reporting Year:___7___
Annual Reporting Year Option Selected by MS4:
Calendar Year: __ X__ _
Permit Year: __N/A____
Fiscal Year: _ N/A___ _ Last day of fiscal year: (_N/A_)
Reporting period beginning date: (month/date/year) __01/01/2025__
Reporting period end date: (month/date/year) __12/31/2025 … MS4 Operator Level: ____2 … Name of MS4: Williamson Travis Counties MUD No. 1
Contact Name: _ Justin Klump … Telephone Number: _ 281.587.5950___
Mailing Address: __16110 Hollister Street, Houston, TX 77066  … E-mail Address: ____ JTKlump@swstx.com … A copy of the annual report was submitted to the TCEQ Region YES_X_ NO___
Region the annual report was submitted to: TCEQ Region __12__

Page 3

TCEQ-20561 (Rev July 2019)
Page 2
B. Status of Compliance with the MS4 GP and SWMP
1. Provide information on the status of complying with permit conditions:
(TXR040000 Part IV.B.2)
Yes
No
Explain
Permittee is currently in compliance with the SWMP as
submitted to and approved by the TCEQ.
X
SWMP submitted by deadline and has
provisional coverage until final approval.
Permittee is currently in compliance with recordkeeping
and reporting requirements.
X
Year 6 annual report has been submitted.
Permittee meets the eligibility requirements of the permit
(e.g., TMDL requirements, Edwards Aquifer limitations,
compliance history, etc.).
X
SWMP and year 6 annual report have
been submitted. No outstanding
deficiencies.
Permittee conducted an annual review of its SWMP in
conjunction with preparation of the annual report
X
SWMP was reviewed per the TXR040000
instructions.
2. Provide a general assessment of the appropriateness of the selected BMPs. You
may use the table below to meet this requirement (see Example 1 in
instructions):
MCM(s)
BMP
BMP is appropriate for reducing the discharge
of pollutants in stormwater (Answer Yes or No
and explain)
1-5
Storm Water Consultant
Yes.
The stormwater consultant is charged with implementing the BMPs as
outlined in the SWMP. Other activities expected of the stormwater
consultant include training sessions during board meetings, preparation
of the annual report, interaction with the TCEQ, attendance at
environmental conferences, etc. Using these vehicles of interaction will
allow the consultant to better educate the Board, consultants, and the
public, and hence, reduce discharge pollutants.

Page 4

TCEQ-20561 (Rev July 2019)
Page 3
1,2,3,5
Training Sessions for District
Consultants and Public
Yes.
Training occurs during the public Board meeting. Training sessions
involve the Board of directors and their consultants; the District
engineer, the attorney, the bookkeeper, and the operator. These
meetings are open to the public as well. Training sessions focus on the
short term and long term goals associated with the SWMP, the status of
implementation of the BMPs, TMDL Implementation in the area, and
modifications needed to better control pollutants in storm water runoff.
2-5
Storm Water Ordinance
Yes.
The Rate Order is currently in place.
2,4
Conveyance Map
Yes.
The map of the District’s conveyance is updated on an ongoing basis.
1,2
Stormwater Website
Yes.
The district’s website is designed to be the focal point of the SWMP’s
public education initiative. The website contains useful information for
reducing stormwater pollution and improving stormwater quality.
Supplemental educational material (typically utility bill inserts) is
designed to direct the residents to the website for more information. The
website contains the District’s previous SWMP, NOI, and previous
annual reports. Once the new SWMP and this annual report are
approved both will be uploaded to the District’s website,
https://wtcmud1.org/.
1
Educational Material
Yes.
Previous annual reports are on the district’s website. Educational
material designed to inform & educate residents and businesses of the
District’s commitment to preventing stormwater pollution currently
exist on this website. The material focuses on stormwater pollution
prevention and how residents can improve the quality of stormwater
leaving the District. Utility bill inserts were mailed to residents and
posted on either this website.
1,2
Community involvement
Yes.
The District Board of Directors had an agenda item for public
discussion during their Board meetings. Residents/visitors may bring up
any stormwater related item for discussion and/or action. Allowing the
public another venue to voice concerns regarding stormwater pollution
will encourage a more cohesive approach in achieving better stormwater
quality. https://wtcmud1.org/ allows residents to report problems to the
district. The district participates in storm drain labeling as well as
community clean-ups.

Page 5

TCEQ-20561 (Rev July 2019)
Page 4
2
Illicit Discharge Detection
and Elimination
Yes.
An illicit discharge, detection, and elimination program is in place.
2-5
Compliance & Regulatory
Inspection Forms
Yes.
The purpose of the compliance and regulatory inspections are to ensure
that maintenance activities, maintenance schedules, and long-term
inspection procedures of stormwater controls are being adhered to and
to ensure that erosion and sediment control practices are being properly
implemented. In an effort to improve stormwater quality, and adhere to
permit requirements.
3
Construction Pollution
Prevention Plan Template
Yes.
The Construction Pollution Prevention Plan Template is used for
construction activities.
3
Regular Maintenance of
District Construction Sites
Yes.
Construction sites within District’s boundaries must adhere to the
Construction General Permit.
4
Post-Construction
Stormwater Maintenance
Yes.
Long term maintenance of post-construction stormwater controls is
required.
5
Operations and Maintenance
Yes.
Monthly operations reports are brought to Board meetings and Board
members are updated on the status of the District’s facilities.
4,5
Regular Maintenance of
Drainage Ways and
Appurtenances
Yes.
It is the District’s responsibility to maintain all storm sewers within
District’s boundaries as well as all drainage ways and appurtenances.
Maintenance of these are performed on a routine basis.
3. Describe progress towards achieving the goal of reducing the discharge of
pollutants to the MEP. If no progress was made or the BMP did not result in a
reduction in pollutants, provide an explanation. Use the table below to meet this
requirement (see Example 2 in instructions):
MCM
BMP
Information
Used
Quantity
Units
Does the BMP
Demonstrate a Direct
Reduction in Pollutants?
(Answer Yes or No and
explain)

Page 6

TCEQ-20561 (Rev July 2019)
Page 5
1
Public
education
Website
1
Uploading
Educational
Material
No. Though this BMP does not result
in a direct reduction of pollutants,
educating the citizens will eventually
reduce litter, hence pollutants.
2
IDDE
Program
Website
0
Utilize
“Contact Us”
on District
Website
Yes. When residents observe an illicit
discharge and use the website’s
reporting mechanism, it reduces the
amount the pollutant that would have
been otherwise unaddressed.
3
Construction
Site Runoff
Control
Program
Construction Sites
All
Inspections
Yes. Inspections allow for determining
if proper BMPs are in place to reduce
sediment discharge and erosion.
3
Construction
Site Runoff
Control
Program
NOIs
All received
by MS4
Operator
Reviews
Yes. By ensuring contractors have
permit coverage, we can evaluate if the
SWPPP is effective in reducing
sediment discharge and erosion.
4
Post
Construction
Stormwater
Maintenance
Program
Plans
All received
by MS4
Operator
Reviews
No. The pollutants will be reduced over
time as the permanent post-
construction BMPs are utilized.
5
Operations &
Maintenance
Program
Board Reports
12
Condition of
District
Facilities
Yes. Proper condition of the District
facilities is critical for meeting permit
standards on a consistent basis.
4,5
Maintenance
of District
Facilities
Drainage ways
and
appurtenances
All
Mowing,
maintenance,
and erosion
control
Yes. Proper mowing and maintenance
of drainage ways and appurtenances
reduces erosion and prevents silt from
entering into waterways.
1,2,3,5
Training
SWMP
2
Board
Meetings
No. Though this BMP does not result
in a direct reduction of pollutants,
educating and training the citizens MS4
Operator consultants and will inform
both groups how to improve
stormwater quality.
4. Provide the measurable goals for each of the MCMs, and an evaluation of the
success of the implementation of the measurable goals (see Example 3 in
instructions):

Page 7

TCEQ-20561 (Rev July 2019)
Page 6
MCM(s)
Measurable
Goal(s)
Explain progress toward goal or how goal was
achieved.
If goal was not accomplished, please explain.
1-5
Stormwater
Consultant
The District retained the services of a Stormwater Consultant who is responsible
for implementing Best Management Practices.
1,2,3,5
Training Sessions for
District Consultants
and Public
Training occurs during the public Board meeting. Training sessions involve the
Board of directors and their consultants; the District engineer, the attorney, the
bookkeeper, and the operator. These meetings are open to the public as well.
Training sessions focus on the short term and long term goals associated with
the SWMP, the status of implementation of the BMPs, TMDL Implementation
in the area, and modifications needed to better control pollutants in storm water
runoff.
2-5
Storm Water
Ordinance
The Rate Order is currently in place.
2,4
Conveyance Map
The map of the District’s conveyance is updated on an ongoing basis.
1,2
Stormwater Website
The district’s website is designed to be the focal point of the SWMP’s public
education initiative. The website contains useful information for reducing
stormwater pollution and improving stormwater quality. Supplemental
educational material (typically utility bill inserts) is designed to direct the
residents to the website for more information. The website contains the
District’s previous SWMP, NOI, and previous annual reports. Once the new
SWMP and this annual report are approved both will be uploaded to the
District’s website, https://wtcmud1.org/.
1
Educational Material
Previous annual reports are on the district’s website. Educational material
designed to inform & educate residents and businesses of the District’s
commitment to preventing stormwater pollution currently exist on this website.
The material focuses on stormwater pollution prevention and how residents can
improve the quality of stormwater leaving the District. Utility bill inserts were
mailed to residents and posted on either this website.
1,2
Community
involvement
The District Board of Directors had an agenda item for public discussion during
their Board meetings. Residents/visitors may bring up any stormwater related
item for discussion and/or action. Allowing the public another venue to voice
concerns regarding stormwater pollution will encourage a more cohesive
approach in achieving better stormwater quality. https://wtcmud1.org/ allows
residents to report problems to the district. The district participates in storm
drain labeling as well as community clean-ups.
2
Illicit Discharge
Detection and
Elimination
An illicit discharge, detection, and elimination program is in place.

Page 8

TCEQ-20561 (Rev July 2019)
Page 7
2-5
Compliance &
Regulatory
Inspection Forms
The purpose of the compliance and regulatory inspections are to ensure that
maintenance activities, maintenance schedules, and long-term inspection
procedures of stormwater controls are being adhered to and to ensure that
erosion and sediment control practices are being properly implemented. In an
effort to improve stormwater quality, and adhere to permit requirements.
3
Construction
Pollution Prevention
Plan Template
The Construction Pollution Prevention Plan Template is used for construction
activities.
3
Regular Maintenance
of District
Construction Sites
Construction sites within District’s boundaries must adhere to the Construction
General Permit.
4
Post-Construction
Stormwater
Maintenance
Long term maintenance of post-construction stormwater controls is required.
5
Operations and
Maintenance
Monthly operations reports are brought to Board meetings and Board members
are updated on the status of the District’s facilities.
4,5
Regular Maintenance
of Drainage Ways
and Appurtenances
It is the District’s responsibility to maintain all storm sewers within District’s
boundaries as well as all drainage ways and appurtenances. Maintenance of
these are performed on a routine basis.
C. Stormwater Data Summary
Provide a summary of all information used, including any lab results (if sampling was
conducted) to assess the success of the SWMP at reducing the discharge of pollutants to
the MEP. For example, did the MS4 conduct visual inspections, clean the inlets, look for
illicit discharge, clean streets, look for flow during dry weather, etc.?
The District did not perform analytical monitoring of stormwater quality during year 7.
The district website contains educational material relative to stormwater quality. The
site is mobile friendly, which allows residents to report illicit discharges and
construction site runoff concerns in a quicker, easier fashion.

Board of Directors and consultants were educated/trained on the goals of the SWMP
during public Board meeting.

Continued to update stormwater conveyance map as necessary.
Maintenance of District drainage ways and appurtenances are done on an as-needed
basis by qualified personnel.

Page 9

TCEQ-20561 (Rev July 2019)
Page 8
D. Impaired Waterbodies
1. Identify whether an impaired water within the permitted area was added to the
latest EPA-approved 303(d) list or the Texas Integrated Report of Surface Water
Quality for CWA Sections 305(b) and 303(d). List any newly-identified impaired
waters below by including the name of the water body and the cause of
impairment.
Williamson-Travis Counties MUD 1 neither directly nor indirectly discharges into a
TMDL-impaired water-body. Additionally, this District does not discharge directly into
an impaired stream listed on the 303(d) list.
2. If applicable, explain below any activities taken to address the discharge to
impaired waterbodies, including any sampling results and a summary of the small
MS4’s BMPs used to address the pollutant of concern.
N/A
3. Describe the implementation of targeted controls if the small MS4 discharges to an
impaired water body with an approved TMDL.
N/A
4. Report the benchmark identified by the MS4 and assessment activities:
Benchmark
Parameter
(Ex: Total
Suspended
Solids)
Benchmark
Value
Description of additional
sampling or other assessment
activities
Year(s)
conducted
N/A
N/A
N/A
N/A
5. Provide an analysis of how the selected BMPs will be effective in contributing to
achieving the benchmark:
Benchmark
Parameter
Selected BMP
Contribution to achieving
Benchmark
N/A
N/A
N/A

Page 10

TCEQ-20561 (Rev July 2019)
Page 9
6. If applicable, report on focused BMPs to address impairment for bacteria:
Description of
bacteria-focused BMP
Comments/Discussion
N/A
N/A
7. Assess the progress to determine BMP’s effectiveness in achieving the benchmark.
Benchmark Indicator
Description/Comments
N/A
N/A
E. Stormwater Activities
Describe activities planned for the next reporting year:
A new SWMP has been written pursuant to the Small MS4 Permit issued on August 15,
2024. The NOI is currently under review. Implementation efforts will continue this year
and be recorded in the year 1 annual report under the new permit term.
F. SWMP Modifications
1. The SWMP and MCM implementation procedures are reviewed each year.
__X_ Yes ___No
2. Changes have been made or are proposed to the SWMP since the NOI or the last
annual report, including changes in response to TCEQ’s review.
___ Yes _X__No
If “Yes,” report on changes made to measurable goals and BMPs:
MCM(s)
Measurable
Goal(s) or BMP(s)
Implemented or Proposed Changes
(Submit NOC as needed)
N/A
N/A
N/A
Note: If changes include additions or substitutions of BMPs, include a written analysis
explaining why the original BMP is ineffective or not feasible, and why the replacement
BMP is expected to achieve the goals of the original BMP.
3. Explain additional changes or proposed changes not previously mentioned (i.e.
dates, contacts, procedures, annexation of land, etc.).

Page 11

TCEQ-20561 (Rev July 2019)
Page 10
G. Additional BMPs for TMDLs and I-Plans
Provide a description and schedule for implementation of additional BMPs that may be
necessary, based on monitoring results, to ensure compliance with applicable TMDLs and
implementation plans.
BMP
Description
Implementation
Schedule (start
date, etc.)
Status/Completion Date
(completed, in progress,
not started)
All
N/A
N/A
Additional BMPs not deemed necessary.
H. Additional Information
1. Is the permittee relying on another entity to satisfy any permit obligations?
___ Yes __X_ No
If “Yes,” provide the name(s) of other entities and an explanation of their
responsibilities (add more spaces or pages if needed).
2.a. Is the permittee part of a group sharing a SWMP with other entities?
___ Yes _X_ No
2.b. If “yes,” is this a system-wide annual report including information for all
permittees?
___ Yes _X_ No
If “Yes,” list all associated authorization numbers, permittee names, and SWMP
responsibilities of each member (add additional spaces or pages if needed):N/A

Page 12

TCEQ-20561 (Rev July 2019)
Page 11
I. Construction Activities
1. The number of construction activities that occurred in the jurisdictional area of the
MS4 (Large and Small Site Notices submitted by construction site operators):
__0__
2a. Does the permittee utilize the optional seventh MCM related to construction?
___ Yes _X_ No
2b. If “yes,” then provide the following information for this permit year:
The number of municipal construction activities
authorized under this general permit
The total number of acres disturbed for municipal
construction projects
N/A
Note: Though the seventh MCM is optional, implementation must be requested on
the NOI or on a NOC and approved by the TCEQ.

Page 13

J. Certificatio
If this is this
a system-wide annual report including information for all permittees, each
permittee shall sign
and certify the annual report in accordance with 30 TAC §305.128
(relating to Signatories to Reports).
I certify under penalty of law that this document and all attachments were prepared
under my direction lor supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted, Based
on my inquiry of the person or persons who manage the system, or those persons
directly responsible| for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete. I am aware that there
are significant penalties for submitting false information, including the possibility of fine
and imprisonment for knowing violations.
Name (printed): | aan
Songs
Title: (OTC Mwd
4 President
Signature:
t Dh oe
Date: x- [9 -0l@
9)
Name of MS4: Williamson Travis Counties MUD No. 1 - TXRO40678
TCEQ-20561 (Rev July 2019)
Page 12