Phase II (Small) MS4 Annual Report Form (Year 7)
Unofficial searchable copy. For the official record, use the district’s own copy.
2026document2026-03-31 2026-03-312026-03-31-doc-phase-ii-small-ms4-annual-report-form-year-72026-03-31Page 1
March 31, 2026 Texas Commission on Environmental Quality Stormwater & Pretreatment Team Leader (MC-148) P.O. Box 13087 Austin, Texas 78711-3087 Re: Phase II MS4 Annual Report Transmittal for Williamson Travis Counties MUD No. 1 TPDES Authorization: TXR040678 Dear Team Leader: This letter serves to transmit the required annual report for the Texas Pollutant Discharge Elimination System Small Municipal Separate Storm Sewer System General Permit, Authorization Number TXR040678 for Williamson Travis Counties MUD No. 1 The annual report is for Year_7_ - 01/01/2025-12/31/2025 A separate Notice of Change has not been submitted based on the fact that changes have not been proposed for the next permit year. As required by the general permit, a copy of the report has been mailed to the TCEQ’s regional office 12 in Houston, Texas. Sincerely, Justin Klump Municipal Consultant
Page 2
TCEQ-20561 (Rev July 2019) Page 1 Phase II (Small) MS4 Annual Report Form TPDES General Permit Number TXR040000 A. General Information Authorization Number: TXR040528 Reporting Year:___7___ Annual Reporting Year Option Selected by MS4: Calendar Year: __ X__ _ Permit Year: __N/A____ Fiscal Year: _ N/A___ _ Last day of fiscal year: (_N/A_) Reporting period beginning date: (month/date/year) __01/01/2025__ Reporting period end date: (month/date/year) __12/31/2025 … MS4 Operator Level: ____2 … Name of MS4: Williamson Travis Counties MUD No. 1 Contact Name: _ Justin Klump … Telephone Number: _ 281.587.5950___ Mailing Address: __16110 Hollister Street, Houston, TX 77066 … E-mail Address: ____ JTKlump@swstx.com … A copy of the annual report was submitted to the TCEQ Region YES_X_ NO___ Region the annual report was submitted to: TCEQ Region __12__
Page 3
TCEQ-20561 (Rev July 2019) Page 2 B. Status of Compliance with the MS4 GP and SWMP 1. Provide information on the status of complying with permit conditions: (TXR040000 Part IV.B.2) Yes No Explain Permittee is currently in compliance with the SWMP as submitted to and approved by the TCEQ. X SWMP submitted by deadline and has provisional coverage until final approval. Permittee is currently in compliance with recordkeeping and reporting requirements. X Year 6 annual report has been submitted. Permittee meets the eligibility requirements of the permit (e.g., TMDL requirements, Edwards Aquifer limitations, compliance history, etc.). X SWMP and year 6 annual report have been submitted. No outstanding deficiencies. Permittee conducted an annual review of its SWMP in conjunction with preparation of the annual report X SWMP was reviewed per the TXR040000 instructions. 2. Provide a general assessment of the appropriateness of the selected BMPs. You may use the table below to meet this requirement (see Example 1 in instructions): MCM(s) BMP BMP is appropriate for reducing the discharge of pollutants in stormwater (Answer Yes or No and explain) 1-5 Storm Water Consultant Yes. The stormwater consultant is charged with implementing the BMPs as outlined in the SWMP. Other activities expected of the stormwater consultant include training sessions during board meetings, preparation of the annual report, interaction with the TCEQ, attendance at environmental conferences, etc. Using these vehicles of interaction will allow the consultant to better educate the Board, consultants, and the public, and hence, reduce discharge pollutants.
Page 4
TCEQ-20561 (Rev July 2019) Page 3 1,2,3,5 Training Sessions for District Consultants and Public Yes. Training occurs during the public Board meeting. Training sessions involve the Board of directors and their consultants; the District engineer, the attorney, the bookkeeper, and the operator. These meetings are open to the public as well. Training sessions focus on the short term and long term goals associated with the SWMP, the status of implementation of the BMPs, TMDL Implementation in the area, and modifications needed to better control pollutants in storm water runoff. 2-5 Storm Water Ordinance Yes. The Rate Order is currently in place. 2,4 Conveyance Map Yes. The map of the District’s conveyance is updated on an ongoing basis. 1,2 Stormwater Website Yes. The district’s website is designed to be the focal point of the SWMP’s public education initiative. The website contains useful information for reducing stormwater pollution and improving stormwater quality. Supplemental educational material (typically utility bill inserts) is designed to direct the residents to the website for more information. The website contains the District’s previous SWMP, NOI, and previous annual reports. Once the new SWMP and this annual report are approved both will be uploaded to the District’s website, https://wtcmud1.org/. 1 Educational Material Yes. Previous annual reports are on the district’s website. Educational material designed to inform & educate residents and businesses of the District’s commitment to preventing stormwater pollution currently exist on this website. The material focuses on stormwater pollution prevention and how residents can improve the quality of stormwater leaving the District. Utility bill inserts were mailed to residents and posted on either this website. 1,2 Community involvement Yes. The District Board of Directors had an agenda item for public discussion during their Board meetings. Residents/visitors may bring up any stormwater related item for discussion and/or action. Allowing the public another venue to voice concerns regarding stormwater pollution will encourage a more cohesive approach in achieving better stormwater quality. https://wtcmud1.org/ allows residents to report problems to the district. The district participates in storm drain labeling as well as community clean-ups.
Page 5
TCEQ-20561 (Rev July 2019) Page 4 2 Illicit Discharge Detection and Elimination Yes. An illicit discharge, detection, and elimination program is in place. 2-5 Compliance & Regulatory Inspection Forms Yes. The purpose of the compliance and regulatory inspections are to ensure that maintenance activities, maintenance schedules, and long-term inspection procedures of stormwater controls are being adhered to and to ensure that erosion and sediment control practices are being properly implemented. In an effort to improve stormwater quality, and adhere to permit requirements. 3 Construction Pollution Prevention Plan Template Yes. The Construction Pollution Prevention Plan Template is used for construction activities. 3 Regular Maintenance of District Construction Sites Yes. Construction sites within District’s boundaries must adhere to the Construction General Permit. 4 Post-Construction Stormwater Maintenance Yes. Long term maintenance of post-construction stormwater controls is required. 5 Operations and Maintenance Yes. Monthly operations reports are brought to Board meetings and Board members are updated on the status of the District’s facilities. 4,5 Regular Maintenance of Drainage Ways and Appurtenances Yes. It is the District’s responsibility to maintain all storm sewers within District’s boundaries as well as all drainage ways and appurtenances. Maintenance of these are performed on a routine basis. 3. Describe progress towards achieving the goal of reducing the discharge of pollutants to the MEP. If no progress was made or the BMP did not result in a reduction in pollutants, provide an explanation. Use the table below to meet this requirement (see Example 2 in instructions): MCM BMP Information Used Quantity Units Does the BMP Demonstrate a Direct Reduction in Pollutants? (Answer Yes or No and explain)
Page 6
TCEQ-20561 (Rev July 2019) Page 5 1 Public education Website 1 Uploading Educational Material No. Though this BMP does not result in a direct reduction of pollutants, educating the citizens will eventually reduce litter, hence pollutants. 2 IDDE Program Website 0 Utilize “Contact Us” on District Website Yes. When residents observe an illicit discharge and use the website’s reporting mechanism, it reduces the amount the pollutant that would have been otherwise unaddressed. 3 Construction Site Runoff Control Program Construction Sites All Inspections Yes. Inspections allow for determining if proper BMPs are in place to reduce sediment discharge and erosion. 3 Construction Site Runoff Control Program NOIs All received by MS4 Operator Reviews Yes. By ensuring contractors have permit coverage, we can evaluate if the SWPPP is effective in reducing sediment discharge and erosion. 4 Post Construction Stormwater Maintenance Program Plans All received by MS4 Operator Reviews No. The pollutants will be reduced over time as the permanent post- construction BMPs are utilized. 5 Operations & Maintenance Program Board Reports 12 Condition of District Facilities Yes. Proper condition of the District facilities is critical for meeting permit standards on a consistent basis. 4,5 Maintenance of District Facilities Drainage ways and appurtenances All Mowing, maintenance, and erosion control Yes. Proper mowing and maintenance of drainage ways and appurtenances reduces erosion and prevents silt from entering into waterways. 1,2,3,5 Training SWMP 2 Board Meetings No. Though this BMP does not result in a direct reduction of pollutants, educating and training the citizens MS4 Operator consultants and will inform both groups how to improve stormwater quality. 4. Provide the measurable goals for each of the MCMs, and an evaluation of the success of the implementation of the measurable goals (see Example 3 in instructions):
Page 7
TCEQ-20561 (Rev July 2019) Page 6 MCM(s) Measurable Goal(s) Explain progress toward goal or how goal was achieved. If goal was not accomplished, please explain. 1-5 Stormwater Consultant The District retained the services of a Stormwater Consultant who is responsible for implementing Best Management Practices. 1,2,3,5 Training Sessions for District Consultants and Public Training occurs during the public Board meeting. Training sessions involve the Board of directors and their consultants; the District engineer, the attorney, the bookkeeper, and the operator. These meetings are open to the public as well. Training sessions focus on the short term and long term goals associated with the SWMP, the status of implementation of the BMPs, TMDL Implementation in the area, and modifications needed to better control pollutants in storm water runoff. 2-5 Storm Water Ordinance The Rate Order is currently in place. 2,4 Conveyance Map The map of the District’s conveyance is updated on an ongoing basis. 1,2 Stormwater Website The district’s website is designed to be the focal point of the SWMP’s public education initiative. The website contains useful information for reducing stormwater pollution and improving stormwater quality. Supplemental educational material (typically utility bill inserts) is designed to direct the residents to the website for more information. The website contains the District’s previous SWMP, NOI, and previous annual reports. Once the new SWMP and this annual report are approved both will be uploaded to the District’s website, https://wtcmud1.org/. 1 Educational Material Previous annual reports are on the district’s website. Educational material designed to inform & educate residents and businesses of the District’s commitment to preventing stormwater pollution currently exist on this website. The material focuses on stormwater pollution prevention and how residents can improve the quality of stormwater leaving the District. Utility bill inserts were mailed to residents and posted on either this website. 1,2 Community involvement The District Board of Directors had an agenda item for public discussion during their Board meetings. Residents/visitors may bring up any stormwater related item for discussion and/or action. Allowing the public another venue to voice concerns regarding stormwater pollution will encourage a more cohesive approach in achieving better stormwater quality. https://wtcmud1.org/ allows residents to report problems to the district. The district participates in storm drain labeling as well as community clean-ups. 2 Illicit Discharge Detection and Elimination An illicit discharge, detection, and elimination program is in place.
Page 8
TCEQ-20561 (Rev July 2019) Page 7 2-5 Compliance & Regulatory Inspection Forms The purpose of the compliance and regulatory inspections are to ensure that maintenance activities, maintenance schedules, and long-term inspection procedures of stormwater controls are being adhered to and to ensure that erosion and sediment control practices are being properly implemented. In an effort to improve stormwater quality, and adhere to permit requirements. 3 Construction Pollution Prevention Plan Template The Construction Pollution Prevention Plan Template is used for construction activities. 3 Regular Maintenance of District Construction Sites Construction sites within District’s boundaries must adhere to the Construction General Permit. 4 Post-Construction Stormwater Maintenance Long term maintenance of post-construction stormwater controls is required. 5 Operations and Maintenance Monthly operations reports are brought to Board meetings and Board members are updated on the status of the District’s facilities. 4,5 Regular Maintenance of Drainage Ways and Appurtenances It is the District’s responsibility to maintain all storm sewers within District’s boundaries as well as all drainage ways and appurtenances. Maintenance of these are performed on a routine basis. C. Stormwater Data Summary Provide a summary of all information used, including any lab results (if sampling was conducted) to assess the success of the SWMP at reducing the discharge of pollutants to the MEP. For example, did the MS4 conduct visual inspections, clean the inlets, look for illicit discharge, clean streets, look for flow during dry weather, etc.? The District did not perform analytical monitoring of stormwater quality during year 7. The district website contains educational material relative to stormwater quality. The site is mobile friendly, which allows residents to report illicit discharges and construction site runoff concerns in a quicker, easier fashion. Board of Directors and consultants were educated/trained on the goals of the SWMP during public Board meeting. Continued to update stormwater conveyance map as necessary. Maintenance of District drainage ways and appurtenances are done on an as-needed basis by qualified personnel.
Page 9
TCEQ-20561 (Rev July 2019) Page 8 D. Impaired Waterbodies 1. Identify whether an impaired water within the permitted area was added to the latest EPA-approved 303(d) list or the Texas Integrated Report of Surface Water Quality for CWA Sections 305(b) and 303(d). List any newly-identified impaired waters below by including the name of the water body and the cause of impairment. Williamson-Travis Counties MUD 1 neither directly nor indirectly discharges into a TMDL-impaired water-body. Additionally, this District does not discharge directly into an impaired stream listed on the 303(d) list. 2. If applicable, explain below any activities taken to address the discharge to impaired waterbodies, including any sampling results and a summary of the small MS4’s BMPs used to address the pollutant of concern. N/A 3. Describe the implementation of targeted controls if the small MS4 discharges to an impaired water body with an approved TMDL. N/A 4. Report the benchmark identified by the MS4 and assessment activities: Benchmark Parameter (Ex: Total Suspended Solids) Benchmark Value Description of additional sampling or other assessment activities Year(s) conducted N/A N/A N/A N/A 5. Provide an analysis of how the selected BMPs will be effective in contributing to achieving the benchmark: Benchmark Parameter Selected BMP Contribution to achieving Benchmark N/A N/A N/A
Page 10
TCEQ-20561 (Rev July 2019) Page 9 6. If applicable, report on focused BMPs to address impairment for bacteria: Description of bacteria-focused BMP Comments/Discussion N/A N/A 7. Assess the progress to determine BMP’s effectiveness in achieving the benchmark. Benchmark Indicator Description/Comments N/A N/A E. Stormwater Activities Describe activities planned for the next reporting year: A new SWMP has been written pursuant to the Small MS4 Permit issued on August 15, 2024. The NOI is currently under review. Implementation efforts will continue this year and be recorded in the year 1 annual report under the new permit term. F. SWMP Modifications 1. The SWMP and MCM implementation procedures are reviewed each year. __X_ Yes ___No 2. Changes have been made or are proposed to the SWMP since the NOI or the last annual report, including changes in response to TCEQ’s review. ___ Yes _X__No If “Yes,” report on changes made to measurable goals and BMPs: MCM(s) Measurable Goal(s) or BMP(s) Implemented or Proposed Changes (Submit NOC as needed) N/A N/A N/A Note: If changes include additions or substitutions of BMPs, include a written analysis explaining why the original BMP is ineffective or not feasible, and why the replacement BMP is expected to achieve the goals of the original BMP. 3. Explain additional changes or proposed changes not previously mentioned (i.e. dates, contacts, procedures, annexation of land, etc.).
Page 11
TCEQ-20561 (Rev July 2019) Page 10 G. Additional BMPs for TMDLs and I-Plans Provide a description and schedule for implementation of additional BMPs that may be necessary, based on monitoring results, to ensure compliance with applicable TMDLs and implementation plans. BMP Description Implementation Schedule (start date, etc.) Status/Completion Date (completed, in progress, not started) All N/A N/A Additional BMPs not deemed necessary. H. Additional Information 1. Is the permittee relying on another entity to satisfy any permit obligations? ___ Yes __X_ No If “Yes,” provide the name(s) of other entities and an explanation of their responsibilities (add more spaces or pages if needed). 2.a. Is the permittee part of a group sharing a SWMP with other entities? ___ Yes _X_ No 2.b. If “yes,” is this a system-wide annual report including information for all permittees? ___ Yes _X_ No If “Yes,” list all associated authorization numbers, permittee names, and SWMP responsibilities of each member (add additional spaces or pages if needed):N/A
Page 12
TCEQ-20561 (Rev July 2019) Page 11 I. Construction Activities 1. The number of construction activities that occurred in the jurisdictional area of the MS4 (Large and Small Site Notices submitted by construction site operators): __0__ 2a. Does the permittee utilize the optional seventh MCM related to construction? ___ Yes _X_ No 2b. If “yes,” then provide the following information for this permit year: The number of municipal construction activities authorized under this general permit The total number of acres disturbed for municipal construction projects N/A Note: Though the seventh MCM is optional, implementation must be requested on the NOI or on a NOC and approved by the TCEQ.
Page 13
J. Certificatio If this is this a system-wide annual report including information for all permittees, each permittee shall sign and certify the annual report in accordance with 30 TAC §305.128 (relating to Signatories to Reports). I certify under penalty of law that this document and all attachments were prepared under my direction lor supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted, Based on my inquiry of the person or persons who manage the system, or those persons directly responsible| for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Name (printed): | aan Songs Title: (OTC Mwd 4 President Signature: t Dh oe Date: x- [9 -0l@ 9) Name of MS4: Williamson Travis Counties MUD No. 1 - TXRO40678 TCEQ-20561 (Rev July 2019) Page 12