WTC MUD #1 RecordsBoard minutes, agendas and votes

WTC MUD 1 - 5-Yr Park Master Plan

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

WTC MUD NO.1
PARKS MASTER
PLAN 2022

Page 2

Page intentionally left blank

Page 3

WTC MUD No. 1 Parks Master Plan | C
Acknowledgements
  Board & Staff:
Catherine Frank, President
Art Medrano, Vice President
Beth Jones, Secretary
Megan Dudo, Treasurer
Linda Fabre
Herb Edmonson, District Engineer, Gray Engineering Inc.
Michael Luft, District Accountant, Inframark
Makenzi Scales, District Account Manager, Inframark
Advisory Committee:
Megan Dudo
Beth Jones
Jana Ramirez
Julie Potts
Emilee Blackburn
Carrol Norrell
Gerald Burgess
Special thanks to:
The community members that contributed their time, energy, and attention to the community engagement process.
Consultant Team:
Kevin Shepherd
Tim Wright, PE
Ryan Lozano
AJ Fawver
Marshall Hines

Page 4

Page intentionally left blank

Page 5

Table of Contents
Context and Rationale
INTRODUCTION
1
SURROUNDING PARKS
6
Strategy & Implementation
5-YEAR PARK GOALS
32
MEETING PARK NEEDS
33
WTC MUD No. 1 Parks
EXISTING CONDITIONS
10
INDIVIDUAL PARK ASSESSMENTS
15
ANDERSON MILL WEST PARK
15
ASTER PARK
17
LAKELINE OAKS PARK
18
OLD MILL PARK
19
SUN CHASE PARK
20
VOLENTE HILLS PARK
21
ANDERSON MILL POND
22
ASTER PASS POND
23
CASHELL WOOD POND
24
HATCH POND
25
LITTLE ELM POND
26
LONDON LANE POND
27
MADELINE LOOP POND
28
VESTAVIA RIDGE POND
29
ACTION & MEASUREMENT
34
IMPLEMENTATION MATRIX
35
FUNDING & COMMUNITY INVOLVEMENT
38
IMPLEMENTATION BY YEAR
39
Appendix A – Community Engagement
Appendix B – Anderson Mill West Park Exhibit
SEE WTC MUD WEBSITE
SEE WTC MUD WEBSITE

Page 6

Page intentionally left blank

Page 7

1.0
CONTEXT &
RATIONALE

Page 8

Page intentionally left blank

Page 9

WTC MUD No. 1 Parks Master Plan | 1
Introduction
What is a MUD?
Municipal Utility Districts (MUDs) are one type
of special purpose government and taxing
jurisdiction allowed under Texas law. MUDs are
governed by a publicly elected Board of Directors
and have the fundamental responsibility of
providing water and wastewater services to
residents, along with complementary services
to sustain property values and support the
needs of the community. MUD governments
are overseen by the Texas Commission on
Environmental Quality.
 , referred to here on out as the
“District”, was created in 1985. The District
sits on approximately 562 acres of land and
straddles both Williamson and Travis counties
in central Texas. Tucked between the City of
Austin and the City of Cedar Park, residents
of WTC MUD 1 benefit from living in one of the
most sought after and fastest growing metro
areas in the country. WTC MUD 1 offers a range
of single-family housing sizes and options and
four mature neighborhoods.
The District owns and operates 6 parks and 8
stormwater ponds that double as additional
park and recreation space. Over the years the
District has prepared several park plans to
help guide investments in and budgeting for
its park system. The last planning document
was prepared in 2012. The process to prepare
this updated plan was intended to incorporate
extensive public input to ensure that future
investments reflect the specific needs of the
community and maximize park amenities for
all residents.
Goals
The District had three major goals for this
planning process:
Engage and Interact with the Community
Past District planning processes involved
minimal
public
engagement,
and
what
engagement did occur didn’t happen until late
in the process. With this process, the District
wanted the community to be co-creators of the
document and to be involved from beginning to
end so that future budgeting decisions can be
more aligned with residents’ values and goals
for the park system.
Develop a Realistic
Implementation Strategy
Given the size and organizational composition
the District, it was important that the planning
document provided realistic and reasonable
guidance for future decisions about the park
system. Recommended future projects needed
to be aligned with resource availability—both
in terms of funding and human resources—and
should incorporate options for community-led
implementation.
Align Budgeting for Parks with Desired
Outcomes
Funding
for
the
District’s
park
system
overwhelmingly comes from tax dollars and
maintenance and improvement projects alike
are built into the District’s annual budget. The
District wanted to better ensure that public funds
are spent in accordance with the community’s
desired outcomes for its park system.

Page 10

2 | WTC MUD No. 1 Parks Master Plan
Importance of Parks
According to the National Recreation and
Parks Association (NRPA) report on why parks
are essential public services there are three
primary values that parks bring to communities
that make them essential to communities:
• Economic value
• Health and environmental benefits
• Social importance
(Source: NRPA)
The District has shown a commitment to the
importance of parks over the years, viewing the
parks system as essential infrastructure just
like water, and sewer. Engagement from this
plan also puts parks around the top of the list
when it comes to the quality of life for District
residents.
Economic Value
Parks have the potential to improve the local
tax base and increase property values. It is
well documented that many private property
values can increase the closer such land is
to quality community parks. This increase in
private property value due to the proximity to
parks has the potential to increase property
tax revenues which improves local economies.
(source: NRPA) A Texas A&M review of 25 studies
investigating whether parks and open space
contributed positively to the property values of
surrounding properties found that 20 of the 25
studies found that property values were higher.
(source: NRPA)
Health & Environmental Benefits
Parks are a place where people go to get healthy
and stay fit. They contribute to the health and
wellness of people of all ages. According to
studies by the Centers for Disease Control and
Prevention, creating, improving, and promoting
places to be physically active can improve
individual and community health and result in
a 25 percent increase of residents who exercise
at least three times per week. Another study
by Penn State University showed significant
correlations to reductions in stress, lowered
blood pressure, and perceived physical health
to the length of stay in visits to parks. (source:
NRPA)
Sun Chase Park

Page 11

WTC MUD No. 1 Parks Master Plan | 3
Social Importance
Parks are a tangible reflection of the quality of life
in a community. They help build a community
identity for citizens and are a major factor
in the perception of quality of life. Parks and
recreation services are often cited as one of the
most important factors in surveys of how livable
communities are (source: NRPA). The District is
no different. From the initial community survey,
around 80 percent of respondents agreed or
strongly agreed that District parks are valuable
parts of the community. Additionally, 75
percent of respondents said that parks were a
good place to socialize. As a part of the social
fabric in the District, the current parks system
has the potential to grow not only into a hub
for gathering, but for environmental education
experiences for both school age and adult
residents.
Plan Development
The park planning process began in early spring
of 2021 and was completed in the summer of
2022. The planning team was comprised of the
District’s consultant, Verdunity, and a 7-member
resident advisory committee, which included
the two members of the District’s standing Parks
Committee and 5 residents who represented
each of the District’s neighborhoods.
The planning process included four phases,
each of which included opportunities for public
input and involvement. The results of all public
input can be viewed in Appendix A.
Phase 1: Discovery
In the first phase of the process, the planning
team began evaluation of existing conditions
in and use of the parks, reviewed background
data, and gathered input from residents on
future directions.
Formal Opportunities for Public Input in Phase 1:
•
Consultant Site Visit—Residents were invited
to tour the parks with the planning team and
talk directly with members of the team.
•
Focus Groups—Took place the same day as
the site visit and aimed to gather input from
several key interest groups
•
Community Survey #1: Gathered input
on current park usage, opportunities and
challenges associated with the current park
system, and general preferences for the
future.
Phase 2: Idea Exploration
Based on the outcomes from Phase 1, the
planning team began to explore options for
ways to improve the District’s park system and
sought input on how to prioritize future projects.
Formal Opportunities for Public Input in Phase 2:
•
Park Workshops: The District hosted four
workshops for five of the parks for which the
planning team felt it needed more input:
Hatch Pond, Aster Park, Old Mill (Gazebo)
Park, and Cashell Wood Pond/Volente Hills
Pocket Park.
•
Community Survey #2: Gathered input on
which types of projects to prioritize over
the next five years and gauged residents’
attitudes about budgeting/spending for
parks.

Page 12

4 | WTC MUD No. 1 Parks Master Plan
Phase 3: Develop the Plan
This phase of the process was focused on
developing a realistic, 5-year implementation
strategy for improving District parks and ponds
based on the community’s desired outcomes.
Formal Opportunities for Public Input in Phase 3:
•
Public Review and Input on Draft Plan: After
the plan was publicly presented to the
District’s Board of Directors there followed a
public comment period to collect feedback
prior to adoption.
Phase 4: Adopt and Implement
Last, the Board adopted the plan and finished
out the fiscal year by kicking off implementation
by pursing several key projects.
Formal Opportunities for Public Input in Phase
4:
•
Involvement in Plan Implementation: As
described in the Implementation Plan
on pages 45-54, there are numerous
opportunities for residents to get involved in
shaping the future of our park system.
Community Surveys serve to gather the
genuine,
unflitered,
thoughts,
opinions,
sentiments, and feelings of the residents that
are going to be interacting and using the MUD
parks each and every day.
A
detailed
report
on
the
community
engagement effort for this plan can be seen
in Appendix A. Data from this effort has
been refined and reported in the Strategy
& Implementation section of this document
beginning on page 31.
District Population Characteristics
At the time of the 2022 US Census, the District’s
population was approximately 5,478*. The
District has two Leander ISD elementary
schools within its boundaries and all District
properties are within walking or biking
distance of both Cedar Park Middle School
and Cedar Park High School, which adds to
the District’s desirability as a place to raise
children.
Based on data from the three 2020 US
Census Tracts that overlap the District, The
District’s age composition is approximately as
follows (percentages are an average of the
percentages for the three Census Tracts that
comprise the District):
•
Children/minors comprise roughly 29%
of the District’s population and adults
under the age of 50 comprise roughly 43%
of the District’s population, so 72% of the
population is made up of of children and
adults in the child-rearing age range.
•
Adults over the age of 50 represent roughly
28% of the population.
•
Adults age 65 and older represent roughly
10% of the population.
•
Adults age 75 and older represent 3.5% of
the population.
* Population was calculated using Census
Block-level data. Census Blocks aligned
perfectly with District boundaries except for
one block, which overlapped with an area
outside the District. For that block, population
count was based on the 17 lots located
inside the District and extrapolated based
on average household size (i.e., average
household size for adjacent District block x 17).

Page 13

WTC MUD No. 1 Parks Master Plan | 5
WTC MUD #1 Budget Snapshot
Williamson-Travis Counties MUD No. 1 is
responsible for providing a range of municipal
services to its residents, including sewer and
water service, parks, trash collection, fire
protection, and security patrolling. The District
also provides deed restriction enforcement
services. Funding to provide these services
comes from the District’s General Operating
Fund, which gets its revenue from two main
sources, as shown in Figure 1: Utility Service
fees (paid by residents through monthly utility
bills) and property taxes. Total projected
General Operating Fund revenue for the
District’s 2021/22 fiscal year was $4,634,076.00.
44%
Property Taxes
56%
Service Fees
Revenue Sources
0.04% Investment Interests
0.2% Facility Rentals
Budget Allocations for
Fiscal Year 2021/22
11%
Infra
27%
Water/Wastewater
22%
District Admin
3%
Security
3%
Deed Restriction
Enforcement
13%
Fire Serice
12%
Parks & District
Buildings
9%
Trash
Collection
Lakeline Oaks Park
Purchase of water and costs of water treatment from
City of Cedar Park
Security patrolling (does not include funding for
general law enforcement, which is paid via other
taxes)
All things needed to run the District government,
including management staff, legal counsel, website
management, etc.
Third-party enforcement company, plus legal
counsel associated with enforcement activity
Maintenance of sewer/water infrastructure (pipes, pump
stations, etc.), sidewalks in Williamson County, plus
engineering services
Contract with City of Cedar Park Fire Department to
provide full coverage of District
All public parks and amenities, including those in
stormwater ponds, plus the District building and street
landscaping
Third-party waste management company, includes
trash and recycling collection

Page 14

6 | WTC MUD No. 1 Parks Master Plan
In addition to the District’s parks and ponds,
residents also have access to public parks
located outside the District boundaries. The
planning team inventoried surrounding parks
and their facilities to get a complete picture of
available amenities.
Surrounding Parks
Community Parks
Elizabeth Milburn Park (Cedar Park)
• Swimming pool
• community garden
• covered basketball court
• sand volleyball courts with pavilion
• tennis courts
• 1-mile park trail
• BMX pump track
• sports practice fields
• group pavilion (rentable)
Lakeline Park (Cedar Park)
Phase 1 Amenities (to be completed S/F 2022),
Future phases TBD
• 3 miles of trails (loop trail around the lake)
• multi-purpose pavilion for performing arts
• playground
• great lawn
• kayak launch
• fishing pier
• pavilions of varying sizes
• multi-purpose practice fields
• wildflower meadows
• restrooms
• parking
El Salido Park (Anderson Mill Limited Dist.)
• Swimming pool
• BBQ Grill
• Pavilion
• Trail
• Picnic tables
• Playscapes
• Sand Volleyball
• Tennis Courts
Harper Park (Anderson Mill Limited Dist.)
• BBQ Grill
• Trail
• Pavilion
• Picnic tables
• Playscapes
• Sand Volleyball
• Soccer fields
• Softball field
Elizabeth Milburn Park

Page 15

WTC MUD No. 1 Parks Master Plan | 7
Neighborhood Parks
Within walking distance of District Residents
Oakwood Glen Park (Cedar Park)
• Playground
• Small pavilion
Goldfinch Park (Cedar Park)
• Playground
Heppner Bend Park (Cedar Park)
• Playground
Other Parks
Twin Creeks Historic Park (Cedar Park)
• Historic Site
• Trails
• Creek
• Picnic Tables
Cedar Park Middle School (Leander ISD)
• Fitness Track
Cedar Park High School (Leander ISD)
• Fitness Track
• Practice Fields
Cedar Park High School

Page 16

Page intentionally left blank

Page 17

2.0
WTC MUD NO.1
PARKS

Page 18

10 | WTC MUD No. 1 Parks Master Plan
Existing Conditions Overview
Parks:
A. Anderson Mill West
B. Aster
C. Lakeline Oaks
D. Old Mill
E. Sun Chase
F. Volente Hills
Ponds:
1. Anderson Mill
2. Cashell Wood
3. Hatch
4. Little Elm
5. London Lane
6. Madeline Loop
7. Vestavia
8. Aster Rark
Adjacent Open Space:
i. Milburn Park
ii. Oakwood Glen Park
iii. Goldfinch Park
The following map shows both District and
surrounding area parks, stormwater ponds,
and other open space areas, which are fairly
well distributed throughout the District. The
stormwater ponds are dry detention basins
designed to drain water within a day or two.
So, although they are referred to by the District
as “ponds,” they would be more appropriately
characterized as basins.
The District has been working for the last
decade to add appropriate and low-impact
recreational amenities to these basins, or
“ponds,” to take advantage of the valuable
greenspace and increase the usability of these
spaces for residents. Many of these ponds:
Hatch Pond, Madeline Loop Pond, Little Elm
Pond, and Anderson Mill Pond are quite large,
and provide valuable additional recreational
opportunities to nearby properties.
Anderson Mill West Park and Lakeline Oaks
Park are the District’s two larger community
parks, both of which are used by District
residents and non-residents alike. Sun Chase
Park provides a special, wooded natural area
unlike anything else in the District, and several
smaller neighborhood parks add pockets of
green space throughout the District.

Page 19

WTC MUD No. 1 Parks Master Plan | 11
General Assessment
The parks and ponds in the District have
been developed to be a part of the fabric that
makes up a District residents’ life. According
to survey data, the current parks and open
space offerings have been a large reason some
people come to live in the District. The ponds
in the District are referred to as ponds because
they were constructed as drainage basins,
built to accommodate excess drainage during
storm events. They have been included in the
parks system because of how usable they are
as additional open space in the District. These
ponds are dry most of the time and many
have amenities added to them so that they
have more structured uses. An outline of the
parks system overall, some key components of
each park and pond, as well as costs allocated
to maintenance for the system will serve to
establish a baseline for what is on the ground
in the District today.
Anderson Mill West Park
Fiscal Year 15/16
Fiscal Year 16/17
Fiscal Year 17/18
Fiscal Year 18/19
Fiscal Year 19/20
Fiscal Year 20/21
6-Year Average
Operations and
Maintenance
$240,901.82
$219,446.31
$234,864.15
$262,864.59
$214,533.99
$220,864.25
$232,245.85
Improvements
$580,930.64
$505,233.96
$421,548.67
$110,214.89
$189,365.20
$13,155.50
$303,408.14
Miscellaneous
$0
$4,975.00
$14,891.07
$10,190.57
$11,028.92
$12,789.17
$8,979.12
Total
$821,832.46
$729,655.27
$671,303.89
$383,270.05
$414,928.11
$246,808.92
$544,633.11
6-Year Park Expenditures

Page 20

12 | WTC MUD No. 1 Parks Master Plan
Relationship to Schools
The District has two elementary schools located
within its boundaries: Cypress Elementary
School and Naumann Elementary School, which
provide additional play space when school is
not in session. Cypress Elementary is located
across the street from Anderson Mill West Park,
and children cut through the park traveling to
and from school and often head to the park
after school to play. Naumann Elementary is
next door to Little Elm Pond, and Cedar Park
Middle School, located in the City of Cedar Park,
shares a property line with Madeline Loop Pond.
Middle schoolers have worn their own path to
cut through the tree line and use Madeline Loop
Pond as a short cut to and from school. Middle
schoolers who take Sun Chase Blvd to and from
school also pass by Sun Chase Park.

Page 21

WTC MUD No. 1 Parks Master Plan | 13
Accessibility
With the exception of Lakeline Oaks Park,
which includes the District building, none of
the District’s parks or ponds have parking lots,
which is appropriate since these spaces are
predominately oriented toward residents who
can access the parks without using a car. In the
case of Anderson Mill West Park, which is used
regularly by non-residents, as well as residents
from all over the District, there is ample
street parking on Dagama Drive. And on the
weekend, the Cypress Elementary parking lot
across the street is used for additional parking.
All of the District’s the parks and ponds are
relatively accessible by bike or foot, as there
are sidewalks in almost all areas of the District.
The older segments of the District only have
sidewalks on one side of the street, and there
are some missing sidewalk segments along El
Salido Parkway.
Perhaps the most significant accessibility
barrier in the District is Anderson Mill Road,
which separates the Volente Hills neighborhood
from the rest of the District. Anderson Mill Road
in an arterial roadway that moves traffic from
the City of Austin up into Cedar Park. It has
been identified by Leander ISD as “hazardous
route” for children traveling to and from school,
which means despite being within a mile of
Cypress Elementary, children in Volente Hills
are provided bus service to and from school.
This is significant because it means that
children who live in Volente Hills are largely cut
off from accessing most of the District’s parks
and ponds, unless taken there by an adult.
Further, the sidewalk between Anderson Mill
Road and Anderson Mill Pond is not a safe place
to walk as there is no separation between the
sidewalk and the street and the 45 mph speed
limit is incompatible with a safe pedestrian
environment.
Residents have also expressed concerns over
the years about the safety of other streets in
the community due to issues with speeding
vehicles. El Salido Parkway, Old Mill Road, Sun
Chase Boulevard, and other connector roads
are often cited as problematic. But some
residential streets pose problems as well, such
as Aster, London Lane, Dayflower Trace, to
name a few.
For many years District residents have
expressed concerns over unsafe street
conditions for pedestrians, bicyclists, and
children, and these concerns were repeated
frequently throughout this park planning
process. Because the District’s roads are
maintained by Williamson and Travis
counties, and not by the District itself, traffic
calming and pedestrian and bicycling safety
improvements can only happen through
coordination with the counties, and, in some
cases, Leander ISD and the City of Cedar Park
as well. While such an initiative is outside
the scope of this park planning process, it is
important to acknowledge that safer street
conditions are critical to residents having full
access to and enjoyment of our parks and
ponds and that networks of safe streets are
significant recreational amenities in and of
themselves. Specific areas of concern cited by
residents during this planning process include
the following:
•
Anderson Mill Road
•
Dies Ranch Road (provides interconnection
between the District and other adjacent
neighborhoods)
•
Cashell Wood Drive
•
Old Mill Road
•
Brighton Bend Lane
•
Sun Chase Boulevard
•
Aster Pass
•
El Salido Parkway
•
Dagama Drive

Page 22

14 | WTC MUD No. 1 Parks Master Plan
Takeaways from Community Trip
• Most residents were only familiar with
a few parks or ponds. A focus on useful
wayfinding and maps of the parks system
would be a helpful resource. Community
needs to know where the parks are.
• The parks need shade, as the summer sun
makes them uncomfortable and too hot to
visit.
• There are lots of people walking and
exercising in the parks who would find
distance markers useful.
• Opportunities exist for shaded outdoor
tables and games, such as ping pong and
chess.
• The “Play for All Abilities” park in Round
Rock, Texas, could be a model for additional
augmentations to existing parks.
• Open areas that provide opportunities for
solitude and to interact with nature are
needed.
• Several parks have had little maintenance
over the last six months. Examples include
broken tree branches and light timers that
were not working correctly.
• Outdoor gym equipment for adults would
provide additional amenities for all the
residents using the parks for exercise.
• More exploratory options for kids, like the
interactive playscapes in Aster Pass Pond,
would be a resource to entice both children
and parents to visit and use the parks more
frequently.
• Opportunities exist for educational
wildflower seed areas.
• Accommodations to establish a
community garden and to provide higher
levels of accessibility for users with
disabilities should be considered.
Old Mill Park

Page 23

WTC MUD No. 1 Parks Master Plan | 15
Individual Park Assessments
What follows is a park-by-park detail that covers the primary character and use of the park as well
as other notes about activities supported by the park and amenities located there.
Anderson Mill West Park
Anderson Mill Park is a larger community park
located in the center of the District in the
Anderson Mill West neighborhood, across the
street from Cypress Elementary School on
one of the District’s main collector roads, El
Salido Parkway. The park has a large, central
playground area for children of different ages;
two open space (unimproved) areas; a garden;
restrooms; tennis, basketball, and volleyball
courts; a walking trail; restrooms; picnic tables
and grills; and a large, covered pavilion.
Observations:
• The combination of location and amenities at
this park gives it the feel of a “public square,” a
place where the neighborhood comes together.
• The sand volleyball court has not been well
maintained and therefore is not frequently
used for playing volleyball. It is mostly used by
children for sand play. A creative reuse of the
space could build on this use.
• The
basketball
court
could
use
some
modifications to make it more usable, possibly
including an adjustable height net. This court is
frequently used by children.

Page 24

16 | WTC MUD No. 1 Parks Master Plan
Anderson Mill West Park, continued
• The swing set structure is getting old, the chains
are stretching, and breaking, and there aren’t
a variety of options for different users/ages/
abilities. The black material gets very hot during
the warmer months of the year.
• The Garden of the Wild Things brings a unique
character to the park and is a space that
residents have contributed to building and
maintaining.
• Walking trails lack proper lighting for evening or
early morning walking and running.
• Children
traveling
to
and
from
Cypress
Elementary on bike or scooter have trouble with
the decomposed granite trails. Some will cut
through the center of the park in order to remain
on paved surface, but then they are required to
cross the street mid-block with no crosswalk or
crossing guard.
• The presence of this park is a selling point for
houses in the area and appropriate additional
improvements would increase its influence on
surrounding property values.
• There is a need to better maintain some of the
landscaped and open space areas, the trees,
and some of the playground equipment to build
on the park’s existing strengths.
• Many local groups use the park for meetings and
events, including Cypress Elementary school
groups.
• This park would be the most logical location for
a future splash park or water play amenities due
to its central location and availability of space.
• There are opportunities to better design available
open space so it is welcoming and comfortable
and encourages use of the space.
• The existing gazebo is most often used as a
play space for children and could be adapted to
better reflect this use.

Page 25

WTC MUD No. 1 Parks Master Plan | 17
Aster Park
This small pocket park is the former site of a
water tower and is tucked away behind the
yards of several homes in the Anderson Mill
West neighborhood. The park is accessible only
by a narrow access drive that runs between two
residential properties and is otherwise framed
on all sides by the backyards of adjacent
homes. Existing amenities include toddler play
equipment and a circular walking path.
Observations:
• The park’s intimate atmosphere and gated
entryway makes it a good space for small
children to play and neighbors to gather.
• The park’s secluded location and narrow access
point make it hard to find for anyone who doesn’t
already know where it is. To the average person
passing by, the park appears to be private
property, which may prevent the park from being
used as much as it could be.
• Several trees were killed during the February
2021 freeze and need to be replaced.
• The park would make a safe space for hosting
small-scale neighborhood gatherings.
• The existing play equipment is minimal and
could be expanded on.
• The park lacks places for adults to sit.
• The park lacks shade and is extremely hot in the
summer.
• Some of the plants are not appropriate for a
children’s play space and should be removed
and replaced with more child-friendly options.

Page 26

18 | WTC MUD No. 1 Parks Master Plan
Lakeline Oaks Park
Lakeline Oaks Park is a large neighborhood
park, located on Old Mill Road in the Lakeline
Oaks
neighborhood.
The
park
has
two
playground areas, basketball and tennis/
pickleball courts, restrooms, grills and picnic
tables, a covered pavilion, and is also home to
the District’s community building, office, and
Board of Directors’ meeting room, which makes
it a symbolically important public space that is
representative of the District.
Observations:
• The combination of amenities at this park make
it an ideal gathering place for residents and a
good location for future community activities.
• The tennis and pickleball courts are a heavily
used District amenities, although there has
historically been some tension between tennis
players and pickleball players due to this being
a shared space.
• The basketball courts are heavily used by all age
groups.
• Due to the presence of the District building, this
park is a good location for a community billboard
with news and announcements.
• Better use could be made of the open grassy
area in the center of the park

Page 27

WTC MUD No. 1 Parks Master Plan | 19
Old Mill Park
Old Mill Park (also known to residents as
“Gazebo Park”) is a small, linear pocket park
located along Old Mill Road in the Hunter’s Glenn
neighborhood. The park is predominately an
open lawn with modest-sized trees and has a
little gazebo in the center. The park is also home
to one of the District’s Free Little Libraries. The
park is bordered on three sides by the fenced
backyards of adjacent residential properties.
Observations:
• Incremental and small-scale changes to this
space could do a lot to increase its value to
surrounding neighbors while maintained the
peaceful character of the space.
• Landscaping and beautification efforts and
low-level lighting would improve the space
aesthetically and help create a place where
neighbors want to spend time.
• The masonry walls that were installed throughout
the District many years ago do not extend
around the sides and back perimeter of this
park. Instead, individual property owner’s fences
provide the only barrier between this park and
adjacent properties. An attractive 8-foot District
owned fence could make the space look more
cared for.
• The lack of any play spaces or features, and the
park’s proximity to the street mean that children
rarely spend time in this park. Small changes
could help make the space safer and more
welcoming for families with children as well as
adults.

Page 28

20 | WTC MUD No. 1 Parks Master Plan
Sun Chase Park
Sun Chase Park is wooded natural area located
just off Old Mill Road on Sun Chase Boulevard in
the Hunter’s Glenn neighborhood. The park has
narrow street frontage but extends deep into
the space between two residential blocks,
creating a secluded and peaceful park space,
surrounded on three sides by the backyards of
residential properties. A network of gravel trails
meanders through the trees and connects
walkers and joggers from the street all the
way to the back corner of the park. A recently
installed bridge links the trails into a continuous
loop over a stormwater drainage channel.
Landscaping and benches have been installed
along the trail to complement the natural
ecosystem. The back area of the park has
picnic tables and a horseshoe
pit.
Observations:
• The abundance of shade makes this park an
ideal place to spend time in the warmer months
and is the most heavily wooded park in the
District.
• There was formerly a children’s playscape
located toward the front end of the park. It was
well-loved by residents but had to be removed
because it was damaged and became a safety
concern. However, the intent was always to
replace the structure with something appropriate
for this space.
• It is important to preserve the natural character
of this park because it is part of what makes the
space so unique.
• Connecting this trail loop with Madeline Loop
Pond across the street would create a wonderful
and long trail corridor.
• Trail markers and trail signage with information
on the length of the trail would be helpful for
residents who like to walk this park for exercise
and could also make for a great Girl or Boy Scout
project.
• Tree swings would be a good addition for park
users of all ages.
• The space at the back of the park could be
upgraded over time.

Page 29

WTC MUD No. 1 Parks Master Plan | 21
Volente Hills Park
Volente Hills Park is a small park tucked away
behind the homes on Cashell Wood Drive. It is
only accessible via an alley, and a commercial
area is being constructed behind the park,
separated by a wall that is 8 feet tall. The location
allows children to play without worrying about
a busy street nearby; however, its location also
means the park is less known in the community.
• The park provides an enclosed and sheltered
place for neighborhood children to play,
particularly those who live in the homes that
back up to the park.
• For those residents, the park functions
almost like an extended backyard and
common area for the immediate neighbors.
However, the park’s location also means it
does not feel open and accessible to the
public and may feel less safe for parents of
children who don’t live adjacent to the park.
• Although the play equipment in this park is
dated, it is in good repair, safe, and usable.
• The entryway to the park is not well marked,
which adds to the private feel of this park
space.
• There are opportunities to make better use
of the grassy areas of this park space.
• Trees need to be trimmed so they can
provide shade without interfering with
activity spaces.

Page 30

22 | WTC MUD No. 1 Parks Master Plan
Anderson Mill Pond
Anderson Mill Pond is a large stormwater
detention area located along Anderson Mill Road
and adjacent to the Volente Hills neighborhood.
In recent years the District has improved and
beautified the pond area by installing a walking
trail, benches, landscaping, dog waste stations,
trash cans, swings, picnic tables, signage, and
a five-hole micro disc golf course.
• The disc golf course signage is user-friendly
and attractive and could be used as an
example for other District parks.
• The wildflowers that grow in pond are
appreciated by residents, and these should
be maintained or added to.
• The walking trail needs to be properly
maintained and weeds need to be prevented
from growing within the pathway.
• Due to its location along a busy arterial
roadway, attention must be paid to the
safety and comfort of this space.
• The trail needs to be completed along the
east side of the park to create a full walking
loop that is displaced from the busy street.

Page 31

WTC MUD No. 1 Parks Master Plan | 23
Aster Pass Pond
Aster Pass Pond is a small stormwater detention
basin adjacent to Cypress Elementary School in
the Anderson Mill West neighborhood. In recent
years the District has improved and beautified
the pond area by adding a walking trail, benches,
an observation deck, landscaping, and trees,
including two Weeping Willow trees, which are
otherwise a unique sight in the District.
Observations:
• Due to the pond’s location next to the school,
this space receives a lot of after-school activity
as children and parents pass through on their
way home. Kids enjoy playing in the basin
and underneath the observation deck, where
concrete stormwater conveyance blocks create
a make-shift seating area.
• The quality and variety of landscaping in this
park is a good model for others (variety of trees
and other perennial grasses and shrubs).
• A crosswalk in the street adjacent to the park
would improve the park’s function as a safe
route to and from school.
• The observation deck could be more useful if
there were seating and/or shade.

Page 32

24 | WTC MUD No. 1 Parks Master Plan
Cashell Wood Pond
Cashell Wood Pond is a stormwater detention
basin located in the Volente Hills neighborhood.
In recent years the District has improved and
beautified the pond area by adding a paved
sidewalk that connects this pond with Anderson
Mill Pond, an observation deck, benches, picnic
table, landscaping, and one of the District’s
several Free Little Libraries. The pond is also
located next to one of the neighborhood’s
mailbox
clusters,
which
creates
daily
opportunities for people to pass by the park.
Observations:
• The path connecting Cashell Wood Pond to
Anderson Mill Pond is well-used, particularly
since it is cool and shaded. However, there are
some safety concerns, especially for seniors. The
steps along the path are hard to see in the low
light and the paint marking them needs to be
frequently maintained.
• The stormwater infrastructure along the pathway
is not attractive and is an eyesore to homes that
back up to this space.
• The ground in this area is prone to staying wet
for longer than desired, and mosquitos have
been a concern.
• Dog waste stations are important, but some
people still fail to pick up after their dogs. It
is important to keep this area clean and dog
waste-free.
• The observation deck is not used much because
there is no shade or seating and because don’t
tend to want to linger in this space.

Page 33

WTC MUD No. 1 Parks Master Plan | 25
Hatch Pond
Hatch Pond is very large, square stormwater
detention basin located off Hatch Road in the
oldest and eastern-most portion of the District,
in the Anderson Mill West neighborhood. Hatch
Pond is accessible from both Hatch Road and
Yequa Creek Road on the opposite side. The
basin is encircled with a walking path and
has a small, shaded children’s play area in
the southern corner of the Pond, off of Yequa
Creek Road. The basin has chain-link baseball
backstops in all four corners, and because the
basin is essentially a large, open field, it is used
by residents for a variety of games, sports, and
activities.
Observations:
• The baseball field areas are not used as
frequently as they once were.
• The trail is used heavily for walking, but is in need
of maintenance and lighting in some areas.
• The basin is not easily accessible because there
are no steps or formal access points. You can
only get into the basin by walking down the
grass embankments, which are fairly steep in
some areas.
• There are opportunities to plan activities,
games, and sports for this space, and possibly
coordinate with Hill Country Bible Church across
the street to organize activities.
• Soccer goals would make a good addition to the
field.
• Preserve and enhance natural vegetation in this
Pond, including the trees.

Page 34

26 | WTC MUD No. 1 Parks Master Plan
Little Elm Pond
Little Elm Pond is a stormwater detention area
located on the periphery of the District in the
Lakeline
Oaks
neighborhood,
sandwiched
between Naumann Elementary school and a
busy commercial area on Lakeline Boulevard
(outside the District boundaries). Of all the
ponds in the District, Little Elm has received
the least number of improvements, but does
have some landscaping, benches, and a dog
waste station. A gravel access drive provides
an opportunity to walk up and back along the
tree-lined perimeter of the pond.
Observations:
• The gravel driveway needs some maintenance
to remove potholes and grass and replace
gravel in areas where it has washed away.
• This access point is not a particularly comfortable
place for people to walk because it lacks shade
and also does not connect to anything; it is an
up and back walk only.
• There are opportunities in the front end of
the pond to install low-impact and modest
improvements that would make this pond a
more usable neighborhood space.

Page 35

WTC MUD No. 1 Parks Master Plan | 27
London Lane Pond
London Lane Pond is a deep stormwater
detention basin located close to Anderson Mill
Road in the Anderson Mill West neighborhood.
The space doubles as an off-leash area for
dogs and has been improved with a dog waste
station, picnic table, benches, double gate
entryway, benches, and a water spigot with
bowls to provide water for dogs.
Observations:
• The main portion of the pond gets very hot in the
warmer months due to lack of shade.
• The metal guard rail along the top of the pond
does not fit in with the residential character of
the neighborhood.
• The land behind this pond and Anderson Mill
Road (located outside District boundaries) was
recently clear cut for commercial development,
which completely transformed the character of
this space.
• Residents often bring dog toys to this space to
be left and shared by all. A dedicated storage
box would be helpful.

Page 36

28 | WTC MUD No. 1 Parks Master Plan
Madeline Loop Pond
Madeline Loop Pond is a very large stormwater
detention area located behind homes in the
Hunter’s Glenn neighborhood and backing up
to Cedar Park Middle School. The pond area has
a secluded feel and is only accessible through
a narrow gravel walkway located between two
residential properties. A gravel trail wraps
around two and half sides of the pond and a long
wooden bridge spans the concrete stormwater
infrastructure to provide trail continuity. Exercise
equipment and a picnic area are located at the
eastern end of the pond. Several Purple Martin
bird houses are installed in the basin.
Observations:
• The exercise equipment is a good amenity but
could be better maintained.
• The trail will be more functional once it is
connected up to Sun Chase Boulevard. This
would also provide a connection to the walking
trail at Sun Chase Park. A connection to Little Elm
Pond would create a long-trail network through
the heart of the community.
• Natural vegetation in the basin would improve
the natural feel of this pond and experience of
walking the trail.
• Mile markers would be useful for trail walkers,
particularly once the trail is connected to Sun
Chase Park.
• Kids from the middle school have created their
own makeshift trail connection through the tree-
line that divides the school property from the
pond.

Page 37

WTC MUD No. 1 Parks Master Plan | 29
Vestavia Ridge Pond
Vestavia Ridge Pond is a smaller stormwater
detention basin located in the back corner of
the Volente Hills neighborhood. The upland
portion of the pond, along the street has a
small, fenced dog run with dog waste station.
Observations:
• Neighborhood children like to play in the basin
portion of the pond and build forts near the trees
and amidst the stormwater infrastructure, as
there are no other park spaces in this area of the
neighborhood.
• The linear stormwater conveyance area along
RM 2769 is accessible by walking along narrow
grass walkways on either side of the Pond
property.
• Need to improve maintenance of the vegetation
in the basin.

Page 38

Page intentionally left blank

Page 39

3.0
STRATEGY &
IMPLEMENTATION

Page 40

32 | WTC MUD No. 1 Parks Master Plan
Based on the public input received throughout
this planning process, the planning team
developed the following series of goals for the
District’s Park System over the next 5 years:
•
Prioritize the meticulous maintenance of our
parks and ponds.
•
Expand opportunities for residents to access
and enjoy the natural environment.
•
Where possible, utilize the park and pond
system to interconnect the community
through walking trails
•
Provide a diversity of year-round amenities
for different age, and park users, especially
those currently under-served populations,
such as teenagers, seniors, adults without
children, and those with different physical
capabilities.
•
Invest in the Districts ponds and smaller
parks as much as in the larger parks to
enhance the value and usability of these
spaces for nearby residents.
•
Leverage
a
variety
of
funding
and
implementation
strategies
to
improve
the park system, including grants, private
donations, and volunteerism.
5-Year Park Goals
1. Trail improvement
2. Playscape improvements/
replacements
3. Landscaping beautification and
access improvements
4. Ecosystem restoration and
enhancements
5. Water play amenities
6. Athletic or sports amenity additions
or improvements
7. Social gathering areas
Physical
Improvements
Source: Chicago Parks District
Project Prioritization
Using public input as well as all the data
presented earlier in this document, the planning
team developed a list of specific projects, each
of which would contribute incrementally to
achieving the goals listed above. The results of
Community Survey #2 (see Appendix A), helped
the team refine and prioritize that list to develop
a five year budgeting strategy. Generally,
physical improvements were prioritized in the
following order:
In addition, public input suggested broad
support for park programming, events,
and activities to bring residents together. A
range of options exist for this, but the top two
priorities, per the results of Survey #2 were
movies and/or music in the park and large
community-wide events (e.g,. 4th of July
picnic).
According to feedback received in the earlier
phases of the planning process, residents
indicated a preference for park spaces they
could walk to and that were located closest to
their own homes. As such, when developing
the 5-year budgeting strategy, the planning
team also tried to spread investment
throughout the District’s parks and ponds
rather than invest exclusively in certain areas.

Page 41

WTC MUD No. 1 Parks Master Plan | 33
Three significant needs were identified
through the public engagement process.
A strategy for meeting each of these was
created, and these strategies informed the
recommendations in the implementation
section of the document.
Enable Accessible Play and Embrace Natural
Features
In today’s parks and open spaces inclusivity
of play is of utmost importance. This takes into
consideration physical abilities, age limitations,
and more. With the District’s geography and the
region surrounding the MUD, it is also important
to consider that parks and open spaces should
embrace the natural features to bolster a unique
character but also to embrace the fiscal lens by
leveraging natural play and terrain when planning.
The plan highlights multiple implementation
items that aim to improve park access including
partnering with Leander ISD to develop trail
connections, improved wayfinding, and a greater
sensitivity to ADA standards.
Embrace Efficiency & Utilization of Space
In the spirit of building for the future in a fiscally
responsible and sustainable manner, the MUD
can align itself with several different avenues
to increase efficiency, optimize spaces, and
ensure assets and liabilities are accounted for
appropriately with the principles of outcome-
based budgeting.
Prioritize Communication of Park System
One of the most important parts of a well
functioning and well utilized parks system is a well
formulated communication system. Prioritizing
getting the word out about the “whats”, “whens”,
and “hows” of the system and individual parks
is key to allowing residents and visitors to feel
confident in what the parks in the District have to
offer.
Meeting Park Needs
Optimize & Improve Existing Parks System
To optimize and improve what is on the ground
in the MUD today, partnerships and revenue
opportunities must be leveraged to elevate the
quality of MUD park operations, maintenance,
and infrastructure. In this effort the MUD must
also consider the impact these efforts have on
upholding and improving equitable park access
and ensuring a sustainable and well- balanced
MUD budget.
Expand and Improve Access
Providing equitable access to parkland for
all residents is a priority for the MUD. Through
the
planning
process
community
members
commented on the access and communication
of park locations in the parks system. The MUD’s
goal is to ensure residents know what is available
to them, can access the parks easily, and don’t
have to worry about physical abilities limiting their
enjoyment.
Align Park Programming with Community
While there is a high demand for more programs
at parks, there is also a strong interest in natural
experiences and unprogrammed spaces and
activities. As the needs and interests of community
members change, program offerings should be
evaluated and adjusted as needed to reflect the
most relevant programs. To meet this goal, the
plan highlights several implementation items and
suggested programming genres that aim to align
with community interests.
NEEDS
STRATEGY

Page 42

34 | WTC MUD No. 1 Parks Master Plan
Action & Measurement
A key to a plan that is actionable and easily
implementable is to provide explicit examples,
guidance, and timelines for how the overall
strategy can be implemented in the future.
Measuring & Tracking Progress
As a part of the engagement and planning
process, the team along with MUD Board
members
collaborated
on
a
set
of
implementation
actions.
These
actions
have been collected to form an exhaustive
implementation matrix that provides an easy
visual representation of different activities and
actions that align with the future strategies and
prioritization categories and corresponding
priorities.
Implementation Opportunities are split and
refined multiple ways. First is between area.
Each park has a list of different implementation
actions and recommendations. This allows
different parks to get the time, investment,
and attention that they require to keep up with
community needs. The other parameters can
be seen below.
1. Trail improvement
2. Playscape improvements/
replacements
3. Landscaping beautification
and access improvements
4. Ecosystem restoration and
enhancements
5. Water play amenities
6. Athletic or sports amenity
additions or improvements
7. Social gathering areas
FACILITIES &
AMENITIES
1. Movies or music in the park
2. Large community events
3. Active recreation events
4. Community art projects
5. Informational classes
6. Contests and community
challenges
COMMUNITY
PROGRAMMING
HIGH PRIORITY
MEDIUM PRIORITY
LOW PRIORITY
$
$0 - $5k
$$
$5 - $25k
$$$
$25k +
PRIORITY LEVEL
INVESTMENT
LEVEL
1
YEAR
3
YEARS
5 YEARS
TIME TO
IMPLEMENT
The goal of this implementation exercise is to
provide realistic, actionable improvements
that align with community interest to further
the overall parks strategy in the District.

Page 43

WTC MUD No. 1 Parks Master Plan | 35
Legend:
CP: Community Programming
F&A: Facility and Amenity Improvements
High Priority
Medium Priority
Low Priority
1‐YR implementation time
3‐YR implementation time
5YR implementation time
Ongoing effort (O)
Possible Scout Project
Area
CP
F & A
Implementation Opportunity
District Wide
5
Street tree planting program
District Wide
5
explore becoming a certified bird city (through TP&W)
District Wide
5
ID areas to designate as Certified Wildlife Habitat through National Wildlife Federation
District Wide
3
District Wide
1
Improve our website and communications
District Wide
1
Pop up movie kit and block party trailer ($12,000)
District Wide
3
District Wide
1
District walk/run event (e.g., turkey trot)
District Wide
O
District sponsored tournaments
District Wide
O
Classes or lectures from experts (e.g., natural landscaping, Texas birds or habitat, etc.)
District Wide
1
District sponsored contests (e.g., park photo contests)
District Wide
O
Park ambassadors
District Wide
O
Volunteer days
District Wide
O
Enhance the functionality and user‐experience of existing amenities through incremental, smaller‐scale projects.
District Wide
O
District Wide
5
Investigate “water‐play” options/alternatives as a longer‐term investment.
Anderson Mill Pond
3
Plant shade trees
Anderson Mill Pond
3
S
Install Trail/distance markers
Anderson Mill Pond
3
Install seating (facing west—to enjoy the sunset)
Anderson Mill Pond
5
Plant screening (evergreen) trees in the SW corner to better screen adjacent properties.
Anderson Mill Pond
5
Enhancements to the north end of the park (picnic area and swings)
Anderson Mill Pond
3
S
Install signage about function of stormwater detention areas.
Anderson Mill Pond
1
Hosting of neighborhood tournament
Anderson Mill Pond
3
S
Build on existing signage that emphasizes the pond’s natural environment.
Anderson Mill Pond
1
Website marketing
Anderson Mill Pond
1
Improve marketing of the existing disc golf course.
Anderson Mill West Park
3
Install a barrier around park space to keep kids from running into the street
Anderson Mill West Park
5
Install adjustable height basketball nets to accommodate players of all ages
Anderson Mill West Park
3
Install a barrier to prevent balls from rolling off and away from the basketball court
Anderson Mill West Park
1
Stripe the basketball court to accommodate games other than basketball (e.g., four square)
Anderson Mill West Park
5
Plant new shade trees in areas that are without and along street frontage, and to replace trees that have been lost in recent years.
Anderson Mill West Park
3
Add tennis practice wall inside tennis courts
Anderson Mill West Park
1
Transform existing gazebo into a playhouse for kids
Anderson Mill West Park
3
Replace play equipment with alternatives accessible to all children (e.g., different types of swings)
Anderson Mill West Park
1
District‐sponsored community events (e.g., 4th of July BBQ, Light Up the Park, etc.)
Anderson Mill West Park
5
Bathroom updates (e.g., better toilet seats, baby changing station, etc.)
Anderson Mill West Park
5
Install water bottle fill up stations
Anderson Mill West Park
3
Add pickleball striping and pickleball equipment to tennis courts.
Anderson Mill West Park
1
Alter mowing plan to allow flowers to remain
Anderson Mill West Park
5
Parkour equipment
Anderson Mill West Park
3
Gathering space that involves sculptures to sit on, climb, etc.
District sponsored community events and events planned in collaboration with other neighborhood organizations. Possible establishment of events
committee
Prepare a “community service project guide” that lists small‐scale projects that could be completed by volunteers (e.g, boy/girl scouts, high school students, etc.)
Implementation Opportunity Matrix
Institute a multi‐tiered “Play in the MUD” campaign aimed at celebrating our park system; increasing awareness of our parks, ponds, and amenities; and increasing and diversifying
park use. This may include promotional work, hosting of community events, and establishing volunteer groups and programs.

Page 44

36 | WTC MUD No. 1 Parks Master Plan
Legend:
CP: Community Programming
F&A: Facility and Amenity Improvements
High Priority
Medium Priority
Low Priority
1‐YR implementation time
3‐YR implementation time
5YR implementation time
Ongoing effort (O)
Possible Scout Project
Area
CP
F & A
Implementation Opportunity
Implementation Opportunity Matrix
Anderson Mill West Park
1
Events geared toward teens like movie nights (Movies in the park supplies roughly $4,000)
Anderson Mill West Park
3
Different swing options
Anderson Mill West Park
1
Landscape design for front of park to encourage lingering (common area)
Anderson Mill West Park
5
Unique BBQ pit area with circular seating
Anderson Mill West Park
3
Small splash pad area
Anderson Mill West Park
1
Install game tables
Anderson Mill West Park
1
Install exercise equipment
Aster Pass Park
3
Install natural playscape features
Aster Pass Park
3
Install shade and seating in central circle
Aster Pass Park
1
Install low‐level lighting, like string lights
Aster Pass Park
1
S
Improve landscaping and remove spiky and spiny plants that pose safety hazard for kids
Aster Pass Park
1
Enhance landscaping along the park entryway.
Aster Pass Park
1
S
Paint the pavement along the entryway drive with a welcoming design
Aster Pass Park
3
Work with school district to get a curb cut where the pond trail meets the school parking lot to smooth this connection for bike riders.
Aster Pass Pond
1
Alter mowing plan to allow flowers to remain
Aster Pass Pond
3
S
Aster Pass Pond
3
Add shaded seating to observation deck
Aster Pass Pond
1
S
Install natural steps into bottom of pond basin
Aster Pass Pond
1
S
Paint concrete stormwater infrastructure under deck.
Aster Pass Pond
1
Cashell Wood Pond
3
Work with school district to get a curb cut where the pond trail meets the school parking lot to smooth this connection for bike riders.
Cashell Wood Pond
1
S
Add plantings to the corridor between Cashell Wood Pond and Anderson Mill Pond to beautify and screen the noise and sight of Dies Ranch
Cashell Wood Pond
3
Install seating and shade to the existing observation deck.
Cashell Wood Pond
3
S
Install bird houses and bat houses to help control the mosquito population in this location.
Cashell Wood Pond
5
Cashell Wood Pond
1
Alter mowing plan to allow flowers to remain
Hatch Pond
1
Alter mowing plan to allow flowers to remain
Hatch Pond
3
Plant trees and native landscaping.
Hatch Pond
3
Add low‐level lighting in shaded areas.
Hatch Pond
3
Make small updates to play equipment such as addition of different types of swings for different ages and abilities.
Hatch Pond
3
S
Provide storage area for portable recreational and game equipment, such as pop‐up soccer goals to expand opportunities for basin usage
Lakeline Oaks Park
5
Plant trees along the street frontage and in key areas of the park.
Lakeline Oaks Park
3
Add court divider net between tennis/pickleball courts
Lakeline Oaks Park
3
Install a practice wall in the tennis courts
Lakeline Oaks Park
3
Install a water bottle fill up station
Little Elm Pond
1
S
Install bird and bat houses
Little Elm Pond
1
Clean up area around mature trees up towards the road, add natural area play space and seating.
Little Elm Pond
1
Alter mowing plan to allow flowers to remain
London Lane Pond
3
Install dog water fountain to replace water cooler
London Lane Pond
3
Install a dog wash/hose off station
London Lane Pond
5
Plant additional shade trees in basin
London Lane Pond
1
Improve marketing of this space, as many residents are not aware the District has a public off‐leash area.
Install educational signage about natural ecosystems, green infrastructure, and the function of stormwater detention areas (possible collaboration with Cypress Elementary or
scouts)
Install a barrier in the NW corner next to wooden bridge to keep children from riding over the edge of the hill when existing or entering the bridge.
Coordinate with necessary entities to add a connection (trail segment and steps) as well as possibly a road crossing to connect Bella Vista residents to the trailway

Page 45

WTC MUD No. 1 Parks Master Plan | 37
Legend:
CP: Community Programming
F&A: Facility and Amenity Improvements
High Priority
Medium Priority
Low Priority
1‐YR implementation time
3‐YR implementation time
5YR implementation time
Ongoing effort (O)
Possible Scout Project
Area
CP
F & A
Implementation Opportunity
p
pp
y
London Lane Pond
3
Plant additional shade trees along the rear of the park to make the space cooler and more comfortable for both people and their dogs.
Madeline Loop Pond
1
Install a trail connection from the western side of the pond out to Sun Chase Boulevard.
Madeline Loop Pond
1
S
Install bird houses and bat boxes
Madeline Loop Pond
3
Work with county on enhanced street crossing (Sun Chase Blvd to Sun Chase Park)
Madeline Loop Pond
3
Work with LISD to formalize the connection between the pond trail and Cedar Park Middle School.
Madeline Loop Pond
1
Alter mowing plan to allow flowers to remain
Old Mill Park
1
Alter mowing plan to allow flowers to remain
Old Mill Park
5
Install seating areas
Old Mill Park
3
Install landscaping and pathways, prioritizing areas that get muddy.
Old Mill Park
1
Refresh and repaint the gazebo and add soft lighting within/around it
Old Mill Park
3
Install landscaping lighting
Old Mill Park
3
Add stone sculptures that complement the landscaping and can also be used for climbing.
Old Mill Park
5
Install small playhouses or imaginative play structures
Old Mill Park
5
Install small active play features
Old Mill Park
3
S
Paint existing concrete walkway
Old Mill Park
1
Sun Chase Park
1
Install informational trail signage and mile markers along the trail.
Sun Chase Park
3
Install tree swings in appropriate locations throughout the park.
Sun Chase Park
1
Install soft lighting (e.g, string lights in the picnic area at the rear of the park)
Sun Chase Park
3
Redesign rear picnic area to include soft lighting, improved seating, a grilling area, etc.
Sun Chase Park
5
Sun Chase Park
3
Grill/BBQ pit
Sun Chase Park
3
Hammocks/hanging swings under arbor?
Sun Chase Park
1
Install game tables
Sun Chase Park
1
Install exercise equipment
Vestavia Ridge Pond
3
S
Embankment slide
Vestavia Ridge Pond
3
safety improvements and access improvement
Volente Hills Park
1
S
Install more pronounced entryway signage
Volente Hills Park
1
S
Install landscaping along alleyway
Volente Hills Park
3
Add more play options to diversify park use but remain consistent with the park’s proximity to resident’s back yards.
Develop a long‐term care plan for the natural eco‐system of this park, engaging a certified arborist and potentially an urban forester, and urban wildlife expert (Texas Parks and
Wildlife Urban Wildlife program).
Install low and decorative fence or other barrier to better protect the park from the street and improve safety while maintaining the open and welcoming feel of the park.

Page 46

38 | WTC MUD No. 1 Parks Master Plan
Future budgeting for our parks must account
not only for improvement costs, but also for the
maintenance and operating costs of both existing
and proposed new amenities. The estimated costs
for proposed park improvements (tables starting
on pg 39) were intended to leave adequate
room in the overall budget for maintenance and
operations spending.
Over the last 6 years, the District has spent
between roughly $215,000 and $263,000 per
year on maintenance and operations for our
existing parks and ponds (see table on pg. 11).
While future annual maintenance and operations
spending will continue to fall somewhere within
this range, special attention to proposed trails
and landscaping maintenance costs needs to
be considered in future budgets. Additionally,
the Splash Pad proposed for Anderson Mill West
Park has the potential to require a larger amount
of year-to-year maintenance and thus should
be researched more in-depth before the board
commits to such an improvement.
The projects that are proposed in the following
implementation tables are, on average, lower than
both the target spending value and the previous
6-year spending average on improvements.
The expected age to replace major capital
improvements is represented in the final column
of the implementation by year tables. Based on
the estimated lifespan of each improvement, the
board will need to account for approximately $30K
per year in the improvements portion of the parks
budget (see second row of the table on page 11)
after year 5 to ensure that these amenities can be
replaced at the end of their useful life.
Funding & Community Involvement
The majority of funding for the park system
comes from tax dollars, so future spending has to
be aligned with what is realistic and appropriate
for the District and should also reflect the
spending preferences of the taxpayers.
Community Survey #2 attempted to gather input
on how residents feel about spending on parks.
Results of the survey suggested the following key
things:
•
The park system is considered a vital part of
the community’s infrastructure.
•
It is worth it to continue to invest public funds
in the park system.
•
The average amount spent ($99/person)
by the District over the last six years is well-
aligned with taxpayers spending preferences
($104/person).
It should also be stated that the budgeting
strategy included in the plan is a guide for future
decision-making and is not intended to bind
the Board of Directors to spending a particular
amount each year. Annual decisions about the
District’s budget will be based on a wide variety
of considerations and the District’s overall needs
each year. However, the budgeting strategy
helps connect the public’s desired outcomes for
the park system with the budgeting process and
improves the transparency and accessibility of
that process by allowing residents to understand
the reasons behind budgeting decisions, at least
as they relate to the park system.
Also built into the budgeting strategy
spreadsheet are opportunities to leverage
people’s time and talent to improve the park
system without spending public funds. This
may include efforts on the part of the District’s
Directors but can and should also involve
residents and community organizations, such as
Boy and Girls Scouts.
The District also aims to supplement funding with
grant money and potentially other fundraising
activities, which will be pursued over time as
opportunities become available.
Prioritizing the meticulous
maintenance of our parks and ponds

Page 47

WTC MUD No. 1 Parks Master Plan | 39
Implementation By Year
FY 21/22 – Kickoff Projects
Project
Estimated Cost
Notes
Years to
Replace
PARK SYSTEM
Establish a volunteer resident Tree Committee.
Begin work on a multi-tiered “Play in the MUD” campaign
aimed at celebrating our park system; increasing awareness
of our parks, ponds, and amenities; and increasing and
diversifying park use.
May include promotional work, hosting
of community events, and establishing
volunteer groups and programs. Some
small costs may be incurred for signage
or other promotional or informational
materials are produced.
Update park website pages to be to provide more detailed
and up-to-date information about our park system.
Purchase supplies for “Movies in the Park”: Pop Up Screen,
Projector, and Sound System.
$6,000
Aim to host first ever Movies in the Park
event by end of fiscal year.
10
SUN CHASE PARK
Install play feature in front of Sun Chase Park at the site of the
former playscape.
$45,000
20
LONDON LANE POND
Work with Texas A&M Community Forestry to plant new trees
along the back (south) end of the pond to replace some of the
former character and intimacy of the space (prior to adjacent
land being cleared for development)
Seeking grant
for initial
plantings
MADELINE LOOP POND
Install trail segment connecting existing trail to Sun Chase
Blvd.
$85,000
This trail has portions that are concrete
and portions that are crushed granite,
depending on the location.
50
ANDERSON MILL WEST PARK
Replace missing playscape features (former bouncer and
climbing feature.
$25,000
10
The specific projects listed below were
selected based on resident preferences and
resource constraints. However, the District
wants to ensure that future projects continue
to reflect residents’ priorities over time.
Residents who express interest in projects not
included in these tables may bring proposals
to the District for consideration and assistance
in implementation. In several instances,
flexibility has already been built into the project
description to allow for input from residents on
the specifics of a given project. (e.g., Lakeline
Oaks Park: Work with a Landscape Architect to
develop a design plan to maximize value of and
better define central open space area. Pg. 43).
$161,000
Total Cost to Implement

Page 48

40 | WTC MUD No. 1 Parks Master Plan
FY 22/23 – Year 1
Project
Estimated Cost
Notes
Years to
Replace
PARK SYSTEM
Prepare a tree inventory and tree management and planting
plan with assistance from community forestry
Institute a multi-tiered “Play in the MUD” campaign aimed
at celebrating our park system; increasing awareness of our
parks, ponds, and amenities; and increasing and diversifying
park use.
May include promotional work, hosting
of community events, and establishing
volunteer groups and programs. Some
small costs may be incurred for signage
or other promotional or informational
materials are produced.
Prepare a volunteer project “binder”
Prepare an inventory of District projects
that could be completed by any volunteer
groups (e.g., Boy and Girl Scouts, school
groups or students, church or organizations,
etc.).
ANDERSON MILL WEST PARK
Conduct in-depth research into a range of water play
options to gain a better understanding of all costs--upfront,
maintenance, and operation—as well as the other trade-offs
associated with different options.
Research will be used to make decisions
in subsequent years about investing in a
community water play amenities.
Modernize swing area to accommodate a variety of options
and install zipline feature behind existing swing structure.
$50,000
Should try to accommodate different ages
and abilities
10
Pave trail along El Salido Parkway street frontage with a 6-foot
wide concrete pathway.
$36,000
Look for opportunities to maintain a crushed
granite trail alongside the new paved trail
for residents who prefer walking on a more
forgiving surface.
50
Pickleball striping and equipment at Anderson Mill West tennis
courts
$5,000
5
$202,000
Total Cost to Implement

Page 49

WTC MUD No. 1 Parks Master Plan | 41
Project
Estimated Cost
Notes
Years to
Replace
ASTER PARK
Enhance landscaping along the park entryway and paint
pavement with a welcoming design to help emphasize
entryway.
$5,000
ASTER PASS POND
Install a barrier in the NW corner next to wooden bridge to keep
children from riding over the edge of the hill when existing or
entering the bridge.
Less than $1000
OLD MILL (GAZEBO) PARK
Install lighting in gazebo and landscaping lighting throughout park
$10,000
10
Host a community planting day to install landscaping around
the gazebo.
$1,000
LITTLE ELM POND
Initiate conversation with Leander ISD about potential for a trail
connection between Madeline Loop Pond and Little Elm Pond
on school district land.
A trail in this location would interconnect
not only Madeline Loop and Little Elm Pond,
but also the middle school and Naumann
Elementary, creating a more direct safe
route between homes and schools and
providing a more extensive trail network
though the heart of the community.
Install fenced in “off-leash” area in front end of pond.
$20,000
LAKELINE OAKS PARK
Replace pavilion fans with something that moves more air
$8,000
LONDON LANE POND
Investigate opportunities to remove /replace the metal
guardrail along the top of the pond.
Less than $1000
15
SUN CHASE PARK
Install trail/nature walk/distance signage and mile markers,
including land acknowledgement signage.
$3,000
ONGOING AND INCREMENTAL INITIATIVES
Tree Planting Program
Varies
Landscaping Program
Varies
Prioritize natives, integrate opportunities
to improve habitat, conserve water,
and combine landscaping with green
infrastructure (e.g., rain gardens,
bioswales). Can combine with efforts to
earn various certifications, such as: Bird
City (TX Parks & Wildlife), Certified Wildlife
Habitat (National Wildlife Federation), Texas
Water Smart
Annual Park Events
$2,000
May involve establishing a resident
committee to assist in planning and
managing District- sponsored events.
Detention Basin Conversion (Green Infrastructure): converting
dry detention basins to natural ecosystems
$60,000
Consider Madeline Loop as pilot project
location
FY 22/23 – Year 1, continued

Page 50

42 | WTC MUD No. 1 Parks Master Plan
FY 23/24 – Year 2
Project
Estimated Cost
Notes
Years to
Replace
ANDERSON MILL WEST PARK
Transform deteriorating volleyball court into a natural play
area with digging/play sand. Possibly include shade structure
boulders and other natural play elements, and digging, sifting,
tools.
$30,000
Conversion of gazebo to playhouse, considering
interrelationship between sand play area.
$3,000
Install water bottle fill up station
$5,000
10
Pave trail along Dagama Drive street frontage with a 6-foot
wide concrete pathway.
$56,500
Look for opportunities to maintain a crushed
granite trail alongside the new paved trail
for residents who prefer walking on a more
forgiving surface.
50
ASTER PARK
New play equipment for children of different ages and abilities
$60,000
20
Remove spiky and spiny plants and replace with child-
friendly landscaping.
$5,000
CASHELL WOOD POND
Install trees along the corridor between Cashell Wood Pond and
Anderson Mill Pond to beautify and screen the noise and sight of
Dies Ranch Road and the stormwater management infrastructure.
$5,000
Install bird (e.g., purple martin) and bat houses to help
control mosquito population (not a replacement for active
management and treatment of infrastructure.
Less than $500
$203,000
Total Cost to Implement

Page 51

WTC MUD No. 1 Parks Master Plan | 43
Project
Estimated Cost
Notes
LAKELINE OAKS PARK
Work with a Landscape Architect to develop a design plan to
maximize value of and better define central open space area.
Less than
$5,000
Host a community planting day to install landscaping around
the gazebo.
$1,000
HATCH POND
Installation of access point into basin—Embankment slide with
side steps
$25,000
20
LITTLE ELM POND
Invest in front end of park, cleaning up area under large oak
tree to create play space.
$5,000
Project
Estimated Cost
Notes
ONGOING AND INCREMENTAL INITIATIVES
Tree Planting Program
Varies
Landscaping Program
Varies
Prioritize natives, integrate opportunities
to improve habitat, conserve water,
and combine landscaping with green
infrastructure (e.g., rain gardens,
bioswales). Can combine with efforts to
earn various certifications, such as: Bird
City (TX Parks & Wildlife), Certified Wildlife
Habitat (National Wildlife Federation), Texas
Water Smart
Annual Park Events
$2,000
(fluctuating
budget based
on levels of
volunteerism)
May involve establishing a resident
committee to assist in planning and
managing District- sponsored events.
Detention Basin Conversion (Green Infrastructure): converting
dry detention basins to natural ecosystems
Varies
FY 23/24 – Year 2, continued

Page 52

44 | WTC MUD No. 1 Parks Master Plan
FY 24/25 – Year 3
Project
Estimated Cost
Notes
Years to
Replace
ANDERSON MILL WEST PARK
Water amenities implementation, if determined feasible.
$15,000
(see Appendix B)
Research will be used to make decisions
in subsequent years about investing in a
community water play amenities.
30
ANDERSON MILL POND
Install trail segment along east side of pond to create a full,
connected walking loop and provide a safer alternative to
walking directly along Anderson Mill Road.
$50,000
50
Install trail/nature walk/distance signage and mile markers
$5,000
LAKELINE OAKS PARK
Implementation of design plan for central area
$25,000
Install water bottle fill up station
$5,000
ASTER PARK
Install shade structure and picnic seating area in central
portion of park
$40,000
10
MADELINE LOOP POND
Work with Leander ISD, specifically Cedar Park Middle School
to provide a more formal and safer pedestrian connection
between the school and pond.
Less than
$5,000
Work with Williamson County on safe mid-block crossing
between Sun Chase Park and Madeline Loop Pond to
encourage this to function as an integrated trail network.
$164,000
Total Cost to Implement

Page 53

WTC MUD No. 1 Parks Master Plan | 45
Project
Estimated Cost
Notes
OLD MILL (GAZEBO) PARK
Improve seating and “gathering” areas.
$5,000
Integrate small-scale and imaginative play features into the
landscape, such as a playhouse.
$10,000
15
LONDON LANE POND
Install shade structure in the southwest corner.
$12,000
10
SUN CHASE PARK
Install tree/hanging swings and swing seats throughout the
park.
$5,000
10
ONGOING AND INCREMENTAL INITIATIVES
Tree Planting Program
Varies
Landscaping Program
Varies
Prioritize natives, integrate opportunities
to improve habitat, conserve water,
and combine landscaping with green
infrastructure (e.g., rain gardens,
bioswales). Can combine with efforts to
earn various certifications, such as: Bird
City (TX Parks & Wildlife), Certified Wildlife
Habitat (National Wildlife Federation), Texas
Water Smart
Annual Park Events
$2,000
(fluctuating
budget based
on levels of
volunteerism)
May involve establishing a resident
committee to assist in planning and
managing District- sponsored events.
Detention Basin Conversion (Green Infrastructure): converting
dry detention basins to natural ecosystems
FY 24/25 – Year 3, continued

Page 54

46 | WTC MUD No. 1 Parks Master Plan
FY 25/26 – Year 4
Project
Estimated Cost
Notes
Years to
Replace
ANDERSON MILL WEST PARK
Upgrades to basketball court: Adjustable height nets, court
surfacing/striping for multi-sport use, barrier to prevent balls
from rolling away.
$10,000
10
Install tennis practice wall in court.
$5,000
Improved lighting throughout park: bollard lighting around
trails and pathways.
$35,000
30
Work with a landscape architect to prepare a plan for the front,
open area of the park.
$5,000
Plan should emphasize that this is the main
entryway into the park and is underutilized,
lacks shade, edges, and defining features.
ANDERSON MILL POND
Install seating along the trail, facing west so people can enjoy
the sunset.
$3,000
HATCH POND
Upgrades/add-ons to existing play equipment: opportunities
for all ages and abilities
$30,000
30
Install fenced in “off-leash” area
$80,000
LITTLE ELM POND
Depending on outcomes of discussions with Leander ISD
related to trail access between Little Elm Pond and Madeline
Loop Pond, potential implementation of trail connection
project. This would also require extending a trail from the
existing access drive to the southwest corner of Little Elm Pond.
$80,000
VOLENTE HILLS POCKET PARK
Work with Volente Hills HOA to prepare a plan for improving
this space.
Plans should seek to improve visibility and
accessibility of this park space, potentially
including new signage on Briona Wood
Lane improvements to alleyway (pavement
markings, landscaping, etc.), better use
of open space in park, all taking into
consideration proximity of homes.
ONGOING AND INCREMENTAL INITIATIVES
Tree Planting Program
Varies
Landscaping Program
Varies
Prioritize natives, integrate opportunities
to improve habitat, conserve water,
and combine landscaping with green
infrastructure (e.g., rain gardens,
bioswales). Can combine with efforts to
earn various certifications, such as: Bird
City (TX Parks & Wildlife), Certified Wildlife
Habitat (National Wildlife Federation), Texas
Water Smart
Annual Park Events
$2,000
(fluctuating
budget based
on levels of
volunteerism)
May involve establishing a resident
committee to assist in planning and
managing District- sponsored events.
Detention Basin Conversion (Green Infrastructure): converting
dry detention basins to natural ecosystems
Varies
$250,000
Total Cost to Implement

Page 55

WTC MUD No. 1 Parks Master Plan | 47
FY 26/27 – Year 5
Project
Estimated Cost
Notes
Years to
Replace
ANDERSON MILL WEST PARK
Implementation of design plan for front area of park.
$65,000
ASTER PASS POND
Add shaded seating to observation deck
$5,000
SUN CHASE PARK
Redesign and upgrade rear picnic area to include soft lighting,
improved seating, a grilling area, etc.
$30,000
15
HATCH POND
Add low level lighting to dark and shaded areas, specifically
play area.
$10,000
30
VESTAVIA RIDGE POND
Install embankment slide in Vestavia Ridge Pond to provide
play opportunities in this area of the neighborhood/District.
$20,000
20
VOLENTE HILLS POCKET PARK
Implement plans to improve this park space.
TBD
OLD MILL (GAZEBO) PARK
Install 8-foot “fencecrete” fence (in lieu of masonry wall)
along sides and back of this park to create a uniform and neat
appearance.
$70,000
ONGOING AND INCREMENTAL INITIATIVES
Tree Planting Program
Varies
Landscaping Program
Varies
Prioritize natives, integrate opportunities
to improve habitat, conserve water,
and combine landscaping with green
infrastructure (e.g., rain gardens,
bioswales). Can combine with efforts to
earn various certifications, such as: Bird
City (TX Parks & Wildlife), Certified Wildlife
Habitat (National Wildlife Federation), Texas
Water Smart
Annual Park Events
$2,000
(fluctuating
budget based
on levels of
volunteerism)
May involve establishing a resident
committee to assist in planning and
managing District- sponsored events.
Detention Basin Conversion (Green Infrastructure): converting
dry detention basins to natural ecosystems
Varies
$202,000
Total Cost to Implement

Page 56