Minutes, regular meeting, April 21, 2021
Unofficial searchable copy. For the official record, use the district’s own copy.
2021minutes2021-04-21 2021-04-212021-04-21-minutes2021-04-21Motions
Authorize Inframark to repair the stack at 3*** Cottonweed for an amount NTE $4,000.00.
Page 1
MINUTES OF MEETING OF THE BOARD OF DIRECTORS OF #14 April 21, 2021 STATE OF TEXAS § § COUNTIES OF WILLIAMSON AND TRAVIS. § A regular meeting of the Board of Directors of was held at 6:00 p.m. on April 21, 2021 by remote access only in accordance with the March 16, 2020 Order by Governor Abbott temporarily suspending certain requirements of the Texas Open Meetings Act to advance the goal of limiting face-to-face meetings to slow the spread of COVID-19. The meeting was open to the public and notice was given as required by the Texas Open Meetings Act and as modified by the Governor's Order. The meeting was called to order at 6:02 p.m. and roll was called of the members of the Board, to-wit: Catherine Franke - President Art Medrano - Vice President Linda Fabre - Secretary Megan Dudo - Assistant Secretary/Treasurer Elizabeth Jones - Assistant Secretary/Treasurer All Directors were present except Dir. Jones, who arrived during Agenda Item 4, thus constituting a quorum. Also attending the meeting were Michael Luft, Makenzi Scales, and Leigh Catlin of Inframark; Bill Flickinger of Willatt & Flickinger; Herb Edmonson of Gray Engineering; Scott Knussman of Sunscape Landscaping; and District residents Gerald Burgess, Usha Divi, David Flores, Sherry Johnson, and Matthew Whittington. Agenda Item 1: Public Comments ¢ No action was taken on this item. Agenda Item 2: Report from the District's Engineer ¢ Ms. Scales discussed the District's water accountability. It was reported as 70%, but because of the read averaging from February 2021, there were about 300 connections that have lower usage than was reported. The actual water accountability number is about 95%, but the deficit will still appear. Numbers should normalize next month. e Mr. Edmonson updated the Board on Sunscape’s investigation of trees overhanging the CMU walls. There is a section of wall that is leaning and will need to be repaired; Ms. Scales is waiting to receive a quote from Fazzone for that work. e Ms. Scales discussed the residence at 3*** Cottonweed; the tree over the wastewater line has been removed and Inframark can raise the stack and re-sod that area of the yard in an amount NTE $4,000.00. ¢ Motion: Authorize Inframark to repair the stack at 3*** Cottonweed for an amount NTE $4,000.00. Motion by: Dir. Medrano Second by: Dir. Franke
Page 2
Aye: — Dir. Dudo Dir. Fabre Dir. Franke Dir. Medrano Not Present: Dir. Jones « Ms. Scales discussed meter replacement for meters that have over 1.5 million gallons of usage. The Board discussed the lifetime usage of analog vs. electronic meters; Dir. Fabre asked for the total number of electronic meters in place. e Mr. Edmonson updated the Board on the AWIA Risk Assessment, noting that he will address the Emergency Response Plan in May. e Mr. Edmonson updated the Board on the sidewalk improvements at Madeline Loop; the TCEQ CZP exemption was received. Ms. Scales noted that the budget is $40,000.00 for this project but Mr. Edmonson does not believe that amount is enough to cover it all. ¢ Mr. Edmonson discussed the sidewalk releveling maintenance. The District is not making repairs in Travis County, only in Williamson County; he will check the remaining budget to determine which repairs can be made. He discussed with Dir. Fabre removing and replacing certain sections of sidewalk versus repairing those areas. e Mr. Edmonson discussed the wastewater mainline and service repairs. He will complete the video review and certification and Inframark will work with Wastewater Transport Services to compete line jetting where needed. e Mr. Edmonson discussed a grading issue with the sidewalk in the 1400 block of Old Mill Road; he will meet with the Williamson County Public Works Department in May to further investigate the issue. e Mr. Edmonson discussed the District's MS4 permit; it needs to be renumbered after the submittal was 21 days late. The District will not incur fees as Inframark will pay them. Once a new number is received, the website can be updated with the correct permit number. » Mr. Edmonson noted that the Infrastructure Committee will be looking at a plan for an annual overview of maintenance. ¢ Dir. Fabre asked for an update on Mr. Edmonson's linking of projects to work authorization numbers. Agenda Item 3: Report from the Infrastructure Committee ¢ No action was taken on this item. Agenda Item 4: Report from the Parks Committee ¢ Dir. Jones arrived at the meeting during this item. ¢ Dir. Dudo noted that the Craft Fair is no longer a point of discussion as it will be held at the YMCA and not within the District. ¢ Dir. Dudo updated the Board on the park planning process. The Advisory Committee has met twice this month and a site visit with Verdunity is scheduled for May 3, where they will be able to speak with park visitors and the committee. Dir. Jones hopes for a large turnout and encourages community involvement during Verdunity’s visit. 2
Page 3
Dir. Dudo discussed the Advisory Committee; a survey will be released to the Board once it is complete and will also be posted to the website. Dir. Fabre asked for the names of the people on the Advisory Committee. No action was taken on this item. Agenda Item 5: Report from District Manager and Affected Persons, including Payment of Bills and Invoices and Transfer of Funds Ms. Scales noted that Wastewater Transport Systems will be in the District next week to jet lines, as approved. Ms. Scales said that the little library has been painted by Girl Scouts. Inframark will seal and install the library next week, weather depending. Mr. Knussman updated the Board on the status of the storm damaged limb pick-up. Sunscape has completed the residential side, but there are some residences that may have spring cleaning limbs or new branches rather than storm damaged limbs; he will check addresses sent to them and remove whatever material they can. Mr. Knussman has also discovered some branches at District parks that were missed in the initial pick-up or that have fallen since; he walked the parks with Dir. Jones to review areas for clean-up. Dir. Franke asked what the process is to report an address that needs to have limbs picked up; Ms. Scales said she could email Inframark and the information will be sent to Sunscape. Dir. Jones discussed hiring an arborist for the District. She spoke with Mr. Knussman and there are some damaged limbs that are too high for Sunscape to remove. Mr. Knussman additionally discussed the need for a tree pruning program to help with property values and health of trees. Ms. Scales updated the Board on the bathroom and water fountain repairs at Anderson Mill West Park; they have been completed, and work continues at the Lakeline Oaks building. Ms. Scales presented the manager's report. Dir. Fabre noted a high number of residents in arrears on their water bill. She asked how many accounts are delinquent on water bill payments, not only on deed restriction fines, and the total of those delinquent amounts; she asked for a report of delinquent water payments that displays how many, how much, and how long have they been delinquent. Ms. Scales confirmed that insurance can replace shrubs or trees that are completely dead and within 100 feet of a damaged building, up to an amount of $10,000.00. However, she does not know if the District will be eligible for FEMA funds, as another District impacted by the storm was assigned a FEMA representative that said that would not receive funds. Ms. Scales discussed an incorrect invoice from Sunscape that exceeded the NTE amount approved. Ms. Scales has received one proposal for additional insurance just prior to the winter storm. The building will need to be in working order/up to code before pursuing additional quotes. Ms. Scales asked to move Mr. Luft's report to earlier in the agenda to minimize his time spent in board meetings. Mr. Luft presented the District's financial report. 3
Page 4
Mr. Luft said that tree trimming was causing the District to be over-budget at this time. Mr. Luft will hold the JaniKing check until additional data is received regarding their invoice amounts. Mr. Luft and Dir. Franke discussed tax collections in the District. Mr. Luft will void and reissue the Sunscape check for Invoice #10736 in the amount of $11,157.40. He will reissue the correct amount of $10,000.00 once he receives the corrected invoice. Mr. Luft updated the Board on the true-up from the Williamson County Elections Department and the November 3 election prorate. Mr. Luft reviewed the Inframark invoices and credit memos that have been applied. Dir. Fabre discussed a revised Touchstone invoice in the amount of $701.05. She also noted that tax had been applied on the Vanguard invoices; Mr. Luft will provide them with a tax exemption form for the District. Dir. Fabre discussed check and invoice corrections. She noted an invoice for Sage Management that involved duplicate letter and asked to hold Check #5226 while she confirms information about the letters. She further noted that the Inframark invoice should have had a credit of $1,051.61 according to her records. Motion: Approve the check register in the amount of $335,727.37. The check to Sunscape will be voided and reissued. The checks for $4,453.00 to JaniKing, $230.00 to Sage Management, and $8,139.87 to Inframark will be held for further research. Motion by: Dir. Franke Second by: Dir. Fabre Aye: — Dir. Dudo Dir. Fabre Dir. Franke Dir. Jones Dir. Medrano Dir. Fabre requested that Mr. Luft run a report of the total amount of taxes paid by seniors in the District; Mr. Luft said that information is not supplied by the Counties, but he will ask. Agenda Item 6: Request for Qualifications for General Counsel Dir. Franke said she is not advocating for changing the District's general counsel but is following the recommendations by TCEQ and wants to let residents know the Board is looking at alternatives. The Board discussed the necessity of RFQs and purpose of pursuing one at this time. Motion: The Management Committee will put together an RFQ for general counsel and bring it back to the Board at the next monthly Board meeting. Motion by: Dir. Franke Second by: Dir. Fabre
Page 5
Aye: Dir. Dudo Dir. Fabre Dir. Franke Dir. Jones No: Dir. Medrano Dir. Medrano wanted to note that the Board is just exploring options. Although Mr. Flickinger cannot participate in the drat RFQ, he suggested that the committee review the firm’s detailed invoices from the past few years to see the services they offer, e.g. election season and audit season. Agenda Item 7: Minutes from prior regular and special meetings; Reconsideration of Minutes previously approved with oral revisions ¢ Motion: Accept minutes of the March 3, 2021 special meeting. Motion by: Dir. Fabre Second by: Dir. Franke Aye: Dir. Dudo Dir. Fabre Dir. Franke Dir. Jones Dir. Medrano ¢ Motion: Hold the minutes of the February 17, 2021 regular meeting and the March 31, 2021 special meeting until the next meeting. Motion by: Dir. Fabre Second by: Dir. Medrano Aye: — Dir. Dudo Dir. Fabre Dir. Franke Dir. Jones Dir. Medrano Agenda Item 8: Future Board Meetings — schedule and scope of agenda ¢ Dir. Fabre commented on the February averaging and the Board discussed issuing a notice to residents. ¢ No action was taken on this item. Agenda Item 9: Adjournment. ¢ Motion: Adjournment of meeting at 8:41 p.m. Motion by: Dir. Fabre Second by: Dir. Medrano Aye: Dir. Dudo Dir. Fabre Dir. Franke Dir. Jones Dir. Medrano
Page 6
Board of Directors Shane 4 aL Date