Minutes, regular meeting, February 17, 2021

Unofficial searchable copy. For the official record, use the district’s own copy.

Motions

Accept proposal from Sunscape for tree trimming around light poles.

Postpone the tree-trimming effort until the weather event and oak wilt season have passed and the list can be redone.

Completed project records from Gray Engineering should be electronically stored by the District in the shared drive so they can be managed by the District.

This Phase Five Sidewalk Improvements project proposal will be corrected to include the clear scope of services provided by the engineer, the not to exceed amount, and a timeline for completion.

Approve the following invoices from Gray Engineering: Invoice 58243 in the amount of $7,934.24, Invoice 58242 in the amount of $5,209.10, and Invoice 58241 in the amount of $86.47.

Approve the attorney to work with the Management Committee on an amendment to the Gray Engineering contract.

Send a Request for Qualification for an engineer for the District to explore costs and qualifications in today’s market.

The Infrastructure Committee will be in charge of reviewing and publishing the RFQ for engineering services for the District and will share the responses with the Board.

The engineer for the District be used to assist the Parks Committee under the existing additional services contract on a per-project basis that is approved by the Board in accordance with the existing contract.

Accept the proposal from Integrated Environmental in the amount of $23,000.00 for a repair at Rathlin and London Lane.

Accept the proposal from Alterman for an amount NTE $6,000.00

If Inframark breaks a resident’s pipes and there is a leak, the same billing fix will apply to everyone and the customer will receive a credit for the water waste.

Approve the check register in the amount of $414,932.95.

Beginning in March, Inframark will provide the manager report and financial packet five days prior to the Board meeting.

Approve the proposal by Verdunity in the amount of $20,000.00 for the parks planning project.

Accept Touchstone’s proposal for reservation software.

This Board will respect the First Amendment to the Constitution.

Adjournment of meeting at 12:02 a.m.

Page 1

MINUTES OF MEETING OF THE BOARD OF DIRECTORS
OF   #1
February 17, 2021
STATE OF TEXAS
§
§
COUNTIES OF WILLIAMSON AND TRAVIS
§
A regular meeting of the Board of Directors of   No. 4
was held at 6:00 p.m. on February 17, 2021 by remote access only in accordance with the March 16,
2020 Order by Governor Abbott temporarily suspending certain requirements of the Texas Open
Meetings Act to advance the goal of limiting face-to-face meetings to slow the spread of COVID-19. The
meeting was open to the public and notice was given as required by the Texas Open Meetings Act and as
modified by the Governor's Order.
The meeting was called to order at 6:05 p.m. and roll was called of the members of the Board, to-wit:
Catherine Franke
-
President
Art Medrano
-
Vice President
Linda Fabre
-
Secretary
Megan Dudo
-
Assistant Secretary/Treasurer
Elizabeth Jones
-
Assistant Secretary/Treasurer
All Directors were present, thus constituting a quorum. Also attending the meeting were Kristi Hester,
Michael Luft, Makenzi Scales, and Leigh Catlin of Inframark; Bill Flickinger of Willatt & Flickinger; Herb
Edmonson of Gray Engineering; Diana and Jimmy Sagnes of Sage Management; and District residents
Gerald Burgess, David Flores, Sarah Teale, Matthew Whittington, and Chris (no last name given).
Agenda Item 1: Public Comments
¢
Gerald Burgess addressed the Board with a public comment. He has worked in foreclosures and
notes that although his name would appear on paperwork regarding lawsuits, he did not receive
legal services and attorneys did not represent him personally, equating this situation with the
lawsuit against the Anderson Mill West Neighborhood Association. None of those Directors
receive personal benefits or legal representation, and the money allocated to them is legal and
warranted.
¢
David Flores addressed the Board with a public comment. He suggested that the money collected
via deed violations could be used to rent a truck or woodchipper to clean up the downed limbs
from the winter storm and to mulch the parks. He also said the money could be used to repaint
addresses on the curbs for the ease of EMS.
Mr. Flores addressed the Board regarding Agenda Item 6. He does not understand what is wrong
with the old system and wants to know if reservation costs will be increased to offset an additional
cost in addition to impacting resident and non-resident rates. He also thinks the MUD should have
its own YouTube channel.
Mr. Flores addressed the Board regarding Agenda Item 7. He suggested that the Board be
careful in violating someone's First Amendment rights to speak to their constituents.
¢
No action was taken on this item.
Agenda Item 2: Report from the District's Engineer

Page 2

Mr. Edmonson discussed billing concerns regarding the Madeline Pond sidewalk maintenance;
the only charges are for December 2020. Although there was no Infrastructure Committee
meeting, his office prepared proposals for various projects so everyone can review them and
there can be less concern on monthly billing authorizations.
Ms. Scales discussed water accountability for the District, which was at 81%, down 11% from the
previous month. She has researched Inframark’s numbers and formulas but found no error and
has asked the City of Cedar Park to investigate.
Ms. Scales presented proposals from Texas Tree Service and Sunscape regarding tree trimming
around streetlights in the District.
Motion: Accept proposal from Sunscape for tree trimming around light poles.
Motion by: Dir. Franke
Second by: Dir. Medrano
Dir. Fabre noted that the current weather has likely impacted the initial scenario and now oak wilt
season has come into play; the survey will need to be redone. She volunteered to amend this list.
Dir. Franke withdrew the motion.
Motion: Postpone the tree-trimming effort until the weather event and oak wilt season have
passed and the list can be redone.
Motion by: Dir. Fabre
Second by: Dir. Franke
Aye:
— Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Ms. Scales discussed the CMU wall survey; Dir. Fabre has reported a leaning section on Hatch
Road. Mr. Edmonson will assist to coordinate a wall survey; Ms. Scales has also sent reports of
limbs overhanging the wall to Sunscape. Dir. Franke suggested identifying damage from trees
falling on the wall to report to insurance.
Dir. Fabre wants to see paperwork from the wall construction and all repairs since. Mr. Edmonson
said he has not tracked repair costs but does have the original project costs.
Mr. Edmonson discussed Proposal No. 21006 regarding open records requests. He can assign
charges to specific requests for tracking purposes, so the District has information for specific
tasks.
The Board and Mr. Edmonson discussed whether this counts as a project; Dir. Fabre said Mr.
Edmonson should not be paid to retrieve records he completed for the District.
Motion: Completed project records from Gray Engineering should be electronically stored
by the District in the shared drive so they can be managed by the District.
Motion by: Dir. Fabre
Second by: Dir. Medrano
Aye:
Dir. Dudo

Page 3

Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Dir. Fabre asked if costs exceeded the $1,000.00 allocated for additional engineering services;
Mr. Edmonson replied that at least one did. Mr. Edmonson will discuss this with the Gray
Engineering attorneys; his firm must control usage and ensure that documents cannot be
amended or changed.
Dir. Franke said that the expectation is that open records requests will be handled under the
$1000.00 additional services between meetings.
Mr. Edmonson discussed Proposal 21009 for committee meetings that he attends and charges
for. Dir. Fabre asked if Mr. Edmonson was billing time to prepare for a meeting against the project
he will speak to at the meeting.
The Board discussed Gray Engineering's billing processes.
Mr. Edmonson discussed details of the Madeline Loop sidewalk project. The Board discussed
compensation for projects and how payment is allocated, i.e. construction vs. maintenance.
Mr. Edmonson discussed the Phase Five Sidewalk Improvements and reports that this work is
complete. His office will review and verify the work and process pay estimates.
Motion: This Phase Five Sidewalk Improvements project proposal will be corrected to
include the clear scope of services provided by the engineer, the not to exceed amount,
and a timeline for completion.
Motion by: Dir. Fabre
Second by: Dir. Medrano
Aye:
Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Mr. Edmonson discussed proposals for wastewater mainline and service maintenance repair
proposals. There is the wastewater line replacement project on Rathlin, five areas that need to be
excavated and repaired, as well as another section of mainline pipe that will need to be removed.
The Board discussed the price differences of the three proposals and how Mr. Edmonson advises
on which proposal to accept and how to handle contractor for additional work if the need arises.
The Board additionally discussed with Mr. Flickinger how to ensure the contractor completes the
work needed and fulfills the contract.
Mr. Edmonson discussed wastewater jetting in the District; Gray Engineering will need to review
the tapes and provide a certification letter for jetting.
Ms. Scales presented the Wastewater Transport jetting proposal in the amount of $4,800.00.
Motion: Approve the following invoices from Gray Engineering: Invoice 58243 in the
amount of $7,934.24, Invoice 58242 in the amount of $5,209.10, and Invoice 58241 in the
amount of $86.47.

Page 4

Motion by: Dir. Medrano
Second by: Dir. Franke
Aye:
Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No:
Dir. Fabre
Dir. Fabre voted no because these invoices have no authorization to proceed Board approvals as
required by Gray Engineering's contract.
¢
Dir. Franke discussed an addendum to the District’s contract with Gray Engineering, Inc. so a
directive from the Board during a meeting will not be met with a proposal to determine how long it
will take to complete the directive from the meeting.
¢
Motion: Approve the attorney to work with the Management Committee on an amendment
to the Gray Engineering contract.
Motion by: Dir. Franke
Second by: Dir. Medrano
Aye:
— Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No:
Dir. Fabre
Dir. Fabre noted that TCEQ recommends that MUDs rebid their contracts every five years. She
voted no because contract amendments should be in the interest of the District, not the
contractor.
Dir. Dudo said she agrees that contract should be in interest of everybody and an old contract is
not in anybody’s interest. Her Aye vote does not suggest that she does not think the District
should consider bidding the project to other vendors but working on the Gray Engineering
contract will be in everyone's interest.
¢
Motion: Send a Request for Qualification for an engineer for the District to explore costs
and qualifications in today’s market.
Motion by: Dir. Fabre
Second by: Dir. Dudo
Aye:
Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
¢
Motion: The Infrastructure Committee will be in charge of reviewing and publishing the
RFQ for engineering services for the District and will share the responses with the Board.
Motion by: Dir. Franke
Second by: Dir. Medrano

Page 5

Aye:
Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Mr. Edmonson discussed Park Issues proposal 21003, which includes park-related issues and
improvements as well as occasional attendance at Parks Committee meetings.
Motion: The engineer for the District be used to assist the Parks Committee under the
existing additional services contract on a per-project basis that is approved by the Board
in accordance with the existing contract.
Motion by: Dir. Fabre
Second by: Dir. Dudo
Dir. Dudo and Dir. Jones discussed Mr. Edmonson’s attendance at Parks Committee meetings
and believe this is already in place and can fall within the scope of additional services.
Dir. Fabre withdrew the motion.
Mr. Edmonson presented Invoice 52840 for attendance at Infrastructure Committee meetings to
the Budget Committee.
Agenda Item 3: Report from the Infrastructure Committee
The Infrastructure Committee's project list is not yet completed.
Motion: Accept the proposal from Integrated Environmental in the amount of $23,000.00
for a repair at Rathlin and London Lane.
Motion by: Dir. Franke
Second by: Dir. Medrano
Aye:
Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No:
Dir. Fabre
Dir. Fabre voted no because the bid tab is too disparate and there is too much risk to the District.
Ms. Scales noted that there are no documents the District currently owes to TCEQ; everything for
the MS4 is complete administratively and the notice of intent is in review.
Agenda Item 4: Report from District Manager and Affected Persons, including Payment of Bills and
Invoices and Transfer of Funds
Ms. Scales discussed a sewer backup at 3*** Cottonweed that occurred on the residential side.
The 6” stack is covered because the homeowners planted a tree over it but do not want to
remove the tree. The Board can instruct the homeowner to remove the tree off the 6” stack or it
can be moved closer to the sidewalk. Mr. Flickinger said that the District can cut down the tree
but likely cannot charge the homeowner for the work. However, he suggests not cutting down the
tree if there are other options. Ms. Scales will procure estimates on removing the tree and moving
the 6” stack for the next meeting.

Page 6

Ms. Scales discussed a check valve issue at the Hatch lift station. Alterman was called out to
clean the pumps due to high runtimes and additionally had to order new check valve replacement
for a total amount of $5,189.83, prior to freight shipping (which will cost approximately $150.00).
Motion: Accept the proposal from Alterman for an amount NTE $6,000.00
Motion by:
Dir. Franke
Second by: Dir. Medrano
Aye:
— Dir, Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Ms. Scales presented pictures of the storm damage to the Lakeline Oaks community center
building. A pipe burst in the ceiling; power and water are both currently cut to the building. She
has reached out to TNL and is filing insurance claims.
Ms. Scales discussed the many downed tree limbs in the District; Sunscape is working to clean
them up.
The Board discussed the cost of Sunscape emergency services on Friday to clean up limbs.
Ms. Scales updated the Board on a water line that was damaged during a repair at 3***
Cottonweed; Inframark staff repaired the damage and the resident will not be charged for the
water usage because of the leak.
Motion: If Inframark breaks a resident’s pipes and there is a leak, the same billing fix will
apply to everyone and the customer will receive a credit for the water waste.
Motion by: Dir. Fabre
Second by: Dir. Medrano
Aye:
Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Ms. Scales noted that trash and recycling services were delayed this week due to the weather
conditions.
Dir. Fabre asked if the District could consider using the downed material as chipped mulch; Ms.
Scales will investigate the cost of neighborhood chipping services.
Ms. Scales is waiting for an update from the Williamson County Sheriff's office regarding the
District's employment of deputies.
The Records Modernization Committee met to review the work that had been completed by the
former committee and discuss and work through the next steps.
Mr. Luft presented the financial report.
The Board and Mr. Luft discussed Jani-King charges and invoices that will need to be clarified.
6

Page 7

Dir. Fabre and Mr. Luft discussed Touchstone invoices and checks. The Board discussed the
Touchstone website and Inframark’s current involvement in the website.
Dir. Fabre indicated that the Maxwell, Locke and Ritter invoice in the amount of $16,000.00 was
not recorded in the audit expenses; Mr. Luft said that it was dated for February rather than
January and will appear on the February financials.
Dir. Fabre noted that the Waste Management invoice had increased because of fewer senior
accounts; Ms. Catlin explained that the number of senior accounts had been audited and Waste
Management was working from older data with more senior accounts than current reporting
shows.
Motion: Approve the check register in the amount of $414,932.95.
Motion by: Dir. Medrano
Second by: Dir. Franke
Aye: — Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No:
Dir. Fabre
Dir. Fabre voted no because the check register includes checks to Gray Engineering and Sage
Management who are operating outside of their contract terms.
Motion: Beginning in March, Inframark will provide the manager report and financial
packet five days prior to the Board meeting.
Motion by: Dir. Fabre
Second by: Dir. Medrano
Aye:
Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Medrano
No:
Dir. Jones
Dir. Jones is concerned that Ms. Scales will encounter difficulty in compiling all her information
within that time period.
Mr. Luft presented the quarterly investment report. He will review the report with the Investment
Committee and bring it back to next month's meeting for approval.
Agenda Item 5: Contract with Verdunity, Inc. for Professional Consultant Services in Connection with 5-
Year Parks Master Plan for the District
Dir. Dudo discussed the Verdunity contract for the parks planning process. The draft contract was
sent to Mr. Flickinger's office in December; the contract was reviewed and discussed with Dir.
Dudo and Dir. Jones who then negotiated the exact scope of services for the contract.
The contract amounts to $20,000.00 and closely mirrors what the original request for proposals
asked for and what was originally proposed during the interview process. A resident advisory

Page 8

committee will work with the contractor, providing updates to the full Board so everyone is able to
review and comment on items before going to adoption.
¢
Dir. Dudo hopes to have the advisory committee in place in March so the planning process can
be completed around the end of the summer.
*
Motion: Approve the proposal by Verdunity in the amount of $20,000.00 for the parks
planning project.
Motion by: Dir. Dudo
Second by: Dir. Jones
Aye:
— Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No:
Dir. Fabre
Dir. Fabre asked about a survey as she would like an option for residents to indicate that they are
not interested in the parks plan. Additionally, the park plan seems to only address Anderson Mill
West Park. She further noted that Inframark has been paid to complete a survey to provide all the
necessary information.
Dir. Dudo said that Inframark staff are not planners, social scientist, or survey authors; public
participation requires expertise and Inframark does not have that expertise to write a park
planning survey that will be integral and interwoven into a larger planning process. Inframark will
be responsible for administering but not authoring the survey.
The Board discussed the as-builts/design plans from Pharis Design and what the new plan
intends to achieve.
Dir. Fabre voted no because she finds it fiscally irresponsible to pay multiple contractors for the
same service, and irresponsible to spend money on a park plan during a pandemic before the
future of parks has been determined.
Agenda Item 6: Additional Services by Touchstone; New Facility Reservation System
¢
Dir. Dudo and Ms. Catlin discussed the District's reservation system, including disadvantages
and limitations of the old system and new features that can be offered on the new system as
presented by Touchstone.
¢
Motion: Accept Touchstone’s proposal for reservation software.
Motion by: Dir. Dudo
Second by: Dir. Jones
Aye:
Dir. Dudo
Dir. Franke
Dir. Jones
Dir. Medrano
No: Dir. Fabre
Dir. Fabre does not support tethering all technology to one vendor.
Agenda Item 7: Director postings on social media; Director contact with residents

Page 9

¢
Mr. Flickinger maintains this as a standing item in case an issue arises that merits discussion.
¢
Dir. Fabre and Mr. Flickinger discussed limitations on Board member communication with the
public.
¢
Motion: This Board will respect the First Amendment to the Constitution.
Motion by: Dir. Fabre
There was no second to this motion.
e
Dir. Dudo said that oath was taken by all Board members already when the oath of office was
taken. This situation is different because the Board is discussing misrepresentation in social
media by a Director of this Board.
¢
Dir. Jones discussed the cost to the District via open records requests.
e
No action was taken on this item.
Agenda Item 8: Minutes from prior regular and special meetings; Reconsideration of Minutes previously
approved with oral revisions
«
Mr. Flickinger said this item could be pushed to next Wednesday's meeting for approval because
of the late arrival of the minute drafts.
*
No action was taken on this item.
Agenda Item 9: Future Board Meetings -— schedule and scope of agenda
¢
No action was taken on this item.
Agenda Item 10; Adjournment.
*
Motion: Adjournment of meeting at 12:02 a.m.
Motion by: Dir. Medrano
Second by: Dir. Franke
Aye:
— Dir. Dudo
Dir. Fabre
Dir. Franke
Dir. Jones
Dir. Medrano
Board of Directors