Madeline Loop Pond - first phase: site amenities cost estimate
Unofficial searchable copy. For the official record, use the district’s own copy.
2016document2016-04-02 2016-04-022016-04-02-doc-madeline-loop-cost-estimate2016-04-02Page 1
Madeline Loop Pond - First Phase Site Amenities ITEM UNIT QTY. UNIT COST TOTAL REMARKS For entry off Madeline Loop, using previous "secondary sign" - arppoxmately MADELINE LOOP Entry Sign ea 1 $ 7,500.00 $ 7,500.00 11'-0" long and 4'-2" tall, includes lighting, irrigation, and small planting Secondary Entry Sign ea 1 $ 750.00 $ 750.00 For entry off Sunchase Blvd "Accesible Route from the Madeline Loop entry” Picnic Table ea 1$ 1,250.00 $ 1,250.00 Under arbor Exercise Equipment Is 1 $ 7,500.00 $ 7,500.00 *Subject to approval from TAS. VitaCourse Pull Up and Step Up Arbor/Pavillion Is 1$ 5,000.00 $ 5,000.00 Boulders ea 22 $ 300.00 $ 6,600.00 2'x 2'x 4' limestone smooth cut boulders 4 _|Dog scooper ea 3 $ 360.00 $ 1,080.00 Dog scooper post with bags [Trash receptacles ea 3.$ 300.00 $ 900.00 Subtotal $ 30,580.00 Hardscape ITEM UNIT QTY. UNIT COST TOTAL REMARKS Walkway - Concrete if 491 $ 22.50 $ 11,047.50 4' wide Walkway - Decomposed Granite If 1,580 $ 11.00 $ 17,380.00 4' wide DRAFT Bridge Is 1\$ 10,000.00 $ 10,000.00 Bridge over existing spillway ADA Concrete Ramp Is 1$ 3,750.00 $ 3,750.00 Includes concrete and handrail costs Concrete steps Is 1 $ 3,000.00 $ 3,000.00 At Sunchase Blvd entry 4' Black Chain Link Fence If 385 $ 20.00 $ 7,700.00 Black color, along existing culverts/spillways Subtotal $ 52,877.50 Planting ITEM UNIT QTY. UNIT COST TOTAL REMARKS _|Shade Tree ea 16 $ 500.00 $ 8,000.00 665 gallon F Ornamental Tree ea 21 $ 185.00 $ 3,885.00 20 gallon Tree Gator Bag ea 37 $ 100.00 $ 3,700.00 Plant Bed sf 770 $ §.50 $ 4,235.00 front entry plantings only Subtotal $ 19,820.00 Total $ 103,277.50 Contingency (15%) $ 15,491.63 118,769.13 GRAND TOTAL $