Madeline Loop Pond - first phase: site amenities cost estimate

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

Madeline Loop Pond - First Phase
Site Amenities
ITEM
UNIT
QTY.
UNIT COST
TOTAL
REMARKS
For entry off Madeline Loop, using previous "secondary sign" - arppoxmately
MADELINE LOOP Entry Sign
ea
1
$
7,500.00
$
7,500.00 11'-0" long and 4'-2" tall, includes lighting, irrigation, and small planting
Secondary Entry Sign
ea
1
$
750.00
$
750.00 For entry off Sunchase Blvd "Accesible Route from the Madeline Loop entry”
Picnic Table
ea
1$
1,250.00
$
1,250.00 Under arbor
Exercise Equipment
Is
1
$
7,500.00
$
7,500.00 *Subject to approval from TAS. VitaCourse Pull Up and Step Up
Arbor/Pavillion
Is
1$
5,000.00
$
5,000.00
Boulders
ea
22
$
300.00
$
6,600.00 2'x 2'x 4' limestone smooth cut boulders
4
_|Dog scooper
ea
3
$
360.00
$
1,080.00 Dog scooper post with bags
[Trash receptacles
ea
3.$
300.00
$
900.00
Subtotal
$
30,580.00
Hardscape
ITEM
UNIT
QTY.
UNIT COST
TOTAL
REMARKS
Walkway - Concrete
if
491
$
22.50
$
11,047.50 4' wide
Walkway - Decomposed Granite
If
1,580
$
11.00
$
17,380.00 4' wide
DRAFT
Bridge
Is
1\$
10,000.00
$
10,000.00 Bridge over existing spillway
ADA Concrete Ramp
Is
1$
3,750.00
$
3,750.00 Includes concrete and handrail costs
Concrete steps
Is
1
$
3,000.00
$
3,000.00 At Sunchase Blvd entry
4' Black Chain Link Fence
If
385
$
20.00
$
7,700.00 Black color, along existing culverts/spillways
Subtotal
$
52,877.50
Planting
ITEM
UNIT
QTY.
UNIT COST
TOTAL REMARKS
_|Shade Tree
ea
16 $
500.00
$
8,000.00
665 gallon
F
Ornamental Tree
ea
21 $
185.00
$
3,885.00 20 gallon
Tree Gator Bag
ea
37 $
100.00
$
3,700.00
Plant Bed
sf
770 $
§.50
$
4,235.00 front entry plantings only
Subtotal
$
19,820.00
Total
$
103,277.50
Contingency (15%)
$
15,491.63
118,769.13
GRAND TOTAL
$