Madeline Loop 2015 park improvements: construction documents (Pharis Design), edited January 18, 2016
Unofficial searchable copy. For the official record, use the district’s own copy.
2016document2016-01-18 2016-01-182016-01-18-doc-madeline-loop-plan-set2016-01-18Page 1
SHEET INDEX: COVER - Cover L1.1 - Hardscape Plan L1.2 - Hardscape Plan L1.3 - Hardscape Notes and Details L1.4 - Hardscape Notes and Details L2.1 - Landscape Plan L2.2 - Landscape Plan L2.3 - Landscape Notes and Details C1 - Miscellaneous Details C2 - Miscellaneous Details GENERAL NOTES: 1. A professional survey was not completed prior to the completion of this design. Landscape Architect is not responsible for accuracy of existing site conditions, including location of all utilities. 2. Contractor is responsible for locating all utilities prior to construction. Contractor must coordinate with Owner for final stake and layout of all hardscape elements prior to construction. 3.Contractor is responsible for field verifying that all elements are installed in compliance with 2012 TAS regulation. 4. Contractor shall be responsible for all coordination with his subcontractors to accomplish his scope of work. Contractor shall coordinate construction with other trades working on the site simultaneously. 5. Contractor shall notify Owner 48 hours prior to commencement of work to coordinate a pre-construction meeting. 6. Any required changes to the drawings resulting from the acceptance of contractor's alternatives and/or substitutions and the responsibility of the contractor and shall be submitted to the Owner for approval. 7. Contractor shall comply with all applicable ordinances and local codes. Any conflicting information shall be brought to the attention of the Owner. Required permits shall be obtained by the Contractor. 8. Contractor shall provide unit prices based on quantities on documents. Field conditions may affect actual location, increasing or decreasing the extent of the work bid. Changes to the extent of work resulting in an increase will be based on unit price and performed subject to approval of the owner in the form of a change order. 9. Contractor shall provide all labor, materials and supervision necessary to accomplish the work as shown and noted on the drawings unless otherwise specified. 10. Contractor to include a minimum 1 year warranty on all material furnishings and craftsmanship after final acceptance from Owner. 11. All existing trees are to remain, unless otherwise noted by Owner. 12. Contractor to field verify topo and existing site conditions prior to install. Notify landscape architect of any discrepancies before continuing. 13. Tree protection fencing, when required, must be in place prior to the clearing of the site or any construction and must remain until construction is complete. 14. Contractor responsible for maintenance of site during construction. Contractor to provide 90-day maintenance period after completion of construction. 15. Prior to start of construction contractor to provide material submittal package for Owner and Landscape Architect review. Submittal package to include soil, mulch, and rock samples and testing results; plant photos; irrigation product specification information; and any other product information within contractor's scope of work. 16. Contractor to provide closeout package after final completion of project. Package to include shipping tickets, irrigation manuals, warranty letter, and other manual/information of products within contractor's scope of work. 17. Contractor responsible for knowledge of existing site conditions - use of rock saw, jack hammers, etc to be included in pricing. WTCMUD#1 POND IMPROVEMENTS MADELINE LOOP - CONSTRUCTION DOCUMENTS OWNER: Williamson -Travis Counties MUD No 1 c/o Willatt & Flickinger 2001 North Lamar Austin, TX 78705 DISTRICT ENGINEER: Donald K. Bayes, PE Gray Engineering, Inc. TBPE No. 2946 8834 North Capital of Texas Highway Suite 140 Austin, Texas 78759 512.452.0371 PROJECT LANDSCAPE ARCHITECT: Moyara Pharis, LA Pharis Design, Inc. 2525 South Lamar #4 Austin, Texas 78704 512.853.9682 SITEWORK NOTES: 4. Contractor shall be familiar with existing site conditions and underground utilities, pipes and structures. Contractor shall take sole responsibility of any cost incurred due to bodily injury and/ or damage of owner's property or said utilities. Contractor is responsible for contacting utility companies before excavation. 2. Any conflicting information shall be brought to the attention of the Owner. Landscape architect and owner shall assume the contractor has incorporated the costliest item. 3.Do not willfully proceed with construction as designed when unknown obstructions and/ or grade differences exist that may have not been known during design. Such conditions shall be immediately brought to the attention of the Owner. The contractor shall assume full responsibility for all nescessary revisions due to failure to give such notifications. 4. Contractor is responsible for locating and protecting existing irrigation and landscape on site from any damage. Contractor shall notify Owner of any conflicts immediately. 5. The contractor shall be responsible for field verification of existing conditions, and shall perform field measurements prior to fabrication and/ or purchase of any material and shall contact Owner should existing conditions be different from the design drawings for this project. Conflicts arising due to lack of coordination shall be the responsibility and the expense of the contractor. 6. The contractor shall coordinate storing of materials, parking of vehicles and restrictions of work with the owner. Under no circumstances shall any contractor store materials or park vehicles under the canopy of an existing tree. t: All construction covered by these contract documents shall be in conformance with the latest edition of all applicable city and OSHA codes and standards including, but not limited to, the Uniform Building Code., enacted by The International Conference of Building Officials, most recent editions, and amendments as adopted by the local government. 8. Contractor is responsible for providing and servicing temporary toilet facilities. 9. Contractor is responsible for removal of trash and repair of hazardous conditions (tool, open holes, etc) on a daily basis by the end of the work day. Remove all excessive dirt build up on haul route as required daily and by noon on Fridays. 10. Coordinate with Owner for permissions should weekend work be necessary. 11. Contractor is responsible for any necessary temporary fencing. 12. Contractor shall coordinate with Owner and verify erosion and sedimentation control requirements. Landscape Architect is not responsible for erosion control. 13. Contractor responsible for any necessary repairs to existing conditions that occur during construction. 14.Contractor responsible for temporary water and power 15.Contractor responsible for removal of spoils generated during construction no later than 5 working days after completion of construction, unless otherwise specified to remain or be re-located within site. S 4262015 PHARIS DESIGN S. Lamar #4 Austin. Texas 78704 0: 512-863-9682 moyara@pharisdesign.net wirw pharisdesign.net ‘OWNER 00006 DEVELOPER OOOOH CONSULTANTS: o000« REVISIONS No] DATE - DESCRIPTION EOITEO: January 18,2016 PLOTTED: Dacomber 16,2015, PLOTTED BY: PHARIS OESIGN Madeline Loop 2015 Park Improvements CONSTRUCTION DOCUMENTS COVER
Page 2
?
{OTE: Exac: cation,
and longin ot accessible
ramp
to 28 fald verved. Create acess be
route that lows fortum arourd.
JOTE: step locaton and aty to
be ied venied. Steps to
iRdeate cone ang along,
this outa a ro for gor
(OTE. provide a evbt
5
30"s48" soace
ser TAS 305
|
Sees:
--
__NOTE: SIGN NOT TO BLOCK:
—BRIVEAND MAINTENANCE
‘ACCESS, FIELD VERIFY
EXACT LOCATION
Soe
FEE
a
ui.
wioTH
REFERENCE NOTES SCHEDULE
FIELD VERIFY
MAY BES"
PO
ACCESSIBLE ROUTE:
Madeline Loop
PHARIS
DESIGN
OWNER
vo000
DEVELOPER
KKK
CONSULTANTS:
0000
REVISIONS
INO|
DATE - DESCRIPTION
SYMBOL
DESCRIPTION
SYMBOL
DESCRIPTION
OOOOO
OO
4 0.6. Tra
4 Concrete Trai
Concrete Accessible Ramp
Conerete Steps
Spiltway Crossing
Arbor
Main Entry Sign
DETAIL
See Mis, Details Sheet C1
See Mise. Details Sheet C1
‘See Misc. Details Sheet C1
See Mise. Details Sheet C1
‘See Misc, Details Sheet C2
teats
See L1.3 and Misc. Details Sheet C2
2x2x4 Limestone Block
Anchored Limestone Block
Rock Berm
Mortared Angular Stone
Chin-Up Station
Sit-Up Station
Vertical Climb Station
CIIOIOISICIOIS}
4 Chainlink Fence
TEE
See Mise, Details Sheet
C1
443
mia
PER
ana
ants
SYMBOL
QESCRIPTION
Picnic Table
(8)
Grease
Trash Receptacle
(ia)
ene race
DETAIL
suid
sui
ma
8nd
ANGULAR FIELD STONE - MIN, 2" MAX. 10"
—-—-—
_UMITS OF CONSTRUCTION
NOTE:
1. The existing primary function of this facility is a detention pond and does not include parking areas, rest
rooms, telephones and drinking fountains.
2. Slopes not steeper than 1:48 shall be permitted at required clear floor spaces for amenities including, but
not limited, to trash receptacles, doggie bags, fixed seating (boulder seat blocks), bike racks, wheelchair
spaces, DG Pads etc.Refer to 2012 TAS 305
3. No object up to 80 inches above the finish floor or ground elevation, including all trees and vegetation,
shall protrude an accessible route. Refer to 2012 TAS 307.2 Limits of Protruding Objects.
4.If, due to unforseen conditions, a portion of a trail/ walk must exceed 5%, Contractor must request
authorization of Owner to construct a ramp. Contractor is responsible for coordinating the layout and
construction of any ramp with Owner. Contractor is responsible to field verifying that all elements are
installed in compliance with 2012 TAS regulation.
EDITED:
PLOTTED:
PLOTTED ay:
January 18,2016
ecember 16,2015
PHARIS OESIGN
NOTE:
-A professional survey was not completed prior to this design.
Landscape Architect is not responsible for accuracy of existing site
conditions.LIDAR topo information is 2 feet.
-Contractor is responsible for location all utilities prior to construction. Contractor
must coordinate with District Engineers for final layout and staking of all
hardscape elements prior to construction.
NOR,
90
feet
Madeline
Loop 2015
Park
Improvements
Hardscape
Plan
L1.1Page 3
{
i
REFERENCE NOTES SCHEDULE
SYMBOL
DESCRIPTION
DETAIL
4°
DG. Trail
See Misc, Details Sheet
C1
4 Concrete Trail
See Misc, Details Sheet C1
Concrete Accessible Ramp
See Misc. Details Sheet C1
Concrete Steps
‘See Misc. Details Sheet C1
‘Spilway Crossing
‘See Misc, Details Sheet C2
Arbor
1821.3
Main Entry Sign
See L1.3 and Misc, Details Sheet C2
2x2xd Limestone Block
Anchored Limestone Block
3/L1.3
Rock Berm
See Misc, Details Sheet C1
Mortared Angular Stone
4/L1.3.
®
®
®
®
Q
®
@
®
®
®
i)
i)
®
Chin-Up Station
nd
SitUp Station
214
Vertical Climb Station
ta
4 Chainlink Fence
4nd
Picnic Table
5ilt.4
Pet Station
eid
Trash Receptacle
714
Bike Rack
ani
ANGULAR FIELD STONE - MIN, 2" MAX. 10"
—+—-—
LIMITS OF CONSTRUCTION
NOTE:
1. The existing primary function of this facility is a detention pond
and does not include parking areas, rest rooms, telephones and
drinking fountains.
2. Slopes not steeper than 1:48 shall be permitted at required
clear floor spaces for amenities including, but not limited, to trash
receptacles, doggie bags, fixed seating (boulder seat blocks),
bike racks, wheelchair spaces, DG Pads etc.Refer to 2012 TAS.
305
3. No object up to 80 inches above the finish floor or ground
elevation, including all trees and vegetation, shall protrude an
accessible route. Refer to 2012 TAS 307.2 Limits of Protruding
Objects.
4.If, due to unforseen conditions, a portion of a trail/ walk must
exceed 5%, Contractor must request authorization of Owner to
construct
aramp. Contractor is responsible for coordinating the
layout and construction of any ramp with Owner. Contractor is
responsible to field verifying that all elements are installed in
compliance with 2012 TAS regulation.
NOTE:
-A professional survey was not completed prior to this design.
Landscape Architect is not responsible for accuracy of existing
site conditions.LIDAR topo information is 2 feet.
-Contractor is responsible for location all utilities prior to
construction. Contractor must coordinate with District Engineers
for final layout and staking of all hardscape elements prior to
construction.
PHARIS
DESIGN
SXACT LOCATIONS
TORE FELD Venn
‘OWNER
00006
DEVELOPER
XK
CONSULTANTS:
0000
REVISIONS
INO]
DATE - DESCRIPTION
EDITED:
January 18,2016
PLOTTED.
December 16,2015,
PLOTTEDAY:
PHARIS OESIGN
Madeline
Loop 2015
Park
Improvements
Hardscape
Plan
no
11.2
;Page 4
ARBOR CONSTRUCTION NOTES
-2'x6"
BEAM
2x4” RAFTERS, 6" O.C.,
CONCRETE FOOTER TO
TYP.
BE SIZED BY
eee
.
a
e
CONTRACTOR
{——
—
qi
1,
ARBOR TO BE SOLID STAINED DARK BROWN - CONTRACTOR TO.
——
=
1
FINALIZE COLOR WITH OWNER PRIOR TO STAINING.
es
{
QDOAAAAAA HOON OO AAA
Ao
]
2,
WOOD SIZES AND SPANS
IN THIS DRAWING ARE SUGGESTIONS ONLY,
Ht
ai
t
NOT A CONSTRUCTION DOCUMENT.
mam)
tH
ly er pcam
Lexa"
3.
ALL WOOD MEMBERS MUST BE PROPERLY SECURED WITH SCREWS
E
:
}
RAFTERS, 8°
AND BOLTS. CONTRACTOR TO MAKE FINAL SELECTION OF FASTENING
=
—
——
=
O.., TYP.
MATERIALS.
5
4,
CONTRACTOR TO MAKE FINAL SELECTION OF WOOD SIZES AND
fross
{—6'x6" PosT
‘SPANS.ALL WOOD MEMBERS MUST BE SMOOTH CEDAR
5,
CONTRACTOR TO PROVIDE OWNER WITH SEALED SHOP DRAWINGS
Eee
‘
d
FOR REVIEW, INCLUDING: WOOD SIZES AND SPANS, FOOTER SIZING
2
AND DETAILS, AND ALL FASTENERS, PRIOR TO ORDERING ANY
}
MATERIAL OR BEGINNING ANY CONSTRUCTION.
6.
CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT ALL ELEMENTS
c
3
ARE INSTALLED IN COMPLIANCE WITH 2012 TAS REGULATION.
eg
§
=
CONCRETE FOOTER TO.
=
——
=
a
[ee SIZED BY
ee
c
:
t
as
CONTRACTOR
i
:
i
fp
tHe
ay
ARBOR - PLAN VIEW
SCHEMATIC DESIGN ONLY.
ARBOR - SECITON VIEW SCHEMATIC DESIGN ONLY.
weer
rats
01.87
RAMPS ALONG SIDEWALK:
DECOMPOSED GRANITE PLAZA / TRAIL INSTALLATION:
1.
GENERAL
4.1.
The Contractor shall, at all times, keep labor and equipment on the job in sufficient numbers
to meet the goals of the Construction Schedule. The Owner will have the right to order that
additional labor and/or equipment be placed on the job when, in his judgment, progress on
the work is behind schedule.
2.
DECOMPOSED GRANITE WALK/ TRAIL SUBGRADE
2.1
The centerlines of walks will be staked on the site and the subgrade cut in 2.1 by
Contractor. The Landscape Architect and Client reserve the right to revise alignment after
staking to take best advantage of the lay of the land.
The Contractor shall get final approval
of path locations from the Designer, prior to commencing paving.
2.2 The slope of the walks shall not exceed 5% unless approved by the Landscape Architect or
Project Engineer. Cross slopes should not exceed 2%.
2.3. Tie-ins to bridges will be performed by use of smooth horizontal and vertical curves, not to
exceed 5%.
2.4
Contractor shall repair any ruts made by equipment in the walk subgrade prior to spreading
D.G. The subgrade shall be generally smooth and sloping to match the final sidewalk
surface.
OWNER
If, due to unforseen conditions, a portion of a trail/ walk must exceed 5%, Contractor must request
authorization of Client to construct a ramp. Contractor is responsible for coordinating the layout
and construction of any ramp with Client, Contractor is responsible to field verifying that all
elements are installed in compliance with
2012 TAS regulation.
sdesign.net
harisdesign.net
3.
MATERIAL AND INSTALLATION
0000
3.1
After placement of fill the grading/shaping contractor shalll regrade and compact to 95% of
proctor density for a depth of six (6) inches using a vibratory steel wheeled roller weighing
DEVELOPER
not less than five (5) tons. Areas that cannot be compacted must be demucked and replaced
with clean fill in order to ensure proper compacted subgrade.
OOK
3.2. Refer
to Client's drawings for details and finishes.
CONSULTANTS:
Contractor is responsible to field verifying that all elements are installed in compliance with
2012
TAS regulation.
00
EXISTING PARK SIGN PHOTO.
REVISIONS
INO]
DATE - DESCRIPTION
See Misc. Details Sheet C2 for sign detail
EXISTING CONCRETE CHANNEL
}
TET
=
PLOTTED:
Oecember 16.2015
3
—
me
PLOTTED BY:
PHARIS DESIGN
ANCHOR LIMESTONE
:
/
By
BLOCK TO ROCK
y
y
y
/
ee
‘
\
JN
s
—
Madeline
CONTRACTOR
2°x 2'x 4" LIMESTONE
~
4
{
Loop 2015
RESPONSIBLE FOR
BLOCK
/
ADDITIONAL
K
/
Park
REINFORCEMENT AS
\.
/\
oe
NECESSARY.
\
Improvements
2
orig
See
oe
PROPOSED PLANTING
oe
ROCK TO BE ANGULAR
EXTENTS OF EXISTING
/
-
z
ers
~—
\
/
EROSION CONDITION.
i
=
/
FIELD STONE. STONE
=
=
=
ON OUTER EDGES OF
2
SMALLER THAN 2" nS es
EXCAVATE 2' BEYOND
ON OUTER EDGES OF
PROPOSED PLANTING
HARDSCAPE
EXISTING ROCK
TREATMENT, SET STONE IN
LARGER THAN 10" IN DIA.
EXISTING EROSION
TREATMENT, SET STONE IN
NOTES AND
‘SHELF. EXCAVATE
CONCRETE TO ENSURE
STONES TO LOCK IN PLACE.
CONCRETE TO ENSURE
DETAILS
i
GRADE UNTIL
THEY REMAIN IN PLACE.
;
THEY REMAIN IN PLACE.
}
BEDROCK
/ ROCK
i
SHELF IS REACHED
\
ANCHORED LIMESTONE BLOCK
MORTARED ANGULAR STONE PLAN VIEW
H
wearer
ons
4
NOT TO SCALE
|
1 3
.Page 5
=<
MIRACLE RECREATION
bss
MIRACLE RECREATION
16-4 ——_—_
MIRACLE RECREATION
ADULT FITNESS CHIN-UP
ADULT FITNESS SIT-UP STATION
ADULT FITNESS VERTICAL
4'-0"
CHAIN-LINK FENCE
STATION
PRODUCT #160007
CLIMB STATION
VINYL COATED - BLACK COLOR
PRODUCT #160011
INSTALL WITH SIT-UP-SIGN,
PRODUCT #160015
www.chainlinkfence.com OR EQUIVALENT
|
INSTALL WITH CHIN-UP SIGN,
PRODUCT #160207
INSTALL WITH VERTICAL CLIMB
PRODUCT #160211 INSTALL.
+
&
INSTALL PER MANUFACTURER'S
5
‘SIGN, PRODUCT #160215
INSTALL PER MANUFACTURER'S INSTRUCTIONS,
PER MANUFACTURER'S.
3
INSTRUCTIONS ON DECOMPOSED
—
kf
INSTALL PER MANUFACTURER'S = POST TO BE SET IN CONCRETE FOOTERS.
INSTRUCTIONS ON
toot
GRANITE PAD
ven
=
INSTRUCTIONS ON
DECOMPOSED GRANITE PAD
SOLORMIRA-COTE SAND,
DECOMPOSED GRANITE PAD
CONTRACTOR TO SUBMIT DETAILS AND SHOP DRAWINGS TO OWNER FOR FINAL
COLOR:MIRA-COTE SAND
COLOR:MIRA-COTE SAND
I
SoMeRaaHERLEY
APPROVAL PRIOR TO CONSTRUCTION.
18-8"
CONTACT: JOSH BAILEY
512.636.0933
CONTACT: JOSH BAILEY
512.636.0933
=
>
Baha
inscom
§12.636.0933
—
woww.wwebuildfun.com
Product Specifications
Pr
i
i
wnw.webuildfun.com
Product Specifications
:
Pp
‘oduct Specifications
4
‘Adu Finess Course
6:12 Frese Coune
Gai
IMIRACLE Sit Up
LE Vertical Climb
teoort |
a
vers
Chin Up
=
aa
‘SiUp
~
sa
CHIN-UP STATION
SIT-UP STATION
3
VERTICAL CLIMB STATION
CHAIN-LINK FENCE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
KAYPARK RECREATION
BARCO PRODUCTS 55 GAL. RECEPTACLE WITH DOME LID
P H A RI S
2 #OD BLACK TUBE COATED PICNIC TABLE FRAME W/8' VINYL PLAST. TOP AND SEATS, ALMOND
MODEL #08CA1791, USE WITH DOME LID
S G
COLORS:ALMOND WITH BLACK POWDER COAT FRAME., OR APPROVED EQUIV.
wy harcoproducis.com
MATERIALS SCHEDULE
D E I
N
INSTALL PER MANUFACTURER'S INSTRUCTIONS
AYPARK RECREATION
OR APPROVED EAU.
meena}
Lasoicare ancorectia
INSTALL ONE STANDARD (PRODUCT #8J2GVP)
COMPLETE POLY PET
INSTALL PER MANUFACTURER'S INSTRUCITONS.
KEY
DESCRIPTION
COLOR
FINISH
STYLE
ary.
CONTACT
REMARKS
#520'S. Laciat.
INSTALL ONE WHEEL CHAIR ACCESSIBLE (PRODUCT #8J2GVP-EWC)
Pee anen #KoP1010
www.kaypark.com
OR APPROVED EQulv.
) 'D.G. Trail, 4°
INA
INA
|" compacted to 4" | 6,260 SF
|N/A
IREFER TO MISC. DETALS
7
800.553.2476
INSTALL PER
MANUFACTURER'S
Trash bins must be within
INSTRUCTIONS:
reach range and comply
ICONCRETE TRAIL, 4’
NVA
IBROOM
4 TRAIL
2,355 SF WA
IREFER TO MISC. DETALS
Tables must
with 2012 TAS 308, 308.2
comply with 2012
www.kaypark.com
and 308.3.
TAS 902, 902.2
800.553.2476
Provide a level clear floor
and 902.3.
space where bins are
JCCESSBLE CONCRETE |i
BROOM
|ACCESSIBLE
4Ls
Iva
REFER TO MSC, DETALS
Provide a level
mounted, Ground
3
nar
clear floor space
Surface s Slopes not
FIELD VERIFY Qt
aTY.
where tables are
Mounting height must comply
steeper than 1:48 shall be
ICONCRETE STEPS
WA.
BROOM
vA
its)
[WA
UANTITY.
mounted,
with 2012 TAS 308, 308.2 and
permitted. Comply with
2
REFER TO DETAL
Ground Surface
308.3.
2012 TAS 305,
's Slopes not
Provide a level clear floor
An accessible route must
steeper than 1:48,
space where pet waste stations
be provided to all bins.
ISPILLWAY CROSSING =—
|N/A
INNA
pes
TEAS
(NA
REFERIOIMSCADETARS
shall be
are mounted, Ground
Comply with 2012 TAS
permitted,
Surfaces Slopes not steeper
206,
OWNER
Comply with
than 1:48 shall be permitted.
(6)
ARBOR
DARK BROWN
NWA
INA
1EA
INA
REFER TO DETAIL
2012 TAS 305.
Comply with 2012 TAS 305.
baie
Sr occecsibe
An accessible route must be
REFER TO DETAL TO
ES
route must be
provided to:all:bet waste
@
MAIN ENTRY SIGN
IBLACKLETTERING
|LUEDERS
NA
1EA
INA
MATCH EXISTING PARK
provided to all
apie Comply with 2012
ISIGNS:
XXXKXKK
tables. Comply
Ns
with 2012 TAS
Bog MESTONE —
|LwesTONE
NA
WA
14€A
[WA
INA
CONSULTANTS:
206.
e000
6
PET STATION
TRASH RECEPTACLE
ROCK BERM
ENGULAR FIELD,
NA
REFER TO MISC. | 4135 SF |W
REFER TO MISC. DETALS
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
ISTONE
DETALS
.
”
.
fase
—
REFER TO DETAIL,
ICHINLUP STATION
ISAND
hva,
INA
1a
POSHBALEY, WEBULD
insTaLL WITH
REVISIONS
KAYPARK RECREATION
FUN 512.63610933
ASEOGITED SGN
WaT
DATE: DESCRIPTION’
AAO eaON
SUBMITTAL REQUIREMENTS
REFER TO DETAL,
BIKE RACKLODES
5:
|SIT-UP STATION
SAND
wa
WA
1EA
POSHBALEY WE BULD
INSTALL WITH
i
BIKE
[Photos [Shop Drawings [Samples [Mock-Up|Shipping Tickets [As bullt| Spec. Sheets|
(13)
-
FUN 512.63610933
Kay Park Recreation
IN GROUND MOUNTING
DG. TRAL
x
BSSOCIKTED SGN
Making People Places, People Friendly Since 1954!
| PRODUCT #613GIG
|CONCRETE TRAIL
NOSHBAILEY, WE BULD
|REFER TO DETAIL,
Email us: sales@kaypark.com or Call us: (800)553-2476
| INSTALLPER
|ACCESSIBLE RAVP
44)
VERTICAL CLIMB STATION |SAND
twa
INA
TEA:
[Ears eseaces
INSTALL WITH
613C1G
1301 Pine St. PO. Box 477 Janesville, 1A 50647
anueac ners
[LESAN ERORELS
x
ASSOCIKTED SIGN
INSTRUCTIONS
[SPILLWAY CROSSING
x
x
x
613CSM
AREOR
x
x
x
°CHANLINK FENCE
[BLACK
twa
twa
378uF
|WA
REFER TO DETAIL
www. kaypark.com
ENTRY SIGN
x
x
x
x
:
800.599.2476
[2Xax4 LIMESTONE BLOCKS
7
ae
WHEEL CHAR
je— sever
ANCHORED UMESTONE BLOCKS]
x
PICNIC TABLE
BLACK AND ALMOND
|N/A
JACCESSIBLE
1EA
|KAY PARK RECREATION
|REFER TO DETAL
5
eee!
[ROCK BERM
x
STYLE
EDITED.
January 18,2018
i
(So
IMORTARED ANGULAR STONE
3
PLOTTED: | acombe 16 2015
q
ICHIN-UP STATION
x
OTTED
BY:
- PHARIS OESIGN
a
>)
eioudew mielteanncer
SLOP STATON
x
PICNIC TABLE
BLACK AND ALMOND
|N/A
ISTANDARD STYLE]
1A
|KAY PARK RECREATION
|REFER TO DETAIL
|
space where bike are
VERTICAL CLIMB
STATION
x.
|
‘mounted, Ground Surface
i
wea
|
1900 Tums
$ Slopes not steeper than
TENCE
*
~
(a7) PET STATION
NWA
wa
wa
3A
|KAY PARK RECREATION
|REFER TO DETAL
Madeline
ae
|
batenate gamit,
BET STATDW
:
Feapi20ts
|
305.
[TRASH RECEPTACLE:
s
HRASHRECEPTACLE
[WA
WA
USE WITHDOME
|e”
|parco PRODUCTS
REFER TO DETAIL
Park
4
|)
rage
An
route must
BIKE RACK
x
uD
{
|
|
be provided to all bike
Contractor to submit any substitutions during the bid process. Substitutions that weren't approved during the bid
Improvements
i
1
Fee Ome wan 202
Brocess wel not pelaceented.
BIKE RACK
NVA
Jcanvanzeo
|NGROUND
1€A
|KAY PARK RECREATION
|REFER TO DETAIL
:
woe
—el
TAS 208.
MOUNT
}
EVATON VEY
Eran]
FOR EXCERCISE CIRUTS
}
7
|
sto? seco nova’
bona
D.G.PAD
wa
wa
le* compacted to 4" | 19CY
[WA
KAD ARBOR PAD
uaRDSCAPE
i
‘SUN CHASE DRAINAGE IMPROVEMENTS.
NOES the
() BIKE RACK
ANCHORED 2X 2X4
NOT TO SCALE
(9)
LIMESTONE BLocKs
__|tMESTONE
va
vA
SEA
|NA
REFER TO DETAL
( 1)
MORTARED ANGULAR
ANGULAR FIELD
12 MIN. 1-0" MAX
TK
Ts
acs
ISTONE
IN
DA
800SF
INA
REFER TO DETAIL
L 1
A
.
Contractor responsible for verifying all quantitiesPage 6
‘Desert Willow 2) American Beautybe: 3 ‘Bamboo Munly- @) Memterey Oak- 8) WITH OWNER OF OWNER'S REP. EXISTING VEGETATION TO REVAN, BUSTING VEGETATION TO EM CLEAN OUT UNDERBRUSH. LIMB U> TO DECIOE WHICH LINES, SLEAYOUT UNDERBRUSH. UB UP ~” ONLY AFTER MEETING ON SITE WITH OWNER OR OWNER'S REP, TO DECIDE WHICH LIVES Texas Recbug: a Madeline Loop PHARIS DESIGN OWNER: yo000« DEVELOPER OOHOHOHK CONSULTANTS: 090% PLANT_SCHEDULE is im IB COMMON NAME MEXICAN SYCAMORE TEXAS RED OAK MONTEREY OAK ORNAMENTAL TREES — COMMON NAME ©) MEXICAN PLUM. AMERICAN BEAUTYBERRY TEXAS SAGE © © ANNUALS/PERENNIALS COMMON NAME MEALY BLUE SAGE MEXICAN HONEYSUCKLE ©Oa fo; TEXAS SOTOL GRASSES COMMON NAME aaMBoo mune LINDHEIMER'S MUHLY (Om OM OM) CROSS VINE N —— UMITS OF CONSTRUCTION NATIVE AMERICAN SEED ‘DRAINFIELD MIX’ NOTES 1. All Existing Trees to remain, unless otherwise noted by Landscape Architect or Owner. 2. Contractor to field verify topo and existing site conditions prior to install. 3. All trees will be water with gator bags. Contractor must include 1 per tree and large shrub. 4, Flower beds and seeded areas to be watered with above ground temporary irrigation. 5, Temporary irrigation may be hooked to water truck or fire hydrant. Contractor to make arrangements with Severn Trent Services to have a construction meter placed. NOTE: 1. The existing primary function of this facility is a detention pond and does not include parking areas, rest rooms, telephones and drinking fountains. 2. No object up to 80 inches above the finish floor or ground elevation, including all trees and vegetation, shall protrude an accessible route. Refer to 2012 TAS 307.2 Limits of Protruding Objects. NOR, 90 feat REVISIONS No] DATE - DESCRIPTION ITED: January 18,2018 PLOTTED: —Oseember 16,2015 PLOTTED BY: PHARIS DESIGN Madeline Loop 2015 Park Improvements Landscape Plan L2.1
Page 7
: i i i Lindheimer's Munly: (17) Grenctewny¥/ /, (20) TLL LS 1 N Fry scat / PLANT SCHEDULE COMMON NAME NE SRSEGU SS. By in Ie MEXICAN SYCAMORE MONTEREY OAK TEXAS RED OAK Onc. ORNAMENTAL TREES COMMON NAME TEXAS REDBUD SHRUBS COMMON NAME AMERICAN BEAUTYERRY @ TEXAS SAGE ANNUALSIPERENNIALS COMMON NAME MEALY BLUE SAGE MEXICAN HONEYSUCKLE Qa cacn common NaMe fo} TEXAS SOTOL cnasses COMMON NAME BAMBOO MUHLY GULF MUHLY LINDHEIMER'S MUHLY ®O®Go VINEESPALIER COMMON NAME 'o) CROSS VINE ee LIMITS OF CONSTRUCTION NOTES 1. All Existing Trees to remain, unless otherwise noted by Landscape Architect or Owner. 2. Contractor to field verify topo and existing site conditions prior to install 3. All trees will be water with gator bags. Contractor must include 1 per tree and large shrub. 4, Flower beds and seeded areas to be watered with above ground temporary irrigation, 5. Temporary irrigation may be hooked to water truck or fire hydrant. Contractor to make arrangements with Severn Trent Services to have a construction meter placed. NOTE: 1. The existing primary function of this facility is a detention pond and does not include parking areas, rest rooms, telephones and drinking fountains. 2. No object up to 80 inches above the finish floor or ground elevation, including all trees and vegetation, shall protrude an accessible route. Refer to 2012 TAS 307.2 Limits of Protruding Objects. = oOo Ne PHARIS DESIGN ‘OWNER 0000 DEVELOPER OKO CONSULTANTS: 000% REVISIONS INO | DATE - DESCRIPTION EDITED: January 18,2016 PLOTTED: December 16,2015 PLOTTED BY: PHARIS DESIGN Madeline Loop 2015 Park Improvements Landscape Plan L2.2
Page 8
GENERAL NOTES 1, All Existing Trees to remain, unless otherwise specified. 2. Tree protection fencing, if required, must be in place prior to the clearing of the site or any construction and must remain until construction is complete. 3. Existing trees shall be mulched at a depth of three inches and a minimum radius of 10 feet from tree base. 4. Contractor to provide and install 4 inches of approved topsoil to all planting areas. 5. All disturbed areas shall be revegetated with a native grass mix. 6. Contractor to provide time and material value for trimming of plant material; prune existing trees to eliminate dead or broken limbs that might be hazardous to pedestrians that are within the Limits Of Construction and approved by Owner. 7. Contractor to field verify topo and existing site conditions prior to install. 8. All trees will be water with gator bags. Contractor must include 4 per tree and large shrub. 9. The Sun Chase Park contains an existing irrigation system. Contractor to verify if system can be expanded. 10. When irrigation cannot be extended, Temporary irrigation may be hooked to water truck or fire hydrant, Contractor to make arrangements with Severn Trent Services to have a construction meter placed. 11, Flower beds and seeded areas to be watered with above ground temporary irrigation, unless otherwise noted. 12, Temporary irrigation may be hooked to water truck or fire hydrant, Contractor to make arrangements with Severn Trent Services to have a construction meter placed. SPECIAL CONSTRUCTION TECHNIQUES: 1, Prior to excavation within tree driplines, or the removal of trees adjacent to other trees that are to remain, make a clean cut between the disturbed and undisturbed root zones with a rock saw or similar equipment to minimize root damage. 2. In cfitical root zone areas that cannot be protected during construction with fencing, and where heavy vehicular trafficis anticipated, cover those areas with four (4) inches of organic mulch to be produced on site, to minimize soil compaction. 3. Perform all grading within critical root zone areas with small equipment to minimize root damage. 4, Water all trees most heavily impacted by construction activities deeply as necessary during periods of hot, dry weather. Spray tree crowns with water periodically to reduce dust accumulation on the leaves. 5. When installing concrete adjacent to the root zone of a tree, use a plastic vapor barrier behind the concrete to prohibit leaching of lime into the soil. 6. Contractor is responsible for field verifying that all elements are installed in compliance with 2012 TAS regulation. 7. Contractor is responsible for tagging and sourcing all plant material. Plant material substitutions must be submitted to landscape architect for approval prior to purchasing, 8. Contractor must turn in pictures of all trees and large shrubs for landscape architect and owner's approval prior to purchasing. 9. Contractor is responsible for ensuring the quality and health of all plant material. 40. Landscape Architect to approve plant layout prior to planting. Contact landscape architect at least 48 hours in advance to schedule plant staking/layout approval. 11. All disturbed areas shall be revegetated with a native grass mix. 12. Contractor to stake all trees and bed-lines prior to construction for approval by Landscape Architect and owner. 13. Contractor is responsible for ensuring the quality and health of all plant material. 14. Existing trees shall be mulched at a depth of three inches and a minimum radius of 10 feet from tree base. 15. Prune all existing trees to eliminate dead or broken limbs that might be hazardous to pedestrians. SOIL CONDITIONING AND MULCHING 4. A minimum of 3 inches of organic mulch shall be added in non-turf areas to the soil surface after planting. 2. Non-porous material such as sheet plastic shall not be placed under the mulch. 3. A minimum of 2" permeable soil, native or imported, shall be required for turf and landscaped areas. The organic matter content of such soils shall be not less than 5% by dry weight. 4, Tree planting areas to be provided with a minimum of 12 inches of friable native loam soil (max. 40% clay, minimum 5% organic matter). Planting in relatively undisturbed existing native soils is encouraged. Soil to a minimum depth of 12 inches is required within the entire landscape median or peninsula. All other planting areas must have a minimum soil depth of 12 inches within a radius of six feet from the tree trunk, Trees are not to be planted in caliche, solid rock, or, in soils whose texture has been compacted by construction equipment. Areas of compaction which have been subsequently amended with 12 inches of friable native soil are suitable for planting, 5. Contractor to pocket amend planting areas with Geo Growers Thunder Dirt or equivalent. Amend area equal to two times the width of planting container. See planting detail below. rem. eDaNGOR eae nestaaNT HYDROMULCHING: is Provide guaranty for a period of one year after final completion and acceptance of project, that the installed native grass areas be alive and in a thriving condition. ms Reapply hydromulch to unacceptable areas during the Guaranty period. Guaranty shall not include damage or loss of lawn due to acts of God, acts of vandalism, or negligence on the part of the Owner. 3. PREPARATION A. __ Installation of Native Grass 1 Use a hydromulch (sprayer) and apply the mixture at the following rate. Mix in accordance with manufacturer's recommendations. 4. Hydromulch mixture as follows: Native Grass seed: see plan. Wood Cellulose fiber mulch - 50 Ibs. per 1000 sq. ft. Tackifier - per manufacturer's recommendation with a minimum of 1 Ib. Per 1000 sq. ft. Fertilizer - 10 pounds of actual nitrogen per 1000 sq. ft. (435 pounds per acre) of 16-20-8. Hydromulch shall be applied in a uniform cover. 5. 6. MAINTENANCE A : General 1 Water the completed installation as necessary to insure germination of grass. Zz Maintain grass areas until complete germination and establishment of all areas. ai Correct defective work as soon as apparent. Maintenance shall include, but not be limited to, weeding and fertilizing. 5S. CLEAN UP A. Remove trash and debris from the site. 6. ACCEPTANCE A. Substantial completion inspection to determine acceptance of grass areas will be made by Architect upon Contractors request after complete germination and coverage has been attained. FOR SEED PURCHASING INFORMATION CONTACT: Native American Seed Company Junction, Texas 1-800-728-4043 E-mail: info@seedsource.com http://www.seedsource.com/ STRIP RACEVONT 0 NOT Henny PRUNE THE Az Ghar cass aie THE NORTH SDE OF Ta Wve veneer Ap arate SUPER am Pear passate ser cr Roo amy rusiTo Eee SiGhER SLORY ORIN sous. METAL-T- STAKE 8 FT. Nan. Ye ee.cweorrow or raze ay——— … | INUNDISTURBED SUBGRADE sepont 3S SAM a secon eer ommle PREFERRED TREE PLANTING NOTES: 1, Remove nursery applied tree wrap, tape or string from tree trunk and crown, Remove any tags or labels. 2. Prune suckers off. 3. Set rootball level to grade or slightly above grade (/4") ifn clay soil. 4, Mulch 2"- 3" deep leaving 3" circle of bare soil around trunk of tree. 5. Fold down or pull back string, burlap or plastic exposing rootball. Remove all non-degradable materials. Do not remove, soil from rootball. 6. Break up sides of planting hole, 7. Center rootball in planting hole. Leave bottom of planting hole firm. Do not amend soil unless planting in poor or severly disturbed soil or building rubble. Use water to settle soil and remove air pockets and firmly set tree. 8, Do not stake unless in heavy clay soil, windy conditions, 3" or greater diameter tree trunk or large crown. If staking is needed due to these conditions ~Stake with 2 x 2 hardwood stakes or approved equal driven 6"-8" outside of rootball. -Loosely stake tree truck to allow for trunk flexing. -Stake trees just below first branch with 2" tree, connect from tree to stake horizontally. Do not use rope or wire through a hose.) -Remove all staking materials after one year. 9. Location of trees should comply with transportation set back, sight lines, etc. arms sexe RAIN GARDEN NOTES: 7. Provide protection from all vehicle traffic, equipment staging, and foot traffic in proposed infiltration areas prior to, during, and after construction. 2. Dimensions . Width of basin: 9' minimum. Depth of basin (from top of growing medium to overflow elevation); Simplified: 12°, Presumptive: 9-18". . Flat bottom width: 2' min. Side slopes of basin: 3:1 maximum. op a 3. Piping: shall be ABS Sch.40, cast iron, or PVC Sch.40. 3° pipe required for up to 1,500 sq ft of impervious area, otherwise 4” min, Piping must have 1% grade and follow the Uniform Plumbing Code. 4, Growing medium: a. 18° minimum b. sand/loam/compost 3-way mix to be approved by Landscape Architect prior to installation, provide sample, 5. Vegetation: Follow landscape plans 6. Install washed pea gravel or river rock between growing medium pockets. Tension Buckle TREE GATOR GAG. NSTALL PER MAN INSTRUCTIONS ACTERS SLREPUNTED SCH MAT se Weanrantthe wolcn wesoent AMMRINOF Tce YEAS 4 auntie Use ceo GROWERS THIOER Gear om SA RESS HONING SINGS OF CURUNG OR SIROUNG YALL BE REJECTED ony sousincwoe Fe SEMNEEN ts To 204 LOAM sauoy LOMMIY SOULS ARE DEFINED AS GRANULAR. OR ROCKY FRIABLE SOILS, AMOK PARTICLES WITH A ANIMUM OF #5 BY ORY WAIT ORGANRE MATTER. Th THE FOLLOUANG USOA TEXTURAL CLASSIFICATIONS AND HAVE. : aN NOTE THAT Soles AP CoMPAGTED AS TO IWPEDE ROOT GROWTH OR ORAMAGETHE SOK STRUCTURE SHALL NOT BE PLATY O8 Wiaseive Te eck MUST se ED FOR TEXTURE DAAHAGE CAPAGAITY Pr AND NUTRIENT VALUES PRIOR Yo DETERWMING PLANT SELECTIONS AND ANY ADDITIONAL SOIL MPROVENENTS, AENOVE AU Tying ROPE AND MARE, AND SAS ones REE RRS 'F ALAN Is GuPrEO 14TH A WARE BASKET ABOU fae phen Be ron id NTO PLANTING 109 SAIL ON UNEXCAVATED ee SHRUB PLANTING DETAIL WITH HARDWOOD MULCH CANOPY TREE AND ORNAMENTAL TREE PLANTING AND STAKING DETAIL Lis 2 LANDSCAPE_MATERIALS_SCHEDULE " wide belt-like, nylon or plastic straps (2 per tree on opposite sides of MADELINE LOOP POND IMPROVEMENTS, TREES ‘COMMON NAME / BOTANICAL NAME [CONT lary ADDALT. 1 [ADDALT.2 () Mexican Sycamore / Platanus mexicana esc 7 (3 Monterey Oak / Quercus polymorpha ‘Monterey 5G 6 1006 2006 (-) Texas Red Oak/ Quercus texana Gad gi 7006 1006 ‘ORNAMENTAL TREES ‘COMMON NAME / BOTANICAL NAME [CONT lary ©) Texas Redbud / Cercis canadensis texensis 206 g © Desert Willow / Chilopsis linearis 206 7 e Mexican Plum / Prunus mexicana 206 4 ‘SHRUBS: ‘COMMON NAME / BOTANICAL NAME (CONT lary ‘American Beautyberry / Callicarpa americana iG 7 (a) "Texas Sage / Leucophyllum frutescens EG 3 P H A RI S ANNUALS/PERENNIALS ‘COMMON NAME / BOTANICAL NAME. [CONT ary D E S IC IN © Mexican Honeysuckle / Justicia spicigera iG 76 RL lo) Mealy Blue Sage / Salvia farinacea 16 4 4 moyara@pharisdesign.net wy. pharisdesign.net CACTI [COMMON NAME / BOTANICAL NAME CONT lary 6 fo} Texas Sotol / Dasylirion texanum Ec 6 GRASSES ‘COMMON NAME / BOTANICAL NAME [coNT lary @ Gulf Muhly / Muhlenbergia capillaris 1G 30 O Bamboo Muhly / Muhlenbergia dumosa 1G 44 VINEJESPALIER ‘COMMON NAME / BOTANICAL NAME CONT ary oO ‘Cross Vine / Bignonia capreolata 1G 5 OWNER INERTS ITEM 7 NOTES UNIT lary 00004 NATIVE AMERICAN SEED-DRAINFIELD MIX. FOR [SF 2.440 DEVELOPER RAIN GARDEN, SEE HYDROMULCH NOTES OOOO ISOS AUR ACTIN ANGULAR FIELD STONE - FOR RAIN GARDEN. SEE [SF 1,070] NOTES ON PLANS CONSULTANTS: RAIN GARDEN SOIL RAIN GARDEN PLANTING SOIL. SEE RAINGARDEN [CY [CONTRACTOR seo. NOTES TO DETERMINE PLANTING SOIL PLANTING SOIL FOR PLANTING BEDS, POCKET cy [CONTRACTOR REVISIONS AMEND. TO DETERMINE INO | DATE - DESCRIPTION HARDWOOD MULCH FOR PLANTING BEDS (EXCLUDING RAIN GARDEN) |SF [CONTRACTOR TO CETERMINE SUN CHASE PARK DRAINAGE IMPROVEMENTS @ [Lindheimer's Muhly / Muhlenbergia Lindheimen iG a6 PLANTING SOIL PLANTING SOIL FOR PLANTING BEDS. POCKET cy [CONTRACTOR TO DETERMINE ‘AMEND. “oniractor responsible for veri ing all quantities SUBMITTAL REQUIREMENTS EDITED: January 18,2016 PLOTTED: Oseembsr 16, 2015 PLOTTED BY: PHARIS DESIGN Madeline Loop 2015 Park Improvements Landscape Notes and Details L2.3
Page 9
FILE: G:\CONST PROJECTS\919 WTC\10886 Park Play Equipment\Madeline Loop Park Improvement Plans\WIC DETALS.dwg
LAYOUT: MISC. DETALS(1)
DATE: 1/7/2016 4:38:40 PM
BY: RIASMAN
ge)
3
LEVEL LANDING
el
le
$8
ae
la]
28,888
Syeses
gle)
Seas
azly)
22
2eR%
WIDTH VARIES
2
FA
a
Bu
t
LEVEL LANDING
Maries
xe
SEE PLANS
|
CLEARANCE
Blasts
3
Pe
aiaj2}
s
BEE SOME Tie wes
ag
1/8
:
Th
~S
ely
ra
FINISHED GRADE
OE !2
=
USE EXCAVATED MATERIAL
|
13
fa
is
TOGE
OF PATH BACK
6” LAYER OF DECOMPOSED GRANITE COMPACTED TO 4”
|
uw
TO EXISTING GRADE
IS is
3
WEED BARRIER UNDER DG
Em fey
z
fry
East!
PROVIDE CROWN IN PATH FOR DRAINAGE
NOTE: DEPENDING ON SITE CONDITIONS,
COMPACTED SUBGRADE:
TRAIL MAY REQUIRE CROSS SLOPE (MAX. 2%)
FOR DRAINAGE; LOCATIONS TO BE DETERMINED
IN FIELD WITH OWNER,
d
IMUM_HORIZO!
TION
MAXIMUM RISE
MAXIMUM HORIZONTAL PROJECTION
DECOMPOSED GRANITE (DG) TRAIL W/O BORDERS DETAIL
ou
NTS.
SLOPE
IN
MM
FT
M
co}
S LMESTONE, BLOCK
1:12 TO < 1:16
30
760
20
9
a
CURB SET ON CONCRETE
:
e
fe
REFER’ TOyEUN
1:16 TO < 1:20
30
760
40
12
Aq
3
6" OF DECOMPOSED GRANITE
Zz
MATERIAL COMPACTED TO 4”
Ss
| — WEED BARRIER UNDER 0G
CONCRETE
RAMP RUN AND SAMPLE
3
DIMENSION
2
NTS.
g
&
(6" x 6" x 1/2") STEEL PLATE
MOUNT TO’ POURED CONCRETE BASE WITH
5
(1/2” X 10") ANCHOR BOLTS (STAINLESS STEEL)
36" MIN. IF RAMP IS LESS THAN 30’ IN LENGTH.
:
44” MIN. IF RAMP IS GREATER THAN 30’ IN LENGTH
(1/4" =
1
172")
3
DG TRAIL W/ BORDERS DETAIL
at
a
NOMS OA SEES HIRE
NTS.
EASE EDGE OF CONCRETE
3-0"
[_-)
aa
&
a
‘(AVOID SHARP EDGES)
——
0.31 MM (5/16"
oct TRAIL
GRADENTRENSITION
DECOMPOSED GRANITE TRAIL
al
fal
OMZ
NOTE
NOTE:
Ane
wee
7
BASEPLATES SHALL NOT
1.
CONCRETE TRAIL TO BE CONSTRUCTED
es
ae
sy
PER CITY OF AUSTIN STANDARD DETAIL
=
t
Es 4
bed
SADE MBEN SONS
iS ww
4328-1.
a S
A
PLAT!
Bom
NOTE:
a A
1.
HANORAILS SHALL BE PROVIDED ALONG BOTH SIDES OF RAMP SEGMENTS.
THE INSIDE HANDRAIL ON SWITCHBACK OR DOGLEG RAMPS SHALL ALWAYS BE CONTINUOUS.
=
2.
IF HANDRAILS ARE NOT CONTINUOUS, THEY SHALL EXTEND AT LEAST 12 IN. BEYOND THE TOP AND BOTTOM OF THE RAMP SEGMENT AND SHALL BE PARALLEL WITH
=
THE FLOOR OR GROUND SURFACE.
3.
THE CLEAR SPACE BETWEEN THE HANDRAIL AND THE WALL SHALL BE 1-1/2 IN.
4.
GRIPPING SURFACES SHALL BE CONTINUOUS.
oes
=
5.
TOP OF HANDRAIL GRIPPING SURFACES SHALL BE MOUNTED BETWEEN 34 IN. AND 38 IN. ABOVE RAMP SURFACES.
DG TRAIL TIE-IN_TO CONCRETE TRAIL
6.
ENDS OF HANDRAILS SHALL BE EITHER ROUNDED OR RETURNED SMOOTHLY TO FLOOR
, WALL, OR POST.
7.
HANDRAILS SHALL NOT ROTATE WITH THEIR FITTINGS.
NTS.
8.
MATERIAL: BLACK POWDER COATED GALVANIZED STEEL.
9.
CONTRACTOR IS RESPONSIBLE TO FIELD VERIFYING THAT ALL ELEMENTS ARE INSTALLED IN COMPLIANCE WITH 2012 TAS REGULATION.
10. CONTRACTOR MUST SUBMIT THE FINAL HANDRAIL DESIGN DETAILS TO OWNER FOR APPROVAL PRIOR TO PURCHASING ANY MATERIAL.
11, THE DIAMETER OR WIDTH OF THE HANDRAIL SHALL BE 1-1/4" TO 1-1/2" (32MM TO 38MM) ROUND.
VERTICAL GUARD RAlL
w
& oO
pa neem
4}
yp an,
ag
=
ce
T"\
be
CD)
ge
=
20 mo (209
a
Tam OF) BA SVODTT BOL
‘
\\
snoH Bowe
1"
MIN.
Seem
400 mm (16")
10360 80
omer \{
|
ove, SEE 10
ray
u
PB
ads SSP
—
vanes
s
‘ALTERATION OF A SEALED
vo
8k
1%
e
DRAWING WITHOUT PROPER
eer
om)
SLOPE
1-1/2" max. &
NOTIFICATION TO THE
pe
"
NOSING
a
RESPONSIBLE ENGINEER IS
Ron!"
1
min.
3
‘A VIOLATION OF THE TEXAS
RRS
eae T
s
ENGINEERING PRACTICE ACT.
[beac
oon aa
h
5
£8 pay{E)
B40 DION
8
a
Leouroncense PeRuateD FaERS, 8
z
”
+ spe
ae coumvevuy stamuaso te aenuanasceunuLstenSeOUENT
Seb
Aa tt Tal oa
=
<
SORES
SUG ASN MIB ADE Moston
ce
Seat hho on eS
Boe
ss
‘s
Rewrentiuor sys accunammy PuAceD AL
8
SAS seet elt ASS RELY Ss
.
§
Scanlan? ao tae te Seat SN
4. THE DIAMETER OR WITH OF THE HANDRAIL SHALL BE 1-1/4" TO 1-1/2" (32MM TO 38MM) ROUND.
secnon
HBA Saute ewe naetaner Seal ne
2. THE STRUCTURAL STRENGTH OF THE HANDRAIL SHALL COMPLY WITH ALL ASTM, ANSI, ADA AND ACCESSIBILITY
Eee Dae eer
na
STANDARDS OF THE STATE OF TEXAS.
CITY_OF AUSTIN
Aon
Ty oF AUSTIN
‘SIDEWALK
iy oF AUST,
‘SIDEWALK
3. CONTRACTOR MUST SUBMIT THE FINAL HANDRAIL DESIGN DETAILS TO OWNER FOR APPROVAL PRIOR TO
Pa
costed Mat tos
co's’ oy Nate tos
PURCHASING ANY MATERIAL .
SSTERE
"neo NEST | 6398-1
RECORD
COT SHED
03/248 [pe womreromman sees | AIS
4
RO SERGE?
93/28/08 | Bere
ae | 432S—1
4,
MATERIAL: BLACK POWDER COATED GALVANIZED STEEL.
ae | See
Pattee _ See Pee
Ses
TOBRIES [Fo TS
Lee
STAIR AND HANDRAIL DETAIL
OTE
NTS.
1. DOWNHILL CONDITIONS: USE EXCAVATED MATERIAL TO FEATHER GRADE AT EDGE OF PATH TO EXISTING GRADE. MAX. SLOPE
sueet C1
of
2Page 10
re 140 (512)452-0371 FAX(512}454-9933 2X4 TOP RAIL (SMOOTH CEDAR) 2X6 TREX CAP TO MATCH DECKING 8834 N. Capital of Texas Hwy. ‘Austin, Texas 78759 TBPE FIRM #12946 LENGTH OF SPILLWAY VARIES 4° GAP FROM DECKING [=———__ AT EACH LOCATION. §=—§ ——>4} TO TOP RAIL. FIELD NARIEY, EXISTING SPILLWAY 7 ] C 6" CONCRETE i ci r SUPPORT BEAM LLWAY HEADWALL, CONCRETE LANDING B ISIS rei z APPROX. 6” WIDE [] TOP RAIL '919—10886| DESIGNED BY: JANUARY 2016| CHECKED BY: 4° CONCRETE LANDING ENGINEERING PROJECT NO. ] BOTTOM RAIL —) lo d CARRIAGE BOLT [— BRIDGE SPAN WITH (3) EVENLY SPACED 2X8 TREATED LUMBER BOLTED TO HEADWALL. USE 2X6 SMOOTH CEDAR BOARDS AS DECKING. SCREW ALL DECKING onar WALUSTRS! ST 0d J | a 2X4 BOTTOM RAIL COLOR MATERIAL ON TO 2x8. 4” GAP_FROM DECKING TO BOTTOM RAIL. NOTE: 1. TOP RAIL, BOTTOM RAIL, BALUSTERS TO BE SOLID STAINED LIGHT CARAMEL ~ CONTRACTOR TO FINALIZE COLOR WITH OWNER PRIOR TO STAINING. BRIDGE RAILING DETAIL BRIDGE DETAIL NTS. NTS. 1. BRIDGE AND RAILING TO BE SOLID STAINED LIGHT CARAMEL — CONTRACTOR TO FINALIZE COLOR WITH OWNER PRIOR TO STAINING. 2. CONCRETE LANDING AND DECK TO BE SET FLUSH WITH EACH OTHER. BY | DATE [REVISION DESCRIPTION NO. SEE BRIDGE RAILING DETAIL —— 2'-6" SQUARE X 2” THICK LEUDERS LIMESTONE. MOUNTED ON REINFORCED CMU WALL. USE 2” CAP, WITH 2” SHADOW OVER SIGN AND [- 2" X 6” SMOOTH CEDAR BOARDS CMU. "7 5 STUCCO BACK OF SIGN AND PAINT TO MATCH | (3) 2" X 8° TREATED LUMBER LEUDERS. (ON ENO) SIGN WORDS TO BE ENGRAVED ON LIMESTONE. FONT: RINGBEARER MODIFIED TO MATCH ADJUSTMENTS DONE FOR THE METAL LETTERS z WATER JET PROCESS. 2015 PARK IMPROVEMENTS oe if MADELINE LOOP CONCRETE SUPPORT BEAM : [Madeline Loop Park SECTION A: NTS. *TYPE FACE AIRBRUSHED BLACK. SEE BRIOGE RAILING DETAIL EXPOSED CONCRETE FOOTING TO BE DESIGNED BY STRUCUTRAL ENGINEER AND SUBMITTED FOR APPROVAL BY OWNER 2” X_6" SMOOTH CEDAR BOARDS (3) 2” X 8" TREATED LUMBER (ON END) (2 OF 2) 1/4" STEEL “L” BRACKET W/2-CARRAIGE BOLTS MISC. DETAILS (3) 2" X 8" TREATED LUMBER (ON END) BACK FACE OF WALL UNFINISHED PAINTED TO MATCH LIMESTONE. EXISTING CONCRETE STRUCTURE NOTICE: ALTERATION OF A SEALED * CONCRETE CURB AT ASTER PASS POND TO BE MODIFIED TO MATCH TOP OF BERM. CONTRACTOR TO RECIEVE DRAWING WITHOUT PROPER APPROVAL FROM OWNER PRIOR TO MODIFICATION AND INSTALLATION OF BRIDGE. NOTIFICATION TO THE. RESPONSIBLE ENGINEER |S ‘A VIOLATION. OF THE TEXAS SECTION B-B | ENGINEERING PRACTICE ACT. NTS, . EDGE OF INTERIOR WALL SIGN TO FACE ROAD EDGE OF OUTER CAP PARK SIGN DETAIL FILE: G:\CONST PROJECTS\919 WIC\10888 Park Play Equipment\Madeline Loop Park Improvement Plans\WIC DETALS.dwg LAYOUT: MISC. DETALS(2) DATE: 1/7/2016 4:30:23 PM BY: RJASMAN