Storm Water Management Program checklist (prepared September 29, 2015)

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

Section
Program with
Reference Number
Task
Completed By
Frequency
Target Date –First
Implementation
Status
1.2
Availibility of elements
to the target audience
Post information on website. Including
artwork created by school students.
Post information at the community center
on a bulletin board
District Manager
Annually
late 2015
In progress
1.3.1
Utility Bill Stormwater
Memo/Inserts
Inserts provided by City of Cedar Park or
City of Austin to be mailed by the district
to residents and businesses. District will
keep record of annual distribution count
District Manager
Sept. 2015
Sept. 2016
Sept. 2017
October 2015
Desgin inserts for
October mailing
1.3.2 & 2.3.2
Annual Poster
Campaign
Produce posters and place in parks or
schools. Allow schools to help create
posters. Meet with art teachers
District Manager
Board Committee
Annually
September 2015
April 2016 - Earth Day
Patricia to contact art
teachers for
elementary and
middles schools
2.3.1
Yearly Public Meetings
Hold Public meeting in district to discuss
stormwater pollution concerns.
Advertise meeting to public 30 days prior
to scheduled date.
Solid Waste
Committee
District Manager
Oct. 2015
Oct. 2016
Oct. 2017
October 2015
April 2016 - Earth Day
Late Sept - post on
website
2.3.3
Storm drain
Stencil/Tiles
Install informative pollution prevention
tiles to district storm water inlets.
Encourage local participation such as
Boy/Girl Scout Troops & residents.
District Manager
Annually
September 2015
April 2016 - Earth Day
Working with Eagle
Scout to complete tile
installation
Storm Water Management Program (SWMP) Checklist
 
GJA No. 919-10815-42
1.0
Public Education
2.0
Public Involvement
Prepared by Patricia Rybachek
9/29/2015
Severn Trent Services
Revised 8/5/2015

Page 2

Section
Program with
Reference Number
Task
Completed By
Frequency
Target Date –First
Implementation
Status
3.2
TPDES Permit
Requiremments
Implement & enforce a program to
detect, investigate, and eliminate illicit
discharges in small MS4. Must include a
plan to detect and address non-
stormwater discharges, including illegal
dumping to the MS4 system.
District Manager
As needed
June 2018 (term end
date)
Patricia to discuss with
Kristi
3.4.1
Storm Sewer Map
District to create storm sewer map
including locations for potential sanitary
system discharges. Copies will be
distributed to schools throughout the
District. Secretary to keep map on hand.
District Engineer
Infratructure
Committee
One time
Existing
Distribution to schools
September 2015
Provide storm sewer
map to Paul
(Secretary).
3.4.2
Board Member &
StaffTraining
District to create a list of training
schedule, materials, and procedure for
detecting and reporting illicit discharge.
Board Committee
As Required
September 2015
Create SOP fpr STS
staff
4.3.1
City of Cedar Park
Development
Specifications
District should review the proposed
development guide to determine all
development within the District is abiding
by the required specifications.
District Engineer
On-going
Current
4.3.2
Site Inspection and
Enforcement
District to record number of
noncompliance citations to development
within District
District Manager
As Required
Current
4.3.3
Construction Plan
Review Procedure
District to distribute construction site
stormwater brochure to contractors and
developers within the district.
District to also record the number of
brochures distributed and maintain a file
copy of the brochure for each year.
District Manager
As Required
Current
4.0
Construction Site Runoff Control
3.0
Illicit Discharge Detection & Eliminaton
Prepared by Patricia Rybachek
9/29/2015
Severn Trent Services
Revised 8/5/2015

Page 3

Section
Program with
Reference Number
Task
Completed By
Frequency
Target Date –First
Implementation
Status
5.0
Post Construction
Stormwater Mgmt
5.3.1
City of Cedar Park
Development
Specifications
District to maintain copies of manual and
distribute to construction operators.
District Engineer
& Infrastructure
Committee
As Required
Current
6.3.1
Catch Basin Cleaning
Drainage System
O&M Schedule
Inspect and clean catch basins as
needed and document cleaning dates,
problem areas and required
maintenance, if needed.
District Manager
On going
Current
6.3.2
Hazardous Materials
Management
Compile list of materials used within the
district. Research alternatives and
conduct cost/benefit assessment.
Solid Waste
Committee
District Manager
As Required
September 2015
6.3.3
Spill Response Kits
District to maintain spill kits and ensure
they are located at appropriate facilities.
District Manager
As Required
Current
7.1
Record Keeping
District will store annual reports &
required documents for TCEQ
compliance.
Annual reports are to be presented to the
Board of Directors each year.
District Manager
May 2015
May 2016
May 2017
Current
7.2
Reporting
District will submit annual report to
TCEQ by the anniversary (of the
following year) for each year of the
premit term.
District manager
May 2015
May 2016
May 2017
Current
7.0
Record keeping and
Reporting
6.0
Pollution Prevention / Good
Housekeeping for Municipal Ops
Prepared by Patricia Rybachek
9/29/2015
Severn Trent Services
Revised 8/5/2015