Notice of Phase 2 street light enhancement program
Unofficial searchable copy. For the official record, use the district’s own copy.
2013document2013-12-09 2013-12-092013-12-09-doc-phase2-final-ltr2013-12-09Page 1
Notice of Phase 2 Street Light Enhancement Program This is to inform you about Phase 2 of the Street Light Enhancement Program, which will begin construction in about 60 days. It will add 42 street lights throughout the District at locations where there is an absence, or insufficiency, of street lighting. The locations of the new street lights in Phase 2 will be: Coves where no lighting currently exists; mail boxes with no nearby lighting; and general areas with insufficient lighting. Estimated construction cost is $147,000. A drawing of the entire Program detailing the Phase 2 street light locations as well as those completed in Phase 1 and the current projections for Phase 3 is available at the MUD web site, www.wtcmud1.org. You are invited to review the drawing to determine how your immediate neighborhood will be affected. The drawing is also available for resident review at the WTCMUD#1 District building at 1000 Old Mill. Access to the building is available by appointment and during MUD meetings on the second and third Wednesdays of each month, at 7 and 6 PM respectively. The goal of this phase of the Program, as with the other phases, is to increase the security and attractiveness of our neighborhoods and thereby increase property values. Phase 1, recently completed at a cost of $89,100, added 24 new lights on major streets in high traffic areas of El Salido, Dagama (adjacent to the park) and Old Mill. You will notice that the area of El Salido from Old Mill to Aster Pass and Dagama at the Anderson Mill Park where previously there was only one street light is now well lit. This is an important improvement for the Cypress Elementary School and users of the Park, especially in the winter. The Program was developed over a two year period by the MUD Board of Directors with the assistance of the MUD Infrastructure Committee and Gray Engineering.