WTC MUD #1 RecordsBoard minutes, agendas and votes

Street light Phase 2 contractor as-built drawings (2013)

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

fo
ex
3
S
LEGEND
EXISTING STREET LIGHT W/ID NUMBER
PHASE
1
STREET LIGHT LOCATION
PROPOSED PHASE 2 STREET LIGHT LOCATION
FUTURE STREET LIGHT LOCATION
MAILBOX LOCATION
PROPERTY ADDRESS:
DISTRICT BOUNDARY
MATCH LINE ‘At
TYPICAL EXISTING STREET
UGHT FIXTURE INSTALLED
—~
IN PHASE
1
CONTRACT
PROPOSED
LOCATIONS
KEYNOTES:
)
PROPOSED LIGHTING FIXTURE, PROVIDE 1” CONOUIT WITH 5 $10 FROM
TRANSFORMER PULLBOX TO POLE BASE AND LIGHTING FIXTURE. SEE DETAIL
“A/E+" FOR TRANSFORMER PULLBOX WORK.
@) PROPOSED USHTING FXTURE, PROVIDE 1" CONDUIT WITH 3 410 FROM
METER PEOESTAL. SE DETAIL "B/E4” FOR METER PEDESTAL WORK.
G) EXTEND 1" CONDUIT WITH 3 10 FROM TRANSFORMER PB_UNDER
DRIVEWAY AT 2306 ADORESS PROPERTY LINE 70 POLE LOCATION. PROVIDE
POLE UGHT WITH IN GROUND HANDHOLE THIS LOCATION, PROVIDE 2-0"
CUT ACROSS DRIVEWAY AND PATCH PER DETAILS °A,8,0/E6"
4)
THIS LOCATION MAY HAVE BOTH A PAD MOUNTED XFMR AND METER
PEDESTAL. PROVIDE SERVICE TO POLE AS NOTED.
G
FIELO VERIFY EXISTING STORM ORAIN LOCATION, LOCATE LIGHT FIXTURE
AND CKT TO SIDE OF STORM DRAIN,
&
FIELD VERIFY EXISTING MAIL BOXES LOCATION. LOCATE LIGHT FIXTURE
AND CKT TO SIDE OF MAIL BOXES.
@
CUT AND PATCH SIDEWALK THIS LOCATION. SEZ SIDEWALK DETAILS
SHEET E6, A, B & C FOR CUT AND PATCHING STANDARDS.
@) SIDEWALK 1S ADJACENT TO CURB, LOCATE POLE BASE IN SIDEWALK, PATCH
AND EXTEND SIDEWALK TO MAINTAIN 4’-0" WIDTH PER DETAIL "D/IE4"
@) FIELD VERIFY EXISTING FIRE HYDRANT LOCATION. LOCATE POLE 8'~0" TO THE
NORTH (OR TO RIGHT, FACING HOUSES) OF METER PEDESTAL IN SIDEWALK.
EXTEND SIDEWALK AROUND PROPOSED LOCATION TO PROVIDE MINIMUM 4'~9"
WIOTH SIDEWALK AT ANY FOINT.
(40) LOCATE POLE APPROXIMATELY 27 FEET NORTH TOWARD MAILBOXES IN
GRASSY AREA,
(11) LOCATE POLE TO THE NORTH ENOUGH SO THAT SIDEWALK CAN BE
ADDED TO MAINTAIN 4’—0" WIDTH ALL LOCATIONS.
GENERAL NOTES:
1.1 1S RECOMMENDED THAT THE CONTRACTOR VISIT EACH PROPOSED POLE
UGHTING FIXTURE LOCATION TO DETERMINE THE FULL EXTENT OF ELECTRICAL
WORK PRIOR TO SUBMITTING HIS CONTRACT BID FOR WORK. HE SHALL INCLUDE
ALL COSTS FOR EACH POLE LOCATION AND [TS ELECTRICAL SERVICE, WITld
CONSIDERATION FOR SITE CONDITIONS, ALONG WITH THE MINIMUM REQUIREMENTS
SPECIFIED BY THESE DRAWINGS AND SPECIFICATIONS.
2. COORDINATE ALJ. PROPOSED POLE LGHT FIXTURE CKTS WITH EXISTING
UNDERGROUND UTILTIES, ABOVE GROUND MAILBOX LOCATIONS, STORN DRAIN
OPENINGS, TREE ROOTS, ETC.
PARTIAL SITE
cnet
|
af
oval
g
38
Hl
iB
lg
3
att
iy
Cate.
TYPICAL
TING STREET LIGHT
Ue
cFIXTURE INSTALLED IN PHASE
1
cones
WwW
TYPICAL FUTURE STREET UGHT
TO BE INSTALLED IN PHASE 3
@
SCALE:
1" = 300'-0"
PLAN - SOUTH Le Pe
JTRSA
JAMES R. SCHULTZ & ASSOCIATES
Drive,
Texas
REVISION
5
S|
Be
A
2
4g
53
EI]
PHASE 2 - STREET LIGHTING IMPROVEMENTS
AUSTIN, TEXAS
WILLIAMSON-TRAVIS COUNTIES MUD
WTC STREET LIGHTING
NQTICE:
ALTERATION OF A SEALED}
ORAWING WITHOUT
PROPER NOTIFICATION TO.
THE RESPONSIBLE
ENGINEER IS A VIOLATION
OF
EXAS.
THE Tt
ENGINEERING PRACTICE
ACT,

Page 2

Ny
/
SCALE:
1"=300'
|__
GRAPHIC SCALE IN FEET
150-300
450——«600.
SEALS
A.
—LIGHT FIXTURE INSTALLED
TYPICAL EXISTING STREET
|— IN PHASE
1. CONTRACT
® PROPOSED POLE LIGHTING FIXTURE, PROVIDE 1” CONDUIT WITH 3 #10
FROM TRANSFORMER PULLBOX TO POLE BASE AND LIGHTING FIXTURE. SEE
DETAIL "A/E4” FOR TRANSFORMER PULLBOX WORK.
(2) Not useD THIS SHEET.
(
NOT useD THIS SHEET.
(@ NoT USED THIS SHEET
© FIELD VERIFY EXISTING STORM DRAIN LOCATION. LOCATE LIGHT FIXTURE
AND CKT TO SIDE OF STORM DRAIN.
® FIELD VERIFY EXISTING MAIL BOXES LOCATION. LOCATE LIGHT FIXTURE
AND CKT TO SIDE OF MAIL BOXES.
(Z) CUT AND PATCH SIDEWALK THIS LOCATION.
7)—PARTIAL SITE PLAN - NORTH
SCALE:
1” = 300’-0"
‘TEPE
(612) 452-8789
JRSA
JAMES R. SCHULTZ
& ASSOCIATES:
6101 West Courtyard Drive, Bldg. 1, Suite 200
ck
CHECKED
OF
IRS.
‘DRAWH BY:
BLH
REVISION,
JR. SCHULTZ|
ENGINEER:
DESIGNED
BY:
BLH
io.
bate,
WILLIAMSON-TRAVIS COUNTIES MUD1
WTC STREET LIGHTING
PHASE 2 - STREET LIGHTING IMPROVEMENTS
AUSTIN, TEXAS
NOTICE:
|ALTERATION OF A SEALED}
DRAWING WITHOUT
PROPER NOTIFICATION TO
THE RESPONSIBLE
ENGINEER IS A VIOLATION
OF THE
TEXAS
IE
ENGINEERING PRACTICE
ACT.
ANY
Sey
%G “thee.
Zps
JOB NO:
DATE:
06/17/13
SCALE:
SHEET NO
E3