Minutes, regular meeting, April 17, 2013
Unofficial searchable copy. For the official record, use the district’s own copy.
2013minutes2013-04-17 2013-04-172013-04-17-minutes2013-04-17Motions
Approve the Agreement Regarding Crossing of Wastewater Easement.
Have ECO repair the 18” retaining wall in front of 2503 Grist Lane at a cost not to exceed $950.
Approve 80 hours of security patrols during May.
Pay bills and invoices totaling $193,135.63.
Adopt the proclamation disbanding the Manage the Manager Committee.
Accept the STS proposed resolution to the oversight in collecting the fire protection fee increase.
Approve the Minutes of the Regular meeting of March 20, 2013, with corrections.
Page 1
MINUTES OF MEETING OF THE BOARD OF DIRECTORS OF WILLIAMSON-TRAV!IS COUNTIES MUNICIPAL UTILITY DISTRICT #1 APRIL 17, 2013 STATE OF TEXAS § § COUNTIES OF WILLIAMSON AND TRAVIS § A regular meeting of the Board of Directors of was held at 6:00 p.m. on April 17, 2013, at the District office at , , . The meeting was open to the public and notice was given as required by the Texas Open Meetings Act. The meeting was called to order at 6:04 p.m. and roli was called of the members of the Board, to-wit: Linda Durham - President Luis Zervigon - Vice President Chris Rocco - Secretary Brian T. Hardin - Treasurer Paul Rabago - Assistant Secretary/Treasurer All Directors were present, thus constituting a quorum. Also attending the meeting were Kristi Hester, Hector Alanis, Lisa Adkins, and Becky Stathos with Severn Trent Services (STS); Bill Flickinger with Willatt & Flickinger (WF); Herb Edmonson with Gray Engineering (GEIl); Greg Vinella with ECOSystems (ECO); and District residents Barbi Benjamin, Brad McGinnis, Shawn Gamble, Honggang Zhang, Bob Baumgart, and Terrie Sharpe. Agenda Item 1: Citizens Communications. Mr. Baumgart and Ms. Benjamin expressed several concerns about the expansion of Sunchase Park, particularly the location of the new gazebo and horseshoe pit, as well as the lack of restroom facilities. The Infrastructure Committee will consider their concerns and will also meet with some of the other neighbors. Mr. McGinnis requested that the new street light scheduled for installation at Old Mill Road and Cranberry Cove be relocated to the other side of the mailboxes to prevent it from shining directly into his bedroom window. The Infrastructure Committee will review the issue. STS will send the Infrastructure Committee the e-mail addresses of Ms. Benjamin and Mr. McGinnis. Mr. Gamble and Ms. Zhang addressed the Board regarding a fence issue with one of the neighbors. Director Rocco will visit with the neighbor about the problem. Agenda ltem 2: Report from the District’s Engineer. a. Pond improvements, signage and monuments; submittal and approval of Texas Department of Licensing and Registration; Agreement with Pharis Design. Mr. Edmonson said work should be completed toward the end of July. He will schedule a meeting with Ms. Pharis and the Infrastructure Committee to review possibilities for relocating the Sunchase gazebo. b. Street Lighting Enhancement Program. Mr. Edmonson said completion is expected May 24. April 17, 2013 Page 1
Page 2
c. Approval of Additional Work Required by Gray Engineering Related fo Phase 2 of the Street Lighting Enhancement Program. On a motion by Director Rabago, seconded by Director Rocco, the Board voted unanimously to approve the Letter of Authorization at a cost not to exceed $35,000. (See attached.) d. Sign Easement from Hunters Glenn | HOA. No discussion. e. Tree Trimming at Street Light Locations in District. Mr. Edmonson said it appears trimming can be done throughout the entire district for less than $20,000. He will bring numbers from two contractors to the May meeting. f. City of Cedar Park Wholesale Water Contract. No discussion g. Request by Owner to Cross Sewer Easement to Serve Proposed Swimming Pool at 2401 Vestavia Ridge Lane. Following a report by Mr. Flickinger, Director Zervigon moved to approve the Agreement Regarding Crossing of Wastewater Easement. Director Rabago seconded the motion, which passed unanimously. h. Owner complaint regarding flooding at 2008 Lakeline Oaks Drive. Ms. Sharpe addressed the Board requesting more drain blocks be installed in the wall behind her home to prevent flooding. On a motion by Director Rocco, seconded by Director Durham, the Board directed Gray Engineering to advise the quantity and location of drain blocks needed to address the issue behind the affected properties, at a cost not to exceed $1,000. Agenda Item 3: Report from the District’s landscape contractor on landscape maintenance and suggested landscape improvements. ECO will use the Shenandoah site as a staging area for District plantings if needed. Mr. Vinella said ECO would remove the trash trees inside the detention pond area they maintain in Volente Hills at a cost not to exceed $750. The Parks Committee will review the area in question. On a motion by Director Durham, seconded by Director Zervigon, the Board voted to have ECO repair the 18” retaining wall in front of 2503 Grist Lane at a cost not to exceed $950. Director Hardin was out of the room at the time the vote was taken. Agenda ltem 4: Report from Constable on Security Patrols; Increase/Decrease in Contract Hours. On a motion by Director Rocco, seconded by Director Durham, the Board voted unanimously to approve 80 hours of security patrols during May. A “Meet-The-Constable Night” was scheduled for May 8", immediately preceding the DRC meeting. Information about the meeting will be put on the back of the bill and on the mobile sign. Details regarding the street lighting enhancement and pond beautification programs will also be included with the next bill as a separate flyer. Agenda Item 5: Report from District Manager and Affected Persons, including Payment of Bills and Invoices and Transfer of Funds. a. Review and discussion of pending Board directives to Manager, attorneys, Board members and subcommittees Committee reports Water and wastewater system report Security measures for the water system Review changes made to Standard Operating Procedures (SOP) Manual Detention pond and related issues Preventative maintenance program Billing report; service cutoffs Customer and resident complaints Adjustment of delinquent accounts Builder and aged receivables Collection of delinquent property taxes SRSTTQoMoQA0T Aprii 17, 2013 Page 2
Page 3
. Quarterly investment reports Bilf payment report Financials, transfer of funds Solid waste collection and disposal service — recycling programs District patrols — Agreements for Patrol Services including office building access control and security and deed restriction compliance Manhole cleanout/maintenance Stormwater Management Plan CMU Wall Repairs Rental of Speed Monitoring Trailer LTO3 IS Ms. Adkins reviewed District financials for March. On a motion by Director Rocco seconded by Director Durham the Board voted unanimously to pay bills and invoices totaling $193,135.63. Ms. Hester stated that in May she plans to present an amendment to the current management contract to a) extend the expiration date to coincide with the expiration date of the District's contract with the City of Cedar Park, and b) amend the rate charged for a utility truck. The base fee will remain the same. Director Durham moved to approve three checks payable to STS (November, January, and February) which have been held awaiting further detail. Director Rabago seconded the motion, which passed unanimously. The Infrastructure Committee will discuss the STS charge for silt removal with the District engineer and STS agreed to issue a credit if the engineer thinks the charge is unwarranted. Agenda ltem 6 Report from Parks Subcommittee. The Committee has not met this month. a. Park improvements (Standing ltem). b. All matters related to the District’s parks, fields and office building (Standing item). c. Amendments to Park and Tennis Court Rules. Mr. Alanis has requested the needed information from coaches via e-mail. d. Water Conservation Measures (Standing item). e. Contract with Water Conservation Consultant; Xeriscape and Drought tolerant Plant Demonstration and Installation. Agenda ltem 7: Report from the Deed Restriction Committee. a. District's Rules Governing Violations of Deed Restrictions and the procedures and tasks associated with enforcement of those Rules. (Standing ttem). b. Act on Restrictive Covenant Enforcement including enforcement of deed restrictions against owner of 2009 Dayflower and 3401 Larkspur. The new owners of 2009 Dayflower should have repairs complete by the middle of May. A demand letter went out on 1705 Hatch . c. Dumping of trash and other items onto adjacent properties: Amendments to District Rules in connection with such action. d. Funding for and interaction with homeowners associations within the District to facilitate operation of Architectural Control Committee and other HOA functions (Standing ltem). e. Request for installation of swimming pool at 2401 Vestavia Ridge Lane, including permission fo cross sewer line easement with utilities to serve pool. This was discussed under Agenda ltem 2g. Restrictive Covenant Management Agreement with RealManage Austin, LP. g. Restrictive Covenant Management Agreement. - April 17, 2013 Page 3
Page 4
Agenda ltem 8: Report from the Investment Committee. a. District Investments; Investment Policy and Procedures (Standing item). Adenda ltem 9: Report from the Audit Committee. a. Report from the Manage the Manager Sub-Committee (Sub-Committee of Audit Committee. Director Rocco read a proclamation disbanding the Manager the Manager Committee and moved for its adoption. Director Hardin seconded the motion, and the Board voted unanimously to disband the Committee. (See attached.) Agenda ltem 10: Report from the Bills & Invoices Committee. a. Review of payments on current not to exceed expenditures authorized by Board Agenda ltem 11: Report from the Budget Commiftee. The Committee will meet at STS at 11.00 a.m. on Thursday, April 25%. a. Amended Budget Agenda Item 12: Report from the Customer Care Committee. The Committee will meet at Jim’s at 8:00 a.m. on Friday, April 26TM. a. Customer Confidentiality Request Form. b. Identity Theft Policy Mr. Flickinger said the District will need to adopt an identity theft policy since unpaid accounts are sent to debt collection agencies. Agenda ltem 13: Report from the Information Management Committee. Director Rabago said the Committee recommends changing e-mail and document management to Google Government through Onix Networking Corp. at a cost of up to $3,500 for training and implementation. Training costs would be $2,000 and there would be an annual fee of $1,500. He then made a motion to move forward with the Committee’s recommendation. Director Zervigon seconded the motion which passed unanimously. a. District Website (Standing item). b. Ownership of the WTC MUD No. 1 logo. ¢. Amendment to Contract with SteelTree. Agenda ltem 14: Report from the Infrastructure Committee. a. Submittal and Approval of TDLR in connection with Pond and Park Improvements. b. Approval of Additional Work Required by Gray Engineering Related to Phase 2 of the Street Lighting Enhancement Program. c. Tree Trimming at Locations Where Trees are Immediately Adjacent to Street Lights Blocking Lighting on the Street. d. Consent Agreement, Wholesale Water Agreement, and Wholesale Wastewater Agreement with City of Cedar Park. Sign Easement from Hunters Glenn | HOA. Sidewalk Maintenance. Improvements to Former Standpipe Site. Director Zervigon distributed copies of the concept design which will be shared with Shenandoah area residents at a special meeting on Monday, April 22TM. (See attached.) QTMo Agenda_ltem 15: Report from the Management Committee. There was no discussion under this agenda item. April 17, 2013 Page 4
Page 5
Agenda ltem 16: Payments to Counties for Election Services. Mr. Flickinger said all invoices have been received and payment has been approved by the Bills & Invoices Committee. This item can now be removed from the agenda. Agenda ltem 17: Traffic Hazards in District, Including Old Mill Road between Sabinal Trail and Beechnut Trace; Request to County to Restrict Through Truck Traffic on Petunia. Director Rocco will visit with the Constable about this issue. Agenda Item 18: Drought Contingency Plan; Consideration of Fines and Appeals of Fines for Violations (Standing ltem). Agenda Item 19: Proposal for Strategic Planning Services and Annexation of District by City of Cedar Park (Standing item). Agenda ltem 20: Rate Order (Standing item). Ms. Hester said the fire protection fee increase approved in January, 2012, was not passed along to customers in a timely manner. Although the total sum collected was remitted to the City of Cedar Park as specified by the Rate Order, a larger sum should have been collected. Ms. Hester said STS proposes to rectify the problem by first preparing a spreadsheet detailing the amount still due. That amount would then be included in the next payment to the City and STS would issue a like credit to the District. Director Rocco moved to accept STS proposed resclution to the oversight. Director Durham seconded the motion, which passed unanimously. Agenda Item 21: District’s Service Agreement, Delinquent Notice and Rules and Regulations for Water and Wastewater Service (Standing ltem). Agenda Item 22: Minutes from the March 20, 2013 Regular Meeting and February 13, 2013, March 13, 2013 and March 21, 2013 Special Meetings. On a motion by Director Zervigon seconded by Director Durham the Minutes of the Regular meeting of March 20, 2013, were approved with the following corrections: ¢ Page 2: Agenda item 4 should reflect that Director Rocco made a motion to continue 80 hours of security patrol for the current month. Director Durham seconded the motion, which passed unanimously. » Page 3: The first paragraph should reflect that Director Hardin asked Mr. Alanis to resend the summary to him. The February 13 and March 13 special meetings were the DRC. There was not a quorum at the March 21 special meeting so no minutes were taken. Agenda ltem 23: Reconsideration of Minutes previously approved with oral revisions. There were no minutes up for reconsideration. Agenda ltem 24: Adjournment. The meeting was adjourned at 9:00 p.m. Chris Rocco, Secretary Board of Directors Date: April 17, 2013 Page 5
Page 6
41713 Agenda item 2¢ Page 1of 3 O 512.452.0371: F 512.454.9933 8834 North Capital of Texas Highway, Suite 140 Austin, Texas 78759 : www.grayengineeringinc.com ENGINEERING tere 2045 Aprit 17, 2013 Board of Directors c/o Willatt & Flickinger 2001 M. Lamar Austin, TX 78705 Re: williamson Travis Counties Municipal Utility District No. 1 Street Light Enhancement— Phase 2 GEl No. 915-10654-32 Dear Directors: please let this letter serve as our authorization to proceed with Phase 2 of the Street Light Enhancement program. The District’s electric service provider, Pedernales Electric Cooperative (PEC), will operate and maintain the lamps within each light structure, however the developer, or in this case the District, is responsible for the initial instaliation of the Iarhp, pole structure and electrical wiring. This will be the second phase of the District’s Five Year Program to expand the existing street light system, encompassing the entire District, by adding as many as 108 additional street lights to the system of over 200 lights. Our scope of work under this authorization involves working with the District's Infrastructure Committee to provide for the design and installation of approximately forty one street fights located throughout the District at locations selected by the Board of Directors. The additional lights are intended to supplement the existing lighting and integrate with the electric service system currently serving the District. Gray Engineering, Inc. (GEl}, along with our subconsultants, will analyze the existing site conditions and electric layout at each new area and assess the optimal location for the new light structure. Based on the information collected, the designed extension of the electric system will include considerations of effectiveness, initial cost and energy efficiency. GEl will then prepare the appropriate construction plans and specifications for each location along with design details for the light poles, lamps and footing. Design drawings for each location, complete with wiring requirements, load analysis materials specifications will be prepared and submitted to the Infrastructure Committee as well as the District’s Board of Directors for approval. Under this authorization, GEl will prepare bidding documents and assist the District in soliciting proposals by publically advertising the project in accordance with the requirements of the Texas Commission on Environmental Quality (TCEQ). GEI will conduct the bidding process, prepare the necessary bid tabulations and assist the District in evaluating the bids received as well as provide a written Letter of Recommendation for contract award. Once the District awards the contract, GEI will prepare the necessary contract documents and proceed with contract execution, ~54—
Page 7
417113 Agenda [tem 2¢ Page 2 of3 T g Board of Directors April 17,2013 Page 2 of 2 Once construction has begun, GEl will provide periodic site inspections and coordinate with PEC representatives. GE! will provide construction administration services to the District, which will include the review and processing for submittal of each monthly pay estimate submitted by the Contractor in accordance with the construction contract. The design and construction services described above will be provided in accordance with our existing services agreement on an hourly basis in accordance with the attached rate schedule, with a not to exceed amount of $35,000.00 Charges would be invoiced monthly for the duration of the project. Reimbursable expenses, including document reproduction, publication costs, etc. will be invoiced separately and are not included in the above referenced limit. Additional services not included above, if needed, will be charged on an hourly basis and invoice monthly. Additional services include, but are not imited to: Attendance at Special Meetings of the Board including Public Meetings with District residents Preparation of maps or other documents not included in the canstruction drawings Any on the ground survey work to locate any existing facilities, property fines or easements * Preparation of any easement of right-of-way documents it is anticipated that the field work should be completed within forty-five days of authorization with design following with a time pericd of approximately sixty days. Document preparation, bidding and award of contract should take sixty to ninety days to complete. Should you wish to authorize this work, please indicate by signing in the space provided. Work is expected to begin upon receipt of written suthorization. Please contact me should you have any questions regarding this authotization. Thank you for the opportunity to assist you on this project. Sincerely, GR. ENGINEERING IN onald K. Bayes P. E Vice President Attachment: Rate Schedule cc: Me. Bill Flickinger; Willatt & Flickinger Authorized by Board of Directors Date ~55~
Page 8
41713 Agenda ltem 2¢ Page 3of 3 STANDARD FEE SCHEDULE Personnel: Personnel cost is reimbursed based on a multiplier applied to "Salary Cost". "Salary Cost" for each employee is based on the employee's actual hourly wage plus benefits. The approximate ranges of hourly "Salary Cost" by personnel classification are as follows: Principal $ 100.00 to 125.00 Project Manager 30.00 to 105.00 Design Tech 27.00 to 65.00 Field Representative 35.00 to 65.00 Clerical Support ’ 20.00 to 55.00 The normal multiplier for overhead expenses and fees is 2.4 time "Salary Cost". Expert Representation - Services as an expert witness will be provided at 2 times the hourly rate as set forth above. Travel and Subsistence: Al travel and subsistence expenses are invoiced at actual cost plus 10% handling. Cost of mileage on vehicles is computed at the most current RS rate. Reimbursable Expenses/Purchased Services: All reimbursable expenses and purchased services are invoiced at actual cost plus 10% handling. These include, but are not limited to, costs of reproduction, long distance telephone, facsimile transmissions, subcontract services, rented or leased equipment, and expendable supplies. Reimbursable Expenses are not included in project fees proposed unless specifically stated otherwise. Terms: Invoices are submitted monthly for all services rendered during the previous month are payable "net 30 days". Invoices over 30 days past due will accrue interest at 1.5% per month. Fee Schedule Adjustment: Due to the changing cost of doing business the personnel cost listed above will be adjusted as of the billing period starting May 1st of each year. Effective 2/15/2012 _ 5 6 —_
Page 9
4M7M3 Agenda ltems 2g & 7¢ WILLATT & FLICKINGER Page1 of8 ATTORNEYS AT LAW 2001 NORTH LAMAR * AUSTIN, TEXAS 78705 * (512) 476-6604 © FAX (512) 469-9148 April 16, 2013 BY FIRST CLASS U.S. MAIL AND VIA E-MAIL TO: Mr. Joshua Bibler Mrs. Natalie Bibler 2401 Vestavia Ridge Lane Re: Williamson-Travis Counties MUD No. 1 (the “District”); Request to Cross District Easement in Connection With Construction of Swimming Pool at 2401 Vestavia Ridge Lane, ’ Dear Mr. and Mrs. Bibler: I am writing to you on behalf of Williamson-Travis Counties MUD No. 1 (the “DistrictTM). The District’s Engineer, Don Bayes, has completed his review and I have completed my legal analysis and we have determined that permission to cross the wastewater easement can be granted upon execution of the enclosed Agreement Regarding Crossing of Wastewater Easement and payment of the fees in the amount stated in the Agreement which represent the legal and engineering fees incurred to review and draft the Agreement and record it after it is signed. The amount was calculated under the assumption that no revisions to the enclosed Agreement would be required. Please sign the enclosed Agreement on page 4 before a notary who will need to complete the acknowledgment and apply his or her seal on page 6. Then, please return the executed and notarized original to me along with your check made payable to WTC MUD No. 1 in the amount of $803.00. T will be meeting with the Board of Directors of the District tomorrow evening and will have the enclosed approved and executed af that time. Thank you. e Bill Flickinger BE/hv Enclosure ce: Mr. Don Bayes (Via E-Mail Only) (w/enclosure) AWTCNo. Mers\bibler-4a 41613 -57- EMAIL REDACTED BY RECORDS SITE
Page 10
417113 Agenda ltems 2g & 7¢ Page 2 of 8 AGREEMENT REGARDING CROSSING OF WASTEWATER EASEMENT THE STATE OF TEXAS § ‘ § COUNTY OF TRAVIS - § This Agreement Regarding Crossing of Wastewater Easement (the “Agreement”) is by and between Williamson-Travis Ceunties Municipal Utility District No. 1 (the “District”) and Joshua Bibler and Natalie Bibler (the “Owners”) and is as follows: RECITALS WHEREAS, the Owners own real property in Travis County, Texas described as: Lot 12, Block M, Anderson Mill West Section 19 Resubdivision of Lots 1 and 25 Block H, Lots 1, 19-22 Block I, and Lots 1011 and 26 Block X, a Subdivision in Travis County, Texas; according to the Map or Plat recorded in Document No. 200100346, Official Public Records of Travis County, Texas; and as corrected by instrument recorded in Document No. 2001211762, Official Public Records of Travis County, Texas; also described as street address 2401 Vestavia Ridge Lane, (the “Property”); and WHEREAS, the Owners have requested permission fo cross the District’s Wastewater Easement which is described in that certain Sanitary Sewer Easement recorded as Document No. 2000099190 of the Official Public Records of Travis County, Texas (the “Wastewater EasementTM) to facilitate construction of a pool in the Owners’ backyard with associated decking; and WHEREAS, the District is willing to grant permission to the Owners to cross its Wastewater Easement subject to the terms and conditions set forth herein. AGREEMENT NOW WHEREFORE PREMISES CONSIDERED, IN CONSIDERATION OF THE PAYMENT SET FORTH BELOW AND IN CONSIDERATION OF THE MUTUAL COVENANTS HEREIN, THE OWNERS AND THE DISTRICT AGREE AS FOLLOWS: 1. Owners acknowledge and understand that should the District need to utilize its Wastewater Easement and make repairs or improvements to its wastewater line that the Owners shall be solely responsible for any darmage to the lines, walkways or other facilities or structures installed or constructed across the District’s Wastewater Easement. This is a risk that Owners assume by installing or constructing those lines, facilities or structures over the Wastewater Easement. ~58—
Page 11
417113 Agenda ltems 2g & 7¢ Page 3 of 8 2. Owners shall reimburse the District for the engineering and legal costs related to Owner’s request to cross the District’s Wastewater Easement, its review and the drafting of this Agreement. Such costs shall be paid in full prier to execution of this document by the District, and total $803.00. 3. This Agreement, and the terms and conditions herein contained, shall run with the land and shall inure to the benefit of and be binding upon the heirs, personal representatives, successors and assigns of each of the parties hereto, including all firtare owners of the Property. 4. This Agreement shall be effective on the date signed by the District and expire upon removal of the swimming pool from the Property or abandonment of the swimming pool on the Property. 5. Owners may only install or construct the following facilities across the Wastewater Easement: plumbing and electrical going from pool to equipment, size of pipes - 2 inch schedule 46 PVC, buried 8 inches deep, % inch schedule 40 PVC conduit for electrical, encased in concrete cap as needed as depicted and described on the attached sketch which has been labeled as Exhibit “A” and is hereby incorporated herein for all purposes. Any additional facilities such as lines, pipes and walkways must be approved in writing by the District prior to such installation or construction on the Property. 6. No portion of the swimming pool on the Property or ifs associated decking shall be located over or on any portion of the Wastewater Easement. Owners agree to remove at their sole cost any portion of the pool or decking found by the District’s Engineer to be over or on the ‘Wastewater Easement. 7. Owners shall be liable for any damage caused to District’s wastewater line within the ‘Wastewater Easement resulting from Owners’ construction of their swimming pool and decking on their Property. 8. This Agreement sets forth the entire agreement and understanding between the parties relating to the subject matter hereof and supersedes all previous agreements between the parties, whether written or oral, with respect to the subject matter hereof. 9. This Agreement shall be governed by and construed in accordance with the laws of the State of Texas applicable to contracts made and fo be performed therein. This Agreement shall be performable in Travis County, Texas. 10. Ifany actions or proceedings are brought under this Agreement, the prevailing party shall be entitled to recover all costs and expenses, including reasonable attorney’s fees. 11. No amendment or modification of any provision of this Agreement shall be effective or binding on the parties unless agreed to in writing and signed by both parties. -58—
Page 12
EXECUTED this day of 41713 Agenda ltems 2g & 7¢ Page 4 of 8 ,2013. (“DistrictTM) By: Linda Durham, President Dated: April , 2013 -( -
Page 13
OWNERS: By: 4T3 Agenda Items 2g & 7¢ Page 5 of 8 Joshua Bibler. By: Natalie Bibler -61-
Page 14
AT Agenda items 2g & 7¢ Page 6 of 8 ACKNOWLEDGMENTS THE STATE OF TEXAS § COUNTY OF WILLIAMSON g This instrument was acknowledged before me on the _ °~ day of , 2013 by Linda Durham as President of , personally known fo me or on the basis of legally sufficient identification for the purposes of consideration stated herein. Notary Public, State of Texas [SEAL] Printed Name My commission expires: 54 —B 2
Page 15
417113 Agenda ltems 2y & 7¢ Page 7 of 8 THE STATE OF TEXAS § COUNTY OF TRAVIS g This instrument was acknowledged before me on the _ day of , 2013 by Joshua Bibler and Natalie Bibler, personally known to me or on the basis of legally sufficient identification for the purposes of consideration stated herein. Notary Public, State of Texas [SEAL] Printed Name My commission expires: ATTACHMENT: Exhibit “A” - Sketch Depicting Proposed Pool and Facilities (1 Sheet) AFTER RECORDING RETURN TO: Willagt & Flickinger Attorneys at Law 2001 North Lamar Blvd. Austin, Texas 78705 2\WTCNO. lagr-crossingwieasement 4/16/13 -63—
Page 16
417113 Agenda Item 9a Page 1 of 1 Resolution Insomuch as STS has addressed the most recent directives of the Manage the Manager Committee (the “Committee”) and that their responses have been satisfactory, the Committee wishes to disband but not until it makes the following proclamation: Most if not all of the Committee’s concerns and subsequent directives were sound and of significant substance. During the course of the analysis of the Committee’s directives, STS did identify and documented opportunities to improve controls, analysis and communication about how it goes about addressing the Committee’s as well as the rest of the Board’s directives. In the absence of the Manage the Manager Committee, all Board committees will be responsible for managing not only STS but the other contractors responsible for Board directives, both past and future. The Management Committee is responsible for processing any changes in the contract between Severn Trent Services and Williamson-Travis Counties MUD #1.