Director Zervigon moved to authorize Gray Engineering to begin work on Phase 2 of the program at a cost not to exceed $28,000 and to provide a more comprehensive estimate at the April meeting.

Director Zervigon moved to authorize Gray Engineering to prepare bid documents dividing the District into two tree-trimming zones at a cost not to exceed $3,500.

The Board approved the assignment of the contract with the District's Engineer, requested due to a name change.

The Board authorized 80 hours of patrol for April.

The Board voted unanimously to pay bills and invoices totaling $203,978.73.

The Board authorized STS to check the park pavilions following the March 30 parties and perform any necessary clean-up at a cost not to exceed $250.

The Board approved the resolution reflecting the change of address for Gray Engineering.

The Minutes of the February 20, 2013 Regular Meeting and the February 27, 2013 Special Meeting were approved.

Page 1

MINUTES OF MEETING OF THE BOARD OF DIRECTORS
OF   #1
March 20, 2013
STATE OF TEXAS §
§
COUNTIES OF WILLIAMSON AND TRAVIS §
A regular meeting of the Board of Directors of   was held at 6:00 p.m. on March 20, 2013, at the District office at  ,  ,  . The meeting was open to the public and notice was given
as required by the Texas Open Meetings Act.
The meeting was called to order at 6:04 p.m. and roll was called of the members of the Board, to-wit:
Linda Durham - President
Luis Zervigon - Vice President
Chris Rocco - Secretary
Brian T. Hardin - Treasurer
Paul Rabago - Assistant Secretary/Treasurer
All Directors were present with the exception of Director Rabago, thus constituting a quorum. Also
attending the meeting were Hector Alanis, Lisa Adkins, and Becky Stathos with Severn Trent
Services; Bill Flickinger with Willatt & Flickinger; Don Bayes with Gray Engineering; Greg Vinella with
Eco Landscaping; and District resident Katrina Barton.
Agenda ltem 1: Citizens Communications. Ms. Barton addressed the Board about changing some of
the lighting at the entrance to Volente Hills. This is an HOA issue and does not need MUD board
approval.
Director Rabago arrived at this time.
Agenda ltem 2: Report from the District's Engineer.
a. Pond improvements, signage and monuments; submittal and approval of Texas Department of
Licensing and Registration; Agreement with Pharis Design. The preconstruction meeting will
be held tomorrow.
b. Street Lighting Enhancement Program. The contract has been awarded and the
preconstruction meeting will be held tomorrow.
c. Approval of Additional Work Required by Gray Engineering Related fo Phase 2 of the Street
Lighting Enhancement Program. Director Zervigon moved to authorize Gray Engineering to
begin work on Phase 2 of the program at a cost not to exceed $28,000 and to provide a more
comprehensive estimate of the engineering services at the April meeting. Director Durham
seconded the motion, which passed unanimously.
Sign Easement from Hunters Glenn | HOA. Mr. Alanis will check with PCMI on this issue.
e. Tree Trimming at Street Light Locations in District. Director Zervigon moved to authorize Gray
Engineering to prepare bid documents dividing the District into two tree-trimming zones at a
cost not to exceed $3,500. These zones will be utilized for the trimming scheduled to begin
after June 30" (based on the recommendation of an arborist), as well as maintenance
trimming scheduled in the future. Director Durham seconded the motion, which passed
=%
March 20, 2013 Page 1

Page 2

T
unanimously. Mr. Vinella distributed pruning guidelines (see attached) which will be put on the
website.
City of Cedar Park Wholesale Water Contract.
Request by Owner to Cross Sewer Easement to Serve Proposed Swimming Pool at 2401
Vestavia Ridge Lane. The resident told Mr. Bayes the pool has been approved by the ACC.
Mr. Flickinger will draft a letter to the resident requesting more information before the Board
can consider his request.
Assignment of Contract with District's Engineer. On a motion by Director Durham, seconded
by Director Rocco, the Board unanimously approved the assignment which was requested due
to a name change. (See attached)
Director Zervigon then briefly reviewed other items contained in the Infrastructure Committee report.
(See attached)
Agenda ltem 3: Report from the District's landscape contractor on landscape maintenance and
suggested landscape improvements. Mulching will begin after the live oaks have finished molting.
Agenda ltem 4: Report from Constable on Security Pafrols; Increase/Decrease in Contract Hours.
On a motion by Direction Rocco, seconded by Director Durham, the Board unanimously authorized 80
hours of patrol for April.
Agenda ltem 5: Report from District Manager and Affected Persons, including Payment of Bills and
Invoices and Transfer of Funds.
a.
QTOSITRITNTQ@NOQAOD
oo
Review and discussion of pending Board directives to Manager, attorneys, Board members
and subcommittees
Committee reports
Water and wastewater system report
Security measures for the water system
Review changes made to Standard Operating Procedures (SOP) Manual
Detention pond and related issues
Preventative maintenance program
Billing report; service cutoffs
Customer and resident complaints
Adjustment of delinquent accounts
Builder and aged receivables
Collection of delinquent property taxes
. Quarterly investment reports
Bill payment report
Financials, transfer of funds
Solid waste collection and disposal service — recycling programs
District patrols — Agreements for Patrol Services including office building access control and
security and deed restriction compliance
Manhole cleanout/maintenance
Stormwater Management Plan
CMU Wall Repairs
Rental of Speed Monitoring Trailer
Ms. Adkins reviewed District financials for February.
On a motion by Director Durham seconded by Director Zervigon, the Board voted unanimously to pay
bills and invoices totaling $203,978.73.
March 20, 2013 Page 2

Page 3

Mr. Alanis was asked to provide the Bills & Invoices Committee with a summary answering all
outstanding issues related to STS invoicing. Director Hardin requested Mr. Alanis to resend the
summary to him.
STS was given the following directives:
= Take action within 30 days whenever District property has been damaged (ongoing);
= Send out list of directives far enough in advance of meetings to allow sufficient time for
updating (ongoing};
= Put atrash can at the entrance to tennis courts;
= Furnish list of top 10 water users as required by Item 14 of Exhibit C to contract regarding
abnormal usage (ongoing);
= Create SOP with the due date for the packet and what should be included in the packet
= Put a copy of the contract on Drop Box;
= Add two columns to STS directives, one reflecting if the directive is in the scope of the contract
and one showing the name of the subcontractor, if any.
Director Durham stated that timesheets from after-hour inspectors no longer require DRC approval if
they are signed and have the SOP at the bottom of the form.
Mr. Alanis stated there are three parties scheduled at park pavilions the Saturday before Easter, and
asked if the Board would like STS to provide weekend park clean-up. On a motion by Director
Rabago, seconded by Director Durham, the Board unanimously authorized STS to check the park
pavilions following the March 30" parties and perform any necessary clean-up at a cost not to exceed
$250. STS should document any work required.
Director Durham will change the verbiage related to winter wastewater averaging on the website and
provide a copy to Director Zervigon.
Mr. Alanis reviewed District operations for February.
Agenda item 6 Report from Parks Subcommittee. The March report was sent out prior to the
meeting. (See attached)
a. Park improvements (Standing item).
b. All matters related to the District’s parks, fields and office building (Standing item).
c. Amendments to Park and Tennis Court Rules. Mr. Flickinger distributed a draft of
amendments to park and tennis court rules. (See attached) Mr. Alanis will forward the Parks
Committee a draft of the e-mail in which he requested the required information.
d. Water Conservation Measures (Standing ltem).
e. Contract with Water Conservation Consulftant; Xeriscape and Drought tolerant plant
demonstration and installation.
Agenda ltem 7: Report from the Deed Restriction Committee.
a. District's Rules Governing Violations of Deed Restrictions and the procedures and tasks
associated with enforcement of those Rules. (Standing ltem).
b. Appointment of Member to DRC to replace Linda Durham whose term expires March 20,
2013.
c. Act on Restrictive Covenant Enforcement including enforcement of deed restrictions against
owner of 2009 Dayflower and 3401 Larkspur.
d. Dumping of trash and other items onto adjacent properties: Amendments tfo District Rules in
connection with such action.
e. Personnel Matters. This item should be removed from agenda
March 20, 2013 Page 3

Page 4

f. Funding for and interaction with homeowners associations within the District to facilitate
operation of Architectural Control Committee and other HOA functions (Standing ltem).
g. Request for installation of swimming pool at 2401 Vestavia Ridge Lane, including permission
to cross sewer line easement with utilities to serve pool. This item was covered under Agenda
ltem 2g.
h. Restrictive Covenant Management Agreement with RealManage Austin, LP.
i. Restrictive Covenant Management Agreement; Requests for Proposals.
Agenda ltem 8: Report from the Investment Committee.
a. District Investments; Investment Policy and Procedures (Standing ltem).
Agenda ltem 9: Report from the Audit Committee.
a. Report from the Manage the Manager Sub-Committee (Sub-Committee of Audit Committee.
Agenda ltem 10: Report from the Bills & Invoices Committee. Mr. Alanis will research to determine if
work orders can be coded so the system will automatically know if they are billable or not and if they
are planned maintenance or not, as they relate to Exhibit C of the contract.
The BBQ grills in the parks need to be cleaned and there is a hole in front of the bathrooms in
Anderson Mill West Park.
Agenda Item 11: Report from the Budget Committee. The committee will meet with STS in April to
discuss amendments to the operating budget.
Agenda ltem 12: Report from the Customer Care Committee. (See attached)
a. Customer Confidentiality Request Form.
Agenda ltem 13: Report from the Information Management Committee.
District Website (Standing Item).
Ownership of the WTC MUD No. 1 logo.
Amendment fo Contract with SteelTree.
S.B. No. 1297 — Written Electronic Communications Accessible to the Public. Mr. Flickinger
distributed copy of SB 1297. (See attached)
QLOTY
Agenda Item 14: Report from the Infrastructure Committee. See discussion under Agenda ltem 2.
STS has ordered signs regarding oak wilt.
a. Submittal and Approval of TDLR in connection with Pond and Park Improvements.
b. Approval of Additional Work Required by Gray Engineering Related to Phase 2 of the Street
Lighting Enhancement Program.
c. Tree Trimming at Locations Where Trees are immediately Adjacent to Street Lights Blocking
Lighting on the Street.
d. Consent Agreement, Wholesale Water Agreement, and Wholesale Wastewater Agreement
with City of Cedar Park.
e. Sign Easement from Hunters Glenn I HOA.
f. Sidewalk Maintenance.
g. Improvements to Former Standpipe Site.
Agenda item 15: Report from the Management Committee.
Agenda Item 168: Payments to Counties for Election Services.
March 20, 2013 Page 4

Page 5

Agenda ltem 17: Resolution designating regular offices and meeting times and places of Williamson-
Travis Counties MUD No. 1. Following a motion by Director Rabago, seconded by Director Durham,
the Board unanimously approved the resolution reflecting the change of address for Gray
Engineering. (See attached)
Agenda ltem 18: Traffic Hazards in District, including Old Mill Road between Sabinal Trail and
Beechnut Trace; Request to County to Restrict Through Truck Traffic on Petunia.
Agenda ltem 19: Drought Contingency Plan; Consideration of Fines and Appeals of Fines for
Violations (Standing Item).
Agenda Item 20: Proposal for Strategic Planning Services and Annexation of District by City of Cedar
Park (Standing Item).
Agenda ltem 21: Rate Order (Standing ltem).
Agenda ltem 22: District’s Service Agreement, Delinquent Notice and Rules and Regulations for
Water and Wastewater Service (Standing ltem). .
Agenda ltem 23: Minutes from the February 20, 2013 Regular Meeting and February 13, 2013 and
February 27, 2013 Special Meetings. On a motion by Director Zervigon, seconded by Director
Durham, the Minutes of the February 20, 2013 Regular Meeting and the February 27, 2013 Special
Meeting were unanimously approved.
Agenda ltem 24: Reconsideration of Minutes previously approved with oral revisions. There were no
additional revisions to the January 16, 2013 minutes.
Agenda ltem 25: Adjournment. The meeting was adjourned at 9:32 p.m.
Chris Rocco, Secretary
Board of Directors
Date:
March 20, 2013 Page 5