WTC MUD #1 RecordsBoard minutes, agendas and votes

Instructions and application for approval to modify home or property (architectural review, blank form)

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

INSTRUCTIONS FOR APPLICATION FOR HOME
IMPROVEMENTS/MODIFICATIONS
Please keep instructions for future applications.
Failure to submit all required information will result in the application being
returned denied until all information can be provided. Most Architectural
Committees are allowed 30 day to respond to an application.
PARNE
&
sy
11.
12.
13.
IF YOU ARE APPLYING FOR:
Patio Cover, Arbor, Gazebo, Sterage Shed, Room Addition, ete you must
submit an elevation drawing showing how the structure will look. Indicate size,
height, width, color, materials and roofing and show placement on the lot survey.
Play Structure, Swing Set, Trampoline, Basketball Goal, ete. you must submit
a photo, brochure or drawing. Indicate size, height, color, materials, etc. and show
location on lot survey.
Pool/Spa (In-ground/Above ground) you must submit detailed drawing of pool
showing the exact location and show access to rear of property.
Exterior Painting or Siding, submit a sample of color.
New Roof, submit manufactures name, color name (brochure or small sample).
New Front Doors, Storm Doors provide photo or brochure.
Solar Screen/Window Tinting please provide a material sample.
Wrought Iron Gates or Burglar Bars submit drawing, color and indicate on lot
survey placement.
Decks, Patios, indicate size, height/width/length, location on lot survey,
. Concrete work/Pavers (sidewalks, driveway extension, etc) indicate location on
lot survey.
Landscaping or Tree Removal/Replacement, submit all details (size of tree
etc.) showing placement on lot survey.
Fencing, submit height, materials and location on lot survey.
Yard Decorations, (birdbaths, benches, statues, signs, lighting, etc.) submit photo
or brochure, and indicate location on lot survey.
Please keep in mind, the more information you send in with your request, the
less likely it will be sent back to you for more details, therefore delaying the
process.

Page 2

APPLICATION FOR APPROVAL TO MODIFY HOME OR PROPERTY
ARCHITECTURAL REVIEW COMMITTEE
Planned Community Management, Inc.
A Division of Severn Trent Services
14050 Summit Drive, Suite 113
Austin, TX 78728
Phone (512) 246-0498
Fax (512) 716-0024
COMMUNITY:
OWNERS NAME:
HOME PHONE:
ADDRESS:
WORK PHONE:
CITY:
ZIP:
CELL PHONE:
ALTERNATE MAILING ADDRESS:
In an effort to protect the homeowner's rights and property values, it is required that any homeowner considering change or
addition to their home OR property which would effect the exterior appearance MUST submit their request in writing to the
Architectural Review Committee PRIOR to initiating any change or addition. If any change is made that has not been approved,
the committee has the right to ask the homeowner to remove the improvement from the property.
PLEASE STATE PROPOSED
CHANGE OR ADDITION(S).
A LOT SURVEY OF THE PROPERTY INDICATING THE LOCATION OF THE PROPOSED ADDITION, MODIFICATION OR
STRUCTURE MUST BE ENCLOSED, ALONG WITH SPECIFIC DETAILS OF MATERIALS, COLOR, AND DIMENSIONS,
INCLUDING HEIGHT.
YOUR LOT SURVEY SHOULD HAVE BEEN PROVIDED AT YOUR CLOSING. IF A LOT SURVEY CANNOT BE PROVIDED,
PLEASE SUBMIT A DETAILED DRAWING OF THE PROPERTY SHOWING THE LOCATION OF THE HOME AND
EASEMENTS. THE PLACEMENT OF THE IMPROVEMENT MUST BE SHOWN INDICATING THE DISTANCE FROM SIDE
AND/OR REAR FENCING.
IF THE PROPOSED IMPROVEMENT HAS A ROOF, PLEASE SUBMIT AN ELEVATION DRAWING SHOWING HOW THE
STRUCTURE WILL LOOK FROM A SIDE AND REAR VIEW.
NO LOT SURVEY IS REQUIRED FOR PAINTING, STAIN, SIDING OR ROOF REPLACEMENT.
COLOR SAMPLES ARE REQUIRED FOR PAINT, SOLAR SCREENS, ROOFING MATERIAL, BRICK OR SIDING.
MATERIALS TO BE USED:
DIMENSIONS:
HEIGHT
WIDTH
LENGTH
FAILURE TO SUBMIT THE SURVEY AND ALL REQUIRED INFORMATION MAY RESULT IN A DELAY AND/OR
AUTOMATIC DISAPPROVAL OF THE APPLICATION.
! understand that the Committee will act on this request as quickly as possible and contact me in writing regarding their
decision, however, the Commitiee is allowed from 30 to 45 days to respond.
| also understand that in the event
construction is not started within six (6) month from the date of approval, then a new application must be submitted.
Further, | understand that it is my responsibility to ensure compliance with all applicable governmental ordinances, codes,
permits, etc. affecting such improvement(s). | understand that | am not to begin any improvements until the Committee
notifies me of their decision.
HOMEOWNER’S SIGNATURE
CONSTRUCTION START/COMPLETION DATE
DATE:
C:\Documents and Settings\bstathos\Local Settings\Temporary Internet Files\OLKE6\AMR REVISED APPLICATION 2006
|
(2).doc