Urgent notice to WTCMUD #1 residents re proposed swimming pool, community input process (letter)

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

Williamson-Travis Counties MUD #1
14050 Summit Drive, #113
Austin, TX 78728
URGENT NOTICE TO WTCMUD #1 RESIDENTS
RE: PROPOSED SWIMMING POOL – COMMUNITY INPUT PROCESS
The Board of Directors of the WTCMUD #1 respectfully requests you to submit your opinion regarding a
proposed Project for the construction and operation of a swimming pool within the District. This
Community Input Process has been established to assure that the wishes of the community are respected by
providing the Board your opinion on whether or not to proceed with the proposed Project.
Your June utility bill will include a form that will allow you to indicate if you are IN FAVOR OF or
OPPOSED TO the construction and operation of a proposed swimming pool within the District. This
opinion process will continue through at least two billing cycles. The results will be tabulated and made
public prior to a vote by the Board of Directors. The vote by the Board is expected to take place in August or
September. The exact vote date will be publicized in advance.
Before submitting your opinion we urge you to educate yourself with the wealth of detailed information that
the Board has developed to assist residents in understanding all aspects of the proposed Swimming Pool
Project. The information available includes studies of the possible designs, operation, site location and the
cost impact on your personal property taxes. All of the information is included on the MUD web site at
www.wtcmud1.org . Alternatively, you can receive printed copies by calling Severn Trent at 512-246-0498.
Your questions are welcome via email to: wtcmud1.yahoo.com or by phone to: 512-246-0498.
Following are questions posed by the Board and the resultant reports which contain the responses.
1. What design of pool would be appropriate, how many people are likely to use it, where can it be located and
how much will it cost to construct and operate? Please view the District Engineer’s Preliminary Feasibility
Study (“Engineers Study”) to view the information provided for these questions.
2. What would be the impact on property taxes to construct and operate a swimming pool facility? The District
Accountant along with the Board’s Budget Committee created the “Pool Cost Projection” document to
address this question. The report shows anticipated impacts for varying appraised home values. Please consult
this document to estimate how this would affect your personal tax situation.
3. Would the residents of the District be willing to pay the required additional property taxes and how should
the Board determine whether such willingness exists? The Board contracted with a consultant to create a
Community Outreach Program. Their information is contained in the “Initial Public Forum” and
“Supplement to the Initial Public Forum”. Since only a very small portion of the community was able to
participate, the Board is not highly confident that the information is representative of the opinions of all of the
community. Therefore, the Board decided to undertake this Community Input Process.
The Board’s attorney has advised that State Law prohibits the use of Municipal Bond financing for the
construction of projects, such as the proposed pool, and there is no other mechanism available for financing
the construction over time. The construction funding must come from the Operating and Maintenance funds
secured through property taxes or grants (there is no assurance that grants can be secured). While it is
possible to collect the funds required for construction over multiple years all the funds would have to be on
hand to construct the facility. Though much less than the construction costs, operating costs not covered by
pool revenues, would also have to be secured annually through property taxes.
HISTORY: On June 24, 2008 a group of District residents presented the Board with a petition requesting
the MUD conduct a Feasibility study of the construction and operation of a Swimming Pool facility in the
District and to inform the community of the results of the study through an Outreach Program. The petition
was signed by 430 residents from all five neighborhoods of the District. The Board feels obliged to conduct
a thorough and carefully structured response. The result is the reports and data posted on the web site and
the Community Input Process announced by this letter.