WTC MUD #1 RecordsBoard minutes, agendas and votes

Final Report, Public Input Forum, November 8 & 17, 2008 (swimming pool; GMSA Management Services)

Unofficial searchable copy. For the official record, use the district’s own copy.

Page 1

Final Report Public Input Forum
November.8 & 17,2008
10000 Old Mill Road
| Report Contents
Cedar Park TX 78668
Executive Summary
Section One: Forum Materials
Public Input Forum Addenda
Mailer for Participation
Power Point Presentation
Input Methods
Sign-In Sheets
Section Two: Survey Information
Online Survey
Online Survey Results
Affinity Diagram
Section Three: Photos
Section Four: Stakeholder Notes
GMSA Management Services Inc..t'11023 Pencewood Court, Suite A. tAustin.TX:7:.78750.
$12.250.5164:+Ph 512.250.5439 Faxt gedwards@emasmanagemetii.conyt llasdon@austin.rr.com :

Page 2

Executive Summary
Introduction
The Williamson-Travis County MUD #1(WTCMUD#1) Board welcomed the invited
guests and citizens to a Public Involvement Forum. The purpose of the forum was to gain input
from the community as it related to developing a community swimming pool facility. The board
considered this issue because significant interest from the community exists in providing a
neighborhood swimming poo! facility.
The Public Involvement forum involves a proven input process that requires bringing together as
many of the affected stakeholders as possible and engaging them throughout the planning
process in meaningful dialogue. Accordingly, this process includes all citizens in the identified
service area.
The consultant conferred with the Board of Directors at four formal meetings and one
special called meeting, over a three-month period, as well as other public sessions. These
meetings helped to shape, direct and validate the dialogue expressed during two stakeholder
forums.
The consultant provided an overview of the project, starting with the proposed location as
identified by the engineering firm of Gray, Jansing & Associates, Inc. in a study authorized by
the Board of Directors. The consultant explained that the forum was to present the swimming
pool preliminary feasibility study including basic drawings and recommendations and to discuss
the Pro/Con issues of building a community swimming pool facility within the District. At each
forum there were sign-in sheets asking for residents’ names and addresses to validate their
residency in the District. Seventy people participated in the forum, with eight (8) people
attending two meetings.
In the forum, participants were presented with a list of identified elements that pertained
to the constraints, resources and financial considerations to meet the objectives.
Maps were
provided from the engineering study, which identified the location of the feasible sites of land
within the study area that are owned by the WTCMUD#1.
GMSA Management Services Inc. t 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 fPh 512.250.5439 Faxt gedwards@gmasmanagement.com f liasdon@austin.rr.com

Page 3

Various methods were used to inform the public of the Public Involvement Forums and
promote public involvement throughout the two forums. Besides community participants, the
communications were provided to the board, contractors, and companies that operate within the
community. A variety of techniques were used to contact the public, gather information and
provide ways for input into the process. These communication methods included:
=
Internet website
"
Public Notices
=
Direct mailings
»
Email
*
Public Input forums
.
Personal contact through telephone
«
Survey Tools
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 Ph 512.250.5439 Fax} gedwards(@gmasmanagement.com f !lasdon@austin.rr.com

Page 4

Il
What is a Public Input Forum?
A facilitated Public Input Forum is designed to provide an open forum for each
stakeholder to have a say on the topic without concern of interruption, argument, or
confrontation from participants with opposing opinions. It is an input forum addressing issues
that are related to the topic and provide for participants to have open comments at some point in
the forum. A Public Input Forum involves a variety of forums for communication including:
small meetings with community groups, citizens and stakeholders and open forums.
I.
Public involvement consists of four related, and often overlapping, processes:
> Information dissemination
> Consultation
> Stakeholder participation
> Issue identification
Information dissemination refers to the availability and distribution of timely and relevant
information. Aspects of dissemination include appropriate notification and disclosure of project
information and proper public access to it.
Consultation pertains to information exchanges among the government, the Implementing
Agency, project executing agencies, and other stakeholders. Although decision-making authority
rests with the board, the consultant, periodic consultations throughout the project cycle help the
board make informed choices about project activities. Consultation further provides
opportunities for communities and local groups to contribute to project design, implementation,
and evaluation.
Stakeholder participation is where stakeholders collaboratively engage, as appropriate, in the
identification of project concepts and objectives, selection of sites, design and implementation of
activities, and monitoring and evaluation of projects.
Stakeholders are the individuals, groups, or institutions that have an interest or stake in
the outcome of a project. The term also applies to those potentially affected by a project.
Stakeholders include recipient country governments, implementing agencies, project executing
agencies, groups contracted to conduct project activities at various stages of the project.
Developing strategies for incorporating stakeholder participation throughout the project cycle is
particularly necessary in projects, which impact the incomes and livelihoods of the stakeholders.
GMSA Management Services Inc. ¢ 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 tPh 512.250.5439 Faxt gedwards(@gmasmanagement.com tT llasdon(@austin.rr.com

Page 5

ll
Issue Identification is the last step of the Public Involvement forum it develops the combined
concems, broad vision and goals statement from the community. In an operation where true
public input takes place, it comes from what the stakeholders see as the issue(s) at hand. This is
accomplished by incorporating public comments, studies, Board objectives and known factors
gathered through a question and answer process.
Objectives for Public Input Forum
¢
Conduct Public Involvement activities in a transparent and open manner.
e
Document Public Involvement information by issues identified prior to the session as it
pertains to social, environmental, and financial issues.
e
Design the Public involvement activities so that they improve project involvement by
sharing accountability issues and define project outcomes.
e
Assist in activities that strengthen ownership of stakeholders through the Public
involvement activities that allow them to have real meaning in the project.
e
Provide flexible input methods that are reflective of the community and project.
e
Develop differences in requirements for public input that are based on local needs,
conditions and known issues.
e
To provide effective, public input activities that are broad and sustainable.
GMSA Management Services Inc. ¢ 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 #Ph 512.250.5439 Faxt gedwards@gmasmanagement.com llasdon@austin.cr.com

Page 6

Visual Information placed in the meeting space for participants.
The following information was placed on the wall and on tables for participant to use to facilitate
the forum.
1. Mission for the WICMUD#1
Goals and Objectives
.
Communication needs
.
Facilitation times
2
3
4. Ground Rules during brain storming sessions
5
6.
Site Plan Layout Options
7 .
Available Reports
a.
August 2008 - Engineering Report Gray Jansing & Associates, Inc.
b. WICMUD#1 Tax information
c.
Swimming Pool — Executive Summary
8. Facilitated Forum Addenda
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. fAustin TX + 78750
512.250.5164 Ph 512.250.5439 Fax} gedwards@gmasmanagement.com * Jlasdon@austin.rr.com

Page 7

Participant Input Categories
At each meeting participants were ask to comment on ten (10) issues with three (3) of the issues
having several subsets. The last issue was for comments where they were ask to make any
comments or add additional information that they wanted to share.
The topics, which were also repeated on the survey, were as follows:
=
Location
=
Amenities
=
Size of Pool
e
Based on engineering Study
=
Usage of Pool
=
Hours of Operations
"
Months of Operations
=
Revenue Opportunities
=
Fees for all entries
e
Special Events
e
Access
=
Financial Options
Maintenance
Management Options
Design and Development
Property Cost
Return on Investment/Expense
Funding information
o
Grants Writing/Management/Experience
©
Bond Package Discussion
=
Open forum for Additional Comments
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 *Ph 512.250.5439 Fax? gedwards@gmasmanagement.com F Iasdon@austin.rr.com

Page 8

Affinity Diagram
The Affinity Diagram is a business tool. It is one of the seven Management and Planning
Tools used to organize large amounts of ideas and data into a readable format. The tool is
commonly used with project management because it allows large numbers of ideas to be sorted
into groups for review and analysis. The Affinity Diagram was devised by Jiro Kawakita in the
1960s and is sometimes referred to as the KJ Method.
The Affinity Diagram was chosen for this public input forum because of the style in
which the data was received as long comments mixed with brief answers to topics. The groups
that were not listed topics surfaced from the stakeholders and were given headers that pertained
to the conversation.
Power Point Presentation
The purpose of this presentation is to provide information for discussion with an audience
of varied opinions. This allows the group to engage by listening to others. The same
information was also provided on the wall so that those who were less apt to speak out had an
avenue to share their opinion. The images are simple as to not overwhelm the audience with a
demonstration of all the software bells and whistles and lose the content of the discussion. Our
goals were to present a Power Point presentation with purpose, simplicity, and consistency so
that it would have focus and keeping the forum on track.
As topics emerged that were not in the discussion they were added to a sheet marked
“Additional comments.” These comments were included on the Affinity Diagram under the
header that they related to in the discussion.
The information that was gathered was verbal and the stakeholders interjected at will.
The forum is not designed for the participants to talk with each other and have discussion that
could cause confrontations.
Mailer for Participants
The announcement was sent by mailers to each resident’s home. The document was
enclosed in the utility bills. Due to the amount of time it was able to be sent twice. They were
used to announce the forum, dates, times, contact information and website. The WTCMI1 website
was the main source for information.
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 TPh 512.250.5439 Fax} gedwards@gmasmanagement.com f llasdon(@austin.rr.com

Page 9

Inputs Methods Notification - Website
The input methods were explained on the website and participants we ask to contact us
by mail, email and telephone. Telephone was added because all stakeholders do not have or
wish to use email.
Public Input Forum
The Board scheduled two (2) Public Input Forums to provide WTCM1 residents with an
opportunity to express their opinions on the swimming pool facility. Citizen input is a very
important part of the community planning process because it allows you to analyze and evaluate
many factors associated with a swimming pool facility from a number of outside sources. These
Public Input Forums were designed to invite citizen opinions without barriers to their concerns.
The next step is for the consultants to compile the input received from the public during these
sessions, along with public input from other sources, and deliver this information with a
summation to the Board.
The goal is to get all concerns and considerations on the table so that a vote does not have
to be called. As input is provided from residents it helps shape discussion by providing
information on what the stakeholders are interested in discussing and what their future needs for
services are in their community. This may or may not be what the original discussion was about.
Sign-In Sheets
Sign sheets were left out for the meeting. At each forum there were sign-in sheets asking
for resident’s names and addresses to validate their residency in the District. Seventy people
participated in the forarmmwith eight (8) people attending two meetings.
Williamson-Travis Counties Mud1 Survey
Online polling is a fast, easy, and fun way for organizations to gauge the thoughts, needs,
and preferences of their stakeholders. Polls are a great first step to help small groups better
understand and strengthen relationships with their customers. An online poll can also help make
websites and conversations more interactive and engaging because they provide anonymous
responses for those who need that method of input.
This added feature to this process enabled immediate response from the stakeholders,
members and online visitors. This survey used multiple questions as an online poll. Users of the
online polling were provided:
GMSA Management Services Inc. f 11023 Pencewood Court, Suite A. fAustin TX + 78750
512.250.5164 *Ph 512.25095439 Faxt gedwards@gmasmanagement.com tf flasdon@austin.tr.com

Page 10

e
An interactive opportunity to provide input on the website at their leisure.
¢
Display poll results immediately after website input to increase engagement;
¢
To gain greater insight into the opinions of their online audience.
Williamson-Travis Counties Mud1 Survey Results
The number of persons taking the survey was not an adequate representation of the
stakeholders. One attribute of the survey was that it only allowed one survey per household.
One fact that comes through is that the average age of the participants is between 40-49 years of
age and have has three (3) people in their family. This is an issue with online survey in that
younger people seem to take them and older people prefer to use alternative means like posted
mail or telephone. The older age group that took the survey was very interested in getting
additional information and having an opportunity to opt out of the process based on comments.
Each of the fifteen (15) questions was answered and the results were tabulated by number of
persons and ratios to provide an overall view of opinions.
Implementation Considerations
The following questions provide inquisitive strategies and techniques to consider in the decision-
making and final analysis of the input. It is feasible to ask additional questions in an effort to
gather additional information, or one can assume that those interested have, in fact, responded —
one does not need to have a very large sample for this type of decision to be made. If further
input is deemed appropriate the following questions might be used in consideration of gathering
that information.
1. Are many people participating with good ideas?
2. Are key groups participating?
3. Is the board getting enough information as a basis for meaningful input?
4. Are decision-makers getting adequate public information when it is needed?
5. Ifa consensus is needed for decision-making, consensus-building techniques like negotiation
and mediation?
6. Who is missing from the participation process? Will missing participants provide input?
7. Do participants think discussion is helpful and complete?
8. Do they think the Board will be responsive to input?
GMSA Management Services Inc.
+
11023 Pencewood Court, Suite A. tAustin TX ¢ 78750
512.250.5164 +Ph 512.250.5439 Faxt gedwards@gmasmanagement.com * llasdon@austin.rr.com

Page 11

Conclusion
Although the surveys were complete, the sampling was not a good ratio of the community.
However, the online survey was provided simply as another tool and was not the only method
used to gather input. The forums, nature of the conversations, provided more varied input into
the process. Although this process is designed to draw enough conclusions to start a decision
process and a vote is not needed, you may want to consider the above questions in your
discussions. One very important outcome of the survey confirmed that the best way to contact
residents is through the utility bill. This may be an opportunity to contact residents in the future
for other issues.
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. +Austin TX t 78750
512.250.5164 +Ph 512.250.5439 Faxt gedwards@gmasmanagement.com f llasdon@austin..com

Page 12

SECTION
ONE
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. Austin TX + 78750
512.250.5164 {Ph 512.250.5439 Faxt gedwards@gmasmanagement.com f Hasdon@austin.rr.com

Page 13

Forum Addenda
e
Welcome
e
Introduction of Consultants
e
Acknowledge people for being there
e
State purpose of meeting
e
Intended results/outcomes of the meetings
e
Subjects under focus
*
Brief Introduction from the Group
e
Review Material for Consideration
e
Start Power Point Topics
e
Closing Remarks
GMSA Management Services Inc.
+ 11023 Pencewood Court, Suite A. Austin TX + 78750
512.250.5164 Ph 512.250.5439 Faxt gedwards(@gmasmanagement.com t llasdon@austin.rr.com

Page 14

You are invited to two
we
Pro/ Con ciecustiors fer a community Swimming pool facility.
Leeation: 1000 Old mit Real * Heel By: “Wilrcon Tras Counties fe
I
Date: Saturday November 8, 2008
Open from: 1:00
Date: Monday, November 17, 2008
Open From: 6:00 p. m. until 9: 00. pm.
:
(For full information go to: www.wtcmud 1.org)
For questions please contact: Laraine Lasdon, LLA Inc. LLasdon@austin.rr.com 512.345.8440
: Come by for slo : ‘as you like te provide your input.
You can attend one or both meetings.

Page 15

Page 16

SN,
Williamson-Travis
Counties Mud#1
Welcome to the Public Involvement
forum for the Swimming Pool Facility
eth
a ed
Mission Statement
Williamson Travis Counties
MUD#1
+ The Mission of the Williamson Travis
Counties MUD #1 is to provide reliable,
high quality water and sewer service,
waste management, fire protection, and
park amenities, in an efficient, cost
effective manner and an environmentally
sensitive way that provides a high level of
customer satisfaction.
~
Purpose
+ To provide your opinion for/against a
swimming pool facility to provide
information to Board for
consideration in their process.
=o
Goals and Objectives
* To hear from each affected
community citizen in this process.
- To keep the process fair and open
To Provide input as it is given to the
board for assessment
+ To listen and record the information
for reporting
=o

Page 17

Facilitation Times for
the Project
+ Saturday, November 8, 2008
+ 2:00 p.m. - 3:00 p.m.
+ 4:00 p.m. - 3:00 p.m.
+ Mud#1 Office
* Monday, November 17, 2008
+ 6:30 p.m. ~ 7:30 p.m.
+ 8:00 p.m. - 9:00 p.m.
+ Mud# Office
=
—_
Contact Information
+ Laraine Lasdon
+ 512.345.8440
+ ilasdon@austin.rr.com
+ Williamson-Travis Counties Mud##1
for updates to process
=e
|
LOCATION
AMENITIES
=e

Page 18

SIZE OF POOL
+ Based on engineering study
a
eal
Hours of Operations AY
=e
=o
Usage of the pool
"|
Hours of Operation
=o

Page 19

Months of Operation
=e
Revenue Opportunities
5)
Agee)
Fees for all entries
+ Special Events
* Access
=o
Financial Options
* Maintenance
+ Management Options
+ Life Guards
+ Special Events
+ Entry Personal
+ Management Company
+ Design and Development
* Property Cost
+ Return on Investment/Expense
ee

Page 20

Funding Information
+ Grants are an option
* Bond Packages are not an option
=e
Additional Comments
=e
eh
an cat, ae

Page 21

Page 22

INPUT METHODS
a : . jae
survey will be posted and available for seven days
oe “after each forum. The survey will not be available the days of
the forum.
_@ The forums are also open to the community as an
opportunity to walk through the facility and view the
materials that identify the project. You may choose to
engage in conversations with their neighbors and listen to
parts of the forum.
This format provides the opportunity for interested and
affected parties to review, react, and respond to draft
proposals. Although the forums. will be open for a set
period, there will be two facilitated sessions within each
forum, for each day; including Q&A. They forum times
are:
Saturday, November 8, 2008; Facilitated Times
2:00 p.m. - 3:00 p.m.
4:00 p.m. - 5:00 p.m.
Monday, November 17, 2008, Facilitated Times
6:30 p.m. - 7:30 p.m.
8:00 p.m. - 9:00 p.m.
Direct Email to consultant: llasdon@austin.rr.com
Haone call to the consultant: 512.345.8440.
Ote: Each method of input will be indicated on the input
eet for each person, (walk-through, facilitated session,
fail, phone, survey). If more than one input method is
chosen, it will also be noted.
Thank You. SEE YOU THERE
Sponsored by: Williamson-Travis Counties MUD Board

Page 23

Page 24

SECTION
TWO
GMSA Management Services Inc. + 11023 Pencewood Court, Suite A. tAustin TX + 78750
512.250.5164 tPh 512.250.5439 Fax} gedwards@gmasmanagement.com f jlasdon@austin.sr.com

Page 25

Constant Contact : Surveys : Survey Layout
Page 1 of 6
MyAccount
j
Pricing
}
GetHelp
ee
Constant Contact’
Welcome, Gigi
| Logout
ay
Maintenance Notification: We will be performing system maintenance on Saturday November 22nd,
during this time, Please save your work accordingly, and we apologize for any inconvenience.
4rom 6am - 10am EST. Constant Contact will be unavailabie for usege
Surveys : Survey Layout @
Edit Survey
Current edit mode:
Questions/Layout
AddlEdit Skip Logic, LEE
Properties 1!
Numbering
@on
Cor
Question Separator
Norma!
Global Colors & Fonts 4:
Fonts & Colors
Body Background
“hy
Title Text
Georgia
‘pt
Av
‘Questions Text
Georgia
12
Ay
Answer Options Text
Georgia
Opt
http://ui.constantcontact.com/so/mav/survey/a07, e2eisip7fno2bhuc/ves/edit
.
11/20/2008

Page 26

Constant Contact : Surveys : Survey Layout
Page 3 of 6
Add here
> [Question] [Text]
[Page Break | <
http://ui.constantcontact.com/so/mav/survey/a07e2eisip7fno2bhuc/ves/edit
11/20/2008

Page 27

Constant Contact : Surveys : Survey Layout
Page 5 of 6
indicate the importance of the following.
Very
Somewhat
Somewhat
Very
Unimportant Unimportant Neutral Important
Important
ie}
ie}
oO
oO
o000:00°.0
oO
oO
e)
Oo
o00000
9
Pook
10)
te}
oO
Oo
a00000
oO
;
ie)
oO
ie)
Oo
900000:
0:
ie}
o
o
oO
9g000C9O
OO
es
Oo
o
o
_O
oo0o00cno
oO
Oo
Oo
o
Oo
oo0o000
0c
ie)
oO
5
o
ooo 000
6
Oo
oO
1@)
o
oo0o000
CC
f the
o
O)
@)
oO
ono 0000
ie)
fadtens) tet
Addnere
>
[OG
Add here
> [Guestion” [Text [ Page Break |
<
http://ui.constantcontact.com/so/mav/survey/a07e2eisip7 fno2bhuc/ves/edit
.
11/20/2008

Page 28

stant Contact : Surveys : Overail Kesuits
http://u1.constantcontact.com/so/rmav/survey/a07eZelsip7ino2
bhuc/repo...
.
MyAccount
{
Pricing
{
Get Help
Constant Contact®
Welcome, Gigi
| Logout
AW user commny
From emails fo web content in minutes! Add Email Archive to your account today.
Close
Surveys : Overall Results @ 22
Listen’
Oike Sines
Williamson-Travis Counties Mud1 Official Survey
Survey Details | Overall Resutts
|
Individual Results | Invitation Results
Results View: Partial
& Completed
-
Update View
«i!
41 Response(s) *?
|
Filter these respondents i!
TE
Export results
to: - Select
a file type -
:
Export i
Click a value under ‘Number of Responses' to view those respondents and save them to a List.
(For rating and ranking questions click on ‘Show Details’ first. Not available for open-ended text and collect personal information questions.)
Text Block:
The purpose of this survey is to provide you an opportunity to share your opinion with the WTCMUD#1 Board on
the topic of considering a swimming poo! facility within the District.
This topic is a discussion item because over 400 neighbors in your community signed a partition asking the Board
to consider building a swimming poo! facility in the neighborhood. The Board, in the interest of public input,
developed this process for a forum for the community.
The Board will use the community's input to gain information that will help in the evaluation process. This Survey
will be available for seven (7) days starting November 20, 2008.
Please take a few moments to complete this survey.
1
Please enter the information indicated below.
Remember, you can import these responses into your Contacts. View the answers to do this.
Number of
Answer
Response(s)
First Name
37
Last Name
37
Email Address
37
Address 1
37
Address 2
14
View answers
2 Please enter your age range
Number
of Response
Answer
0%
100% Response(s)
Ratio
under 30
0
0.0%
30-39
14
32.5%
40-49
16
37.2%
/2008 12:22 AM

Page 29

“stant Contact : Surveys : Overall Results
http://u1.constantcontact.com/so/mav/survey/aU
/eZeisip /inozbhuc/repo...
Word of Month
6
14.6%
Through a friend
5
12.1%
On the Internet
6
14.6%
While passing the event
ie}
0.0%
location
Other (View all
§
12.1%
Totals
41
100%
View comments (3
2% Why did you attend our event? Select all that apply.
Number of Response
Answer
0%
100%
Response(s)
Ratio
To get additional
44
24.5%
information
Interest in event topic
8
14.0%
To voice my opinion about
44
24.5%
the project
Other (View all)
14
24.5%
Totals
57
100%
View comments (7)
2% How did you participate in the forum?
Number of Response
Answer
0%
100% Response(s)
Ratio
t walked through the roc
2
5.5%
with a facilitator.
I sat in on the Public
44
20.3%
Involvement Process.
| walked through the room
6
11.1%
alone and put notes on
the board.
| picked: up the materials
3
5%
without speaking with
anyone.
1 received my information
g
16.6%
from someone that
attended the forum.
I did not attend either
Az
31.4%
forum
Other (View all
2
3.7%
Totals
54
100%
View comments (3)
+ What is your level of satisfaction with the Public Input Process?
Number of Response
Answer
0%
100% Response(s)
Ratio
Very satisfied
8
19.5%
Somewhat satisfied
6
14.6%
12/8/2008 12:22 AM

Page 30

‘”_ stant Contact : Surveys : Overall Results
http://ul.constantcontact.com/so/mav/survey/a07eZeisip7ino2bhuc/repo...
Number of Response
Answer
0%
100% Response(s)
Ratio
Very likely
15
36.5%
Somewhat likely
14
34.1%
Neutral
9
21.9%
Somewhat unlikely
2
48%
Very unlikely
4
24%
No Response(s)
(9)
0.0%
Totals
41
100%
14
How likely are you to recommend this event to a friend or colleague?
~
Number of Response
Answer
0%
100% Response(s)
Ratio
Very likely
45
36.5%
Somewhat likely -
40
24.3%
Neutral
at
26.8%
Somewhat unlikely
2
4.8%
Very unlikely
2
48%
No Response(s)
1
2.4%
Totals
“41
100%
a
15
46 What comments would you like to share with the Williamson-Travis Counties MUD#1
Board?
Number of
Response(s)
View Text Answers
40
’ top
~
Copyright © 1999-2008 Constant Contact, Inc.
Refer a Friend | Customer Support
All Rights Reserved
12/8/2008 12:22 AM

Page 31

WUD LATE WUE 2 IEEE Ye NAAR BRO
A
*’“pENWV
*
we
*
My.Account
|
Pricing
|
Get Help
Constant Contact”
Welcome, Gigi
| Logout
Maintenance Notification: We will be performing system maintenance on Saturday December 20th, from 7am - 9am
Close
EST. Constant Contact will be unavailable for usage during this time. Please save your work accordingly, and we
apologize for any inconvenience.
2 Lsarcommun
Surveys : Overall Results
Williamson-Travis Counties Mud1 Official Survey
Survey Details
|
Overall Results
|
Individual Results
|
Invitation Results
Back
Text answer(s) for:
18
2 What comments would you like to share with the Williamson-Travis Counties MUD#1 Board?
40 Response(s)
at
>
&
10 per page
Update
Answer
Respondent
None.
Anonymous
None
Anonymous
Jap lanes? increased rate in taxes?
Anonymous
None
Anonymous
A community poo! would be @ tremendous asset
Anonymous
.
Anonymous
We are in desperate need of a local pool.
Anonymous
No pool, its not needed, and would detract from th
Anonymous
none
Anonymous
location of pool??
Anonymous
ot
|
& ® — toperpage
| Update
|
Atop
Copyright © 1999-2008 Constant Contact, Inc,
All Rights Reserved
nd
|
Customer Support
http://ui.constantcontact.com/so/rmav/survey/a07e2eisip7fno2bhuc/report/listOpenTextRe...
12/18/2008

Page 32

WULSLALE UULLLACL . OULVEYDS . UVOLaL NODULES . INOS PUUUCHLS
eS
MyAccount
|
Pricing
|
Get Help
.
a af 7
Constant Contact’
Welcome, Gigi
| Logout
Maintenance Notification: We will be performing system maintenance on Saturday December 20th, from 7am - Sam
Close
EST. Constant Contact will be unavailable for usage during this time. Please save your work accordingly, and we
apologize for any inconvenience.
scerms ty
Surveys : Overall Results
‘Orde Svs
Williamson-Travis Counties Mud1 Official Survey
Survey Details
|
Overall Results
|
Individual Results
|
Invitation Results
Back
Text answer(s) for:
15
2 What comments would you like to share with the Williamson-Travis Counties MUD#1 Board?
40 Response(s)
a4, >
10 per page
Update
Answer
Respondent
Exercise fiscal constraint,consider tax implicatio
Anonymous
Against the pool.
Anonymous
None
Anonymous
[am a committed swimmer & want a pool.
Anonymous
dont want the financial burden of a pool
Anonymous
PLEASE DON'T WRECK OUR PARK WITH A POOL
Anonymous
A pool in this area would be a great addition.
Anonymous
none
Anonymous
pool very important for this community-want done!
Anonymous
None at this time.
Anonymous
a 4h &
10 per page
“top
revere 2000-2008 Constant Contact, Ine.
ReferaEriend | Customer Support
http://ui.constantcontact.com/so/rnav/survey/a07e2eisip7fno2bhuc/report/listOpenTextRe...
12/18/2008

Page 33

Page 34

Public Input Forum for Mud#1
Return on Investment /Expense
ROI
=
What will the cost of the
pool be per resident to
build and operate?
Pool may increase values
overall but will it
decrease values of
homes around the park?
What is NVP of future
tax increases-increase in
value
Will older homes
increase in value?
Enough to offset fees?
Get an expert to address
property values

Page 35

Public Input Forum for Mud#1
Maintenance/Management
Maintenance
[| External Management ||
Limit “light polution”
noise and trash
Life Guards
Special Events
Entry Personnel
Life Guards area
Kichenette Area
There are companies
who specialize in pool
management — handle
everything even
lifeguard duties, liability
issues
Entry Personnel
Landscape company to
maintain area and
park/trash etc
Management Company
Adherence to
maintenance dates
Liability Compliance
Address the number of
people using the pool
Land Scapes
Notification of
development schedule
Equipment operated
specifications
Swimsuit required

Page 36

Public Input Forum for Mud#1
Amenities
Amenities
Showers
Lights for late evening
swimming
Table/picnic areas for
food
Splash pad for kids
Water slide
Shade/covered pergola
for picnics
Gazebo is in need of
repair, replace it.
Kitchenette

Page 37

Public Input Forum for Mud#1
Revenue Opportunities
Revenue
Opportunities
Revenue
Opportunities
Austin Community
College
Swim lessons given by
other entities
Special events
Private parties
Leasing the pool is good
but not if impossible for
residents to use the pool
Rental Opportunities
Competitive Swimming
Special events
Rental opportunities
Charging a low cost for
parties will help offset
M&D costs
How do we know that
the money being
generated will go to the
pool?
Access card - $30
replacement or cheap
replacement?
Penalty for handing out
cards — fines
Diving Board
Life guard training
Non-residents higher fee
for usage
Family fee, Singles,
Senior rates
Card replacement fees
Concession/Vending
Local area swim
lessons/training
Weddings
LISD swimming classes

Page 38

Public Input Forum for Mud#1
Grants/Open Comments
Grants
Open Comments
There is
a commitment
for a grant writer/and/or
others who have
committed to help write
and submit grants:
meters Parks and
Wildlife (Fed grant)
Great idea
If most residents want 5
ft that’s OK/ 4ft OK too
Grants may be available
for offsetting some costs
— Texas Parks and
Wildlife —
Grant writer found who
has offered to write and
submit grant $500,000
matching grant —
matching can be in-kind
Pool should be graded to
accommodate young
children swimming
6 swim lanes?
8ft for diving ~ insurance
issues?
25 meters is competition
size
Bond monies can be
used for some items but
not for construction
Rope off lanes for lap
swimmers

Page 39

Public Input Forum for Mud#1
Location/Property Cost
Location
Property Cost
Ask people who live
around the pool
Save the trees
Mud owns the property
Move parking lot close to
the pool
Renters consider in the
location process.
Can pool be located
where volleyball court
and gazebo are now?
Volleyball court can be
moved to back of
property near. tennis
courts
Could some other areas
of park not much used
be used for pool
location? Replace some
things?

Page 40

Public Input Forum for Mud#1
Financial Considerations
Financial Cost
Financial Cost
Heating cost for year
round operations
production schedule
Sources of income
Cost to residents who
don’t want the facility
What can LISD pay to
use pool to offset
expenses?
Cost per family
Controlling Cost
Ongoing cost
Insurance for Diving

Page 41

Public Input Forum for Mud#1
Months/Hours Operation
Months of Operation
Hours of Operation
Memorial Day/Labor Day
Holidays
Use the standard for
other pools
Do we want the pool
open during school
hours?
Year round option
Don't close too soon
after Labor Day.
Late at night?
6am-10-00pm
10.00am-8.00pm
Weekdays/Seasons
Don’t heat in the
summer.
Leave it to the
management company
Summer only
Limit “light pollution”,
noise and trash
Mid April to Mid
September
dedicated for lap
swimmers, other uses
What are non-standard
hours year around
What do other
communities do with
their hours?
Summer should have
early opening to
accommodate the heat.

Page 42

Page 43

Section
Three
GMSA Management Services Inc. ¢
11023 Pencewood Court, Suite A. tAustin TX } 78750
512.250.5164 tPh 512.250.5439 Faxt gedwards@gmasmanagement.com * lasdon@austin.rr.com

Page 44

:
SY
FF Na Pencewood Ct, Suite A
Austin TX 78750
www.gmsamanagement.com
WTCMud#1
Public Input Forums
5

Page 45

7} Nie Pencewood Ct, Suite A
/ X
tin TX 78750
www.gmsamanagement.com
WTCMud#1
Public Input Forums

Page 46

wn :
Public Input Forums
<
Ry
=
2
a
3
ov
8
5
oO
co
o
o
i=
S
ht
Pa
=
oy
=
o
D
2
&
o®
¢
5
SG
xe
—
oc
2
3
<q
WTCMud#1

Page 47

INS
Pencewood Ct, Suite A
Austin TX 78750
www.gmsamanagement.com
WTCMud#1
Public Input Forums

Page 48

Stakeholder
Notes
GMSA Management Services inc. ¢ 11023 Pencewood Court, Suite A. fAustin TX + 78750
512.250.5164 tPh 512.250.5439 Faxt gedwards@gmasmanagement.com Ff lasdon@austin.rr.com

Page 49

DOUrvey » WYUCSUUEDS
Lage ivi
Williamson-Travis Counties MUD1 Official Survey
*e Required Question(s)
The purpose of this survey is to provide you an opportunity to share your opinion with the WTCMUD#1
Board on the topic of considering a swimming pool facility within the District.
This topic is a discussion item because over 400 neighbors in your community signed a partition asking
the Board to consider building a swimming pool facility in the neighborhood. The Board, in the interest of
public input, developed this process for a forum for the community.
The Board will use the community's input to gain information that will help in the evaluation process. This
Survey will be available for seven (7) days starting November 20, 2008.
Please take a few moments to complete this survey.
1. Please enter the information indicated below.
By entering my personal information, | consent to receive email communications from the survey author's organization based on the
information collected.
First Name:
Last Name:
Email Address:
emailaddress@xyz.com
Address 1:
Address 2:
> 2. Please enter your age range
i
under 30
[J 30-39
[40-49
fo] 80-59
fy eo
°& 3. Number of people in your family.
1
2
3
6+
°K 4. How interested are you in the consideration of this project?
Not at all
http://survey.constantcontact.com/: survey/a07e2eisip7fno2bhuc/_tmp/questions
12/1/2008

Page 50

Catendar
Gmail
Compose Mait
Inbox (25)
Starred
Chats
Sant Mat
Orats
AL Baul
Spam (24)
Trash
Contacts
Gigi Bryant
Search, add, or invite
more ¥
Search Mail
Calvert Homeschool - www.CalvertSchool.org - Academically Stimulating Curriculum Inspires Children To Do Thelr Best,
«Back
to Inbox
Archive
Report Spam
Delete
More Actions
Inbox
X
RE: MUD1 pool
Laraine Lasdon te David, me
show detaijs 4:26 PM (20 hours ago)
Reply
Thanks for your email response. It will be included in the record.
Laraine
Laraine Lasdon
LLA, Ine
www. developyourbusiness.net
all PSRSEAMERY RRA
127036My*%20Documents SNM
Labels
[Gmail]Trash
Andermill mudd
dips
june
LSAFC
mike
mudd
online orders
Rotery
Software tools
Edit labets
Invite
a friend
Give Gmail to:
Sond vin 50 left
Preview invite
SHI
04 pM GTA
9. 201nitiat%20P.
To: lesdon@euctarcon
rr.com
Subject: RE: MUD1 poo!
I looked at the survey but since it didn't really contain info about the pool, I'll simply
add a comment section to this email.
Comments on proposed pool:
The addition of a pool adds a tax burden on all residents, not just the residents who
use the pool.
Has the alternative of adding membership availability to E. Mitburn poo! or another
pooi been investigated
for residents of WTCMUD1? This would allow residents who wanted use of a pool close
to home to
become members and not penalize the entire district.
The traffic in the area of the school and Anderson Mill Park is already a source of
congestion. Adding another facility with increased traffic and greater parking
requirements will have an impact on an already congested area.
The added noise of a public facility becomes another burden on homeowners close to
the site.
The web site mentioned that a petition with 400 signatures had been submitted. How
many households total are there in the WTCMUD1 district? Were the signatures
limited to one per household or open to any resident? Another way to ask the
question is, what was the percentage of households in the district that signed the
petition to investigate adding a pool?
There was mention that a decision on the pool was targeted to be made before the
end of year. I would hope that more information would be available to the residents
before that decision is made
Slat
x20
ese?
Wear
TS NEV DEBS SeSS AS SHEET
Hi,
http://mail.google.com/mail/2ui=2&view=bsp&ver=l qygpcgurkovy
Lappy tue
Sponsored
Link <>
«Newer
9 of 96 Glder »
New window
Print all
‘Sponsored Links
Senior Care e-Learning
Highest Quality Interactive Courses
‘with Tracking for Senior Care Staff
weew UpstairsSolutions com
3D Tratfic Visualization
Animation and Video Production
for Transportation and Urban Design
amy ne2s.comitranspertation
Tuf-BarrierTM Noise Wall
‘The
Code
‘won HitWatls,com
In-Depth Website Reports
Rapialy access, analyze, and share
website performance statistics.
‘eww ompiture com
Environmental Studies
University of San Francisca
Master's Program - Leam More Herel
rn ustea eduimsem
Advertise Your Web Site
Advertise Your Website Or Business
Opportunity To Millions Just $18.95
wow adclicksale.cam
Free Website Traffic?
Don’ Waste Your Time Elsewhere
Unti You See This Free Site Now
instantSuzz.com
Portable Traffic Signals
‘Solar Powered Traffic Signals
Rent or Purchase from Manufacturer
wiew NerthAmerica Traffic. com
More about...
Nursing Home »
Weather Testi «
Traffic
Impact Stucies »
Long Term Care Fazilty Residents ©
Abeut these links
.
12/11/2008

Page 51